TOD :,NSULTING
5.3 Formwork
Formwork class is to be in accordance with the architectural specifications
and the relevant Australian Standards. Tolcrances are to be suitable for
the purpose to which they are to be used, but shall not exceed a maximum
deviation of 6mm measured over a 3 meter straight edge. Permanent steel
formwork (Condek or similar) may be used in internal areas to support
Suspended concrete slabs, and must be rigidly propped in accordance with
the supplier's written specification.
5.4 Structural Steel
Structural steel elements of the building will be designed in accordance
with the relevant codes. These elements will have a design durability
which complies with AS/NZS 4100. All external steel and exposed
internal steel shall be hot dipped galvanised and painted with 2 coats of an
approved high-build zinc-rich epoxy paint.
5.5 Screw Piling
All screw piling is to be hot dipped galvanised and epoxy painted for the
upper 2m, as well as tilled with concrete grout.
6.0 Structural Framing System
6.1 General Structural System:
The proposed building is a two-storey reinforced concrete structure with a
reinforced concrete contiguous piled retaining wall system to support
excavations of approximately 2-5m. A mixture of grout replacement piles
and concrete-filled galvanised screw piles are proposed to support vertical
loads, and a range of raking galvanised screw piles or tie-back anchors are
intended to provide horizontal stability to the foundation by acting in
either tension or compression.
Structural System Summary:
• 600mm diameter contiguous CFA piled retaining walls, founded
sufficiently below excavation level to provide vertical capacity and
passive resistance to horizontal soil pressures
• Isolated 600mm diameter CFA concrete piles
• Screw piles ranging from 50-80T to support column loads
• Raking screw piles to provide horizontal resistance to soil loads, wind
and earthquake loads
• Reinforced concrete ground beams and slabs will be used to provide
adequate permanent horizontal "strutting" of retaining walls and
rotational stability to pile/slab/upper column connections, and to resist
bending moments caused by pile eccentricity
• Sub-floor areas will be drained to relieve any potential build-up of
ground water pressure
13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
2008/0169 Response to information request - 71 Seaview Tce Sunshine BeachRelated documentApplication case desk ↗
About this file
- File size
- 31.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.