2008/0169 Response to information request - 71 Seaview Tce Sunshine Beach · 132008.169
Very large file (31.0 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
TOD
• Areas behind contiguous piled walls will he fully drained by using
drilled-in steel "wick" drains, connected through the base of the wall
and discharged appropriately
• Upper structure comprises reinforced concrete columns, walls and
beam/slab system
• Roof spans vary up to 12m, requiring lm-2m deep cambered concrete
beams
• Roof/driveway slab will need a high grade trafficable waterproof
membrane or a trafficable slab may be considered over an insulated
waterproofing layer on the structural slab
• Garden terrace areas will be generally constructed on screw piles,
ground beams and suspended slabs over voids to avoid imposing
additional soil loads to the steep sandy slopes
The pool/bedroom area, etc will be constructed of concrete slabs and
beams supported on galvanised screw piles penetrating at least 5m
below the 27° slip line, projected from the base of the slope, and 7m
below natural ground
• The elevated timber walkway running east-west from R.L.34 to
R.L.26.2 will be supported on 7-8m deep piles, designed to withstand
lateral drag of the loose surface sands.
6.2 Lateral Resistance
The lateral resistance to wind, earthquake and lateral soil forces will be
provided by reinforced concrete and hlockwork bracing walls, cross
bracing, and a combined column/beam framing action. Raking tension
and compression piles will be designed and certified by others based on
their own design-construction methods and shall have the capacity to
safely resist horizontal loads from wind, earthquake and lateral soil
pressures, with a permanent factor of safety against sliding exceeding 2.0.
It is clear that the construction of the fully strutted and braced deep
contiguous piled walls will add significantly to the general stability of the
slope and of the areas uphill from all sections of new work, including the
adjacent properties.
6.3 Drainage
The areas behind the contiguous piled retaining walls will be drained by
the use of vertical perforated "wick" drains at approximately 4m centres,
connected through the piled wall just at the underside of the floor slab
level.
The design will include 100mm sleeved agricultural drain lines in gravel
and geotextile at the bottom of all retaining walls and under all floor slabs
in cut areas throughout the building.
Properly designed temporary and permanent drainage and silt collection
must be installed to avoid the risk of surface sands washing off site, during
and after construction of the project.
14
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
2008/0169 Response to information request - 71 Seaview Tce Sunshine BeachRelated documentApplication case desk ↗
About this file
- File size
- 31.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.