GENERAL NOTES                                                                                         STEELWORK                                                                                  STAINLESS STEEL
1    THESE DRAWINGS ARE TO BE READ N CONJUNCTION WITH THE ARCHITECT'S                                 1     ALL STEELWORK IS TO BE EXECUTED IN ACCORDANCE WITH THE CURRENT EDITION               I GRADE
     AND LANDSCAPE ARCHITECT'S DRAWINGS AND THE SPECIFICATION                                               OF AS 4100 - SAA STEEL STRUCTURES                                                      ALL BOLTS SHALL BE GRADE 336 TUNS S31600) AA-70
     ANY DISCREPANCY TO BE REFERRED TO THE ENGINEER N WRITING                                                  AS 1554 - SAA STRUCTURAL STEEL WELDING                                              NUTS SHALL BE DUPLEX 220S GRADE IONS S318031
     SET OUT TO BE DONE BY SURVEY USING DIGITAL FILE OF THE ARCHITECTS                                         AS 1627 - METAL FINISHING - PREPARATION AND PRETREATMENT OF SURFACES
     DRAWINGS IN CONJUNCTION WITH NECESSARY CRITICAL ON-SITE
                                                                                                                                                                                                 2 WASHERS SHALL BE 316 (UNS S316001, ELECTROPOLISHED OR PASSIVATED IN A
     DIMENSIONS AND CLEARANCES                                                                        2     TWO COPIES OF SHOP DETAIL DRAWINGS ARE TO BE SUBMITTED TO THE ENGINEER AND             207. TO 25% NITRIC ACID SOLUTION FOR AT LEAST 30 MINUTES AT 40'C TO 60'C
                                                                                                            ARCHITECT AND APPROVAL OF SAME OBTAINED PRIOR TO COMMENCING                            IN ACCORDANCE WITH ASTMA380
2    ALL DIMENSIONS ARE TO BE CHECKED ON SITE BEFORE WORK COMMENCES                                         FABRICATION                                                                          3 NUTS AND BOLTS SHALL COMPLY WITH ISO 3506 IDENTIFICATIONS OR . IF NOT SO
3    DIMENSIONS SHALL NOT BE OBTAINED BY SCALING THE STRUCTURAL DRAWINGS                                                                                                                           MARKED, SHALL BE PROVIDED WITH MILL OR NATA CERTIFIED TESTS RESULTS
                                                                                                      3     UNLESS OTHERWISE NOTED THE SIZE OF THE FILLET WELDS SHALL BE 6 mm
4    THE FOUNDATION MATERIAL TO BE CHECKED BY GEOTECMNI(AL ENGINEER                                                                                                                                CONFIRMING GRADE AND STRENGTH
                                                                                                      A.    ALL STEELWORK UNLESS OTHERWISE NOTED, SPECIFIED OR APPROVED. SHALL BE HOT
     BEFORE THE POURING OF THE FOUNDATIONS IS COMMENCED
                                                                                                            DIPPED GALVANISED INCLUDING NUTS, BOLTS and WASHERS TO AS 1650                       4 BOTH SHALL HAVE ROLLED THREADS THE NUTS AND WASHERS SHALL BE
S    THE FOUNDATION MATERIAL MUST BE CAPABLE OF WITHSTANDING A BEARING
                                                                                                      S     STEELWORK ENCASED IN CONCRETE SHALL BE PAINTED WITH AN APPROVED HIGH BUILD             ELECTROPOLISHED OR PASSIVATED IN A 20' TO 25' INTRIC ACID SOLUTION FOR
     PRESSURE OF NOT LESS THAN      200 APa                                                                 2-PART MARINE EPOXY                                                                     A LEAST 30 MINUTES AT 40'C TO 60'C IN ACCORDANCE WITH ASTMA380
6    THE STRUCTURES HAVE BEEN DESIGNED TO CARRY THE FOLLOWING LIVE LOADS -                                  WITH 10 GAUGE (3.25 mm) BLACK WIRE AT 100 mm PITCH. 50 mm (OVER
                    BALCONYS     S.0 We       INTERNAL AREAS 3.0 APa                                                                                                                             S BOLTS SHALL BE TIGHTENED TO THE MANUFACTURER'S RECOMMENDED TORQUE USING A
                                                                                                      6     THE STEEL FABRICATOR SHALL PROVIDE ALL BOLTS NECESSARY FOR THE ERECTION
7    THE STRUCTURES HAVE BEEN DESIGNED FOR THE FOLLOWING WIND LOADS -                                                                                                                              TORQUE WRENCH NUTS SHALL BE LUBRICATED WITH A NICKEL BASED.
                                                                                                            OF THE STEELWORK AND BOLT HOLES AND CLEATS          NECESSARY FOR THE ERECTION
                 DESIGN GUST WIND SPEED [PERMISSIBLE STRESS METHOD[                                                                                                                                ANTI-SEIZE LUBRICANT SUBJECT TO THE APPROVAL OF THE SUPERINTENDENT
                                                                                                            OF TIMBER WORK AS SHOWN. NOTED OR IMPLIED ON THESE DRAWINGS OR THE
                    OF      55   MITERS/SE(   TERRAIN (ATEGORY 2
                                                                                                            ARCHITECT'S DRAWINGS AND SPECIFICATION
B    THE TIED-BACK CONTIGUOUS. PILED WALL SHALL BE DESIGNED AND CERTIFIED                             7     BOLTS SHALL BE 316 STAINLESS STEEL INSULATED FROM MEMBERS                            ALUMINIUM NOTES
     BY THE PILING CONTRACTOR'S RPED                                                                        HIGH STRENGTH STRUCTURAL BOLTS SHALL BE
9    THE CONTRACTOR SHALL PROVIDE A COMPLETE MAINTENANCE SCHEDULE AND                                       GRADE 08     COMMERCIAL BOLTS SMALL BE GRADE 46                                  I     ALL WORKMANSHIP AND MATERIALS SHALL COMPLY WITH AS1664
     WARRANTIES FOR THE PROJECT INCLUDING BUT NOT LIMITED TO.-                                        8     THE ROOF STRUCTURE HAS BEEN DESIGNED FOR NORMAL ROOF LOADS ONLY AND              2     ALUIIIIM SECTIONS SHALL (O PtY WITH A51734. ASR66 OR ASiS67
       SURFACE TREATMENT OF PRECAST BEAMS AND PILES                                                         DOES NOT ALLOW FOR ANY EXTRANEOUS LOADS SUCH AS HOISTS. MONORAILS, ETC           3     ALL WELDING SHALL COMPLY WITH AS1665
       FLEXIBLE SEALANTS                                                                                    EXCEPT WHERE SHOWN ON DRAWINGS                                                   4     ALL WELDING SHALL BE MARRED OUT USING ARGON GAS SHIELDING
       TIMBER PRESERVATIVES
       PAINTED GALVANISED STEEL                                                                       9     WHEN SHOP SPLICES ARE NECESSARY N BEAMS OR TRUSSES THE POSITION OF               S     ALUMINIUM EXTRUSIONS SHALL BE ALLOY 606IT6
       ALUMINIUM                                                                                            THE SPLICES SHALL BE APPROVED BY THE ENGINEER SHOP SPLICES SMALL BE              6     PLATE IS TO BE ALLOY 5003 H321
       SURFACE SEALANTS OF STONEWORK AND GROUT
     a PROPRIETARY MORTARS AND GROUTS                                                                       COMPLETE PENETRATION BUTT WELDS                                                  T     TREAD PLATE IS TO BE ALLOY 52510134
                                                                                                                                                                                             8     BOLTS SHALL BE INSULATED FROM ALU*IUM BY THE USE OF A 1mm
TO   THE SET OUT OF STRUCTURAL PEMEBERS FOR THE PRE-(AST (NLRETE £TTY SHALL BE
     ENTIRELY DEPENDENT ON THE ACCURATE PLACEMENT OF THE P1 PILES, WNEH MUST                      ADDITIONAL STEELWORK NOTES                                                                       SLEEVE ON THE BOLT SHANK AND 3mm THICK NYLON WASHERS
     DETERMINE THE (EMIR[ LINE OF THE H.S. HEADSTOCK BEAMS. M PUS MKT BE PLACED                                                                                                                    UNDER BOLT HEAD AND NUT
                                                                                                           ALL STEELWORK TO BE HO GALVANIZED AND APPROVED
     WITHIN 100MI OF THEN DESIGNATED LOCATION. Tit (NTRACTOM MUST (ANY OUT A                               EPOXY PAINTED AFTER FABRICATION - ONO
     SLIMY OF THE AS (ON6TRUCTED PLES AND ONLY THEN PROCEED WITH CONSTRUCTION                                                                                                                                                                                                                 D      19.11.10       FOR APPROVAL
     K.S. HEADSTOCK. 814 82 BEARERS AND (8 EDGE BEAMS.
                                                                                                           ALL WELDS ARE TO BE 6mm CONTINUOUS FILLET
                                                                                                           WELDS . UNLESS NOTED OTHERWISE
                                                                                                                                                                                                 SEDIMENT / EROSION CONTROL                                                                   C      17.11.10       FOR APPROVAL
11   PROVIDE A FULL SET Of AS-(a61RU(TED ORAWBDS OF THE PROJECT. INIELUOING ALL PILE                       ALL EXPOSED SITE WELDS ARE TO BE WIRE BRUSHED
                                                                                                                                                                                                 REFER TO THE ENVIRONMENTAL MANAGEMENT PLAN FOR ADDITIONAL REQUIREMENTS                       B      12.11.10       PRELIMINARY ISSUE TO CONSULTANTS
                                                                                                           AND TO HAVE ZINC STICK APPLIED AND EPOXY PAINT
      LOCATIONS. DEPTHS, LOCATION AND LENGTH OF TIE BACK ANCHORS. GROW BEAMS, ITTY                         ALL SHS AND CHS TO BE 350 MPa GRADE STEEL                                                                                                                                          A      20.10.10       PRELBwIARY ISSUE 10 ARCHITECT
      SET OUT. CONCRETE WALL ETC.                                                                                                                                                                ALL AREAS SUBJECT TO FILLING TO BE TOPSOILED AND GRASS-SEEDED AS DIRECTED BY THE
                                                                                                                                                                                                 ENINEER UPON COMPLETION OF EARTHWORKS                                                                          m,..rw.e
12   ALL WORKS ARE TO BE CARRIED OUT N ACCOOAN(E WITH THE APPROVED ENVNOIBENTAL                                                                                                                                                                                                              L- 1 -
     MANAGEMENT MAN. I EIP I                                                                          TIMBER                                                                                     SEDIMENT FENCES/FILTER DAMS SHALL BE ERECTED AS DIRECTED BY THE ENGINEER UPON
                                                                                                                                                                                                 COMMENCEMENT OF EARTHWORKS AND SHALL BE MAINTAINED UNTIL GRASS COVER IS
                                                                                                      I     ALL THE WORK IN STRUCTURAL TIMBER IS TO BE EXECUTED IN ACCORDANCE WITH
                                                                                                                                                                                                 ESTABLISHED TO THE SATISFACTION OF THE ENGINEER SEDIMENT FENCES SHALL BE APPROVED
DESIGN LOADING CRITERIA                                                                                     THE CURRENT EDITION OF - AS 1604 • NATIONAL TIMBER FRAMING CODE
                                                                                                                                                                                                 SILT FENCE MESH ANCHORED BY STAR PICKETS AT MAXIMUM 20M CENTRES                              PROPOSED RESIDENCE
                                                                                                                                     AS 1720 • SAA TIMBER STRUCTURES CODE
RAMPS. DRIVEWAYS. DECKS WENCH CAN POSSIBLY BE ACCESSED BY LIGHT NANTENAN(EI VEHICLES.                                                  AS 1328 - GLUED LAMINATED STRUCTURAL TIMBER               MESH COVERS SHALL BE PLACED OVER FIELD INLETS PIT GRATES AND APPROVED AGGREGATE
S kPa DISTRIBUTED D kN PONE LOAD.                                                                     2     THE TIMBER USED MUST BELONG TO STRESS GRADE F17 (UNLESS NOTED OTHERWISE)             FILLED FILTER BLOCKS SHALL BE PLACED IN ALL SIDE-ENTRY PIT INLETS AND MAINTAINED IN          LOT 1
PEDESTRIAN BARRIERS: 15 kN/m HONZ 0.75 kN/m VERTICAL                                                        AS GIVEN IN THE CURRENT EDITION OF THE TIMBER ENGINEERING CODE                       POSITION TO PREVENT SILT ENTRY TO DRAINAGE SYSTEMS UNTIL REMOVAL IS APPROVED BY

RETAINING STRUCTURES. AS PER SOIL INVESTIGATION RECDMENDAIKK. MNMJM LATERAL SOIL
                                                                                                      3     ALL NUTS, BOLTS. WASHERS AND FRAMING ANCHORS TO BE 316 STAINLESS STEEL               THE ENGINEER.                                                                                71 SEAVIEW TERRACE
                                                                                                            FIX ALL FRAMING ANCHORS WITH STAINLESS STEEL NAILS                                   AT THE COMPLETION OF THE FILLING TO WITHIN 100MM OF THE FINISHED SURFACE LEVEL, A
PRESSURE CALCULATED USING HORIZONTAL BA(KFLL Co : 0.S SLOPE BA(OILL No : 0.9
SOIL DENSITY 18 kN/n3. INCLUDE HORIZONTAL FORCES FROM                                                 4     THE CONTRACTOR IS FINALLY TO TIGHTEN ALL BOLTS BEFORE HANDING OVER THE               LAYER OF TOPSOIL IS TO BE SPREAD OVER THE WHOLE OF THE EXPOSED EARTHWORKS AND                SUNSHINE BEACH
LIVE LOAD SURCHARGE x On.                                                                                   JOB FOR 12 AND 16mm BOLTS THE BOLT HOLES ARE TO BE 2mm OVER SIZE FOR                 LIGHTLY COMPACTED AND TRIMMED TO THE FINISHED SURFACE LEVEL AND GRASSED BY
CONSTRUCTION LOADS AS CALCULATED.
                                                                                                      S
                                                                                                            20mm BOLTS THE BOLT HOLES ARE TO BE 3mm OVER SIZE
                                                                                                            ALL TIMBER TO BE DURABILITY CLASS I AND TREATED TO HS
                                                                                                                                                                                                 SEEDING AS DIRECTED                                                                          for A. SLINGER
                                                                                                                                                                                                 FOLLOWING SEEDING THE SURFACE IS TO BE LIGHTLY HARROWED OR CULTIVATED TO IMBED THE
                                                                                                      6     INJECT LANOTEC GREASE INTO ALL BOLT HOLES
                                                                                                                                                                                                 SEED IN THE SOIL THE CONTRACTOR IS TO MAINTAIN THE GRASSED AREAS SO THAT AT THE
SLIP RATING                                                                                           7.    ALL PRESERVATIVE TREATMENTS FOR TIMBER MUST BE                                       COMPLETION OF THE MAINTENANCE PERIOD AT LEAST 75 V. OF EACH 4 SQUARE METRES HAS
                                                                                                            IN ACCORDANCE WITH AS1604.                                                           A DENSE LIVING COVER
I. SLIP RATING ON ANY ACCESSIBLE HORIZONTAL S'OFACE TO BE V TO AS AS06                                B.    COAT ALL S/S BOLTS. NUTS 0 WASHERS 6 FRAMING ANCHORS
                                                                                                            WITH DENSE LANOTEC GREASE.                                                           SEDIMENTATION CONTROLS SHALL COMPLY WITH REQUIREMENTS OF "SOIL EROSION AND SEDIMENT

 TEMPORARY WORKS                                                                                      9.    TIMBER DECKING TO BE F17 NO. HWO 140 a SO                                            CONTROL" - IE AUST ENGINEERING FOR QUEENSLAND                                                 MCU WORKS
                                                                                                            DURABILITY CLASS I TREATED TO HS FIXED WITH S/STEEL SCREWS.
1.    THE CONTRACTOR IS RESPONSIBLE FOR IM DESIGN CERTIFICATION AND APPROVALS OF ALL TEMPORARY              ALL TIMBER FRAMING TO BE F17 K.D. HARDWOOD.                                      PROTECTION OF TREES                                                                               GENERAL NOTES
STRUTTIGS, PROPPING. It BACKS, EXCAVATION SIDAIG. PROTECTION WORKS. (ONTO US PILING. EI(.
NECESSARY TO CARRY OUT THE WORKS.                                                                     EARTHWORKS NOTES                                                                       L ALL EX67K NATURAL VEGETATION THAT WILL BE 0E1ABE0, K 10 BE PROTECTED. 1NE AREA !IMMEDIATELY
2.     ALL TEMPORARY WORKS SHALL BE DESIGNED STRICTLY N ACCORDANCE WITH THE RELEVANT AUSTRALIAN                                                                                              BENEATH THEN CANOKS SHOLO BE DECLARED A 'TREE PROTECTION ZONE ' AND SNOLLD BE FENCED
STANDARDS AND LOCAL BY-LAWS TO WITHSTAND ALL EXPECTED AND SPECIFIED LOADINGS AS SET OUT IN                                                                                                   OFT AND APPROPRIATED SKRAQ ERECTED FOR THE DURATION OF THE SITE DEVELOPMENT AND
                                                                                                  1         SOILS CONTAINING ORGANIC MATTER ARE TO BE STRIPPED FROM THE
It[ CODES.                                                                                                                                                                                   CONSTRUCTION.
                                                                                                            SITE. THIS MATERIAL IS NOT SUITABLE FOR USE AS FILL ON THIS SITE.                2. REMOVAL OF TREE STUMPS N (LOSE PROXIMITY TO EM ROOT ZONES OF THE TREES TO BE RETAINED
3.    RE CONTRACTOR'S ATTENTION 6 DRAWN TO THE CLOSE PROXMTY OF ADJACENT BULOIFS AND                                                                                                         MUST BE DONE N A MANNER THAI WILL NOT NEGATMLY IPACI THE ROOT SYSTEM OF TM TREE BEING
                                                                                                                                                                                                                                                                                                  architect
THE NEED TO TAKE PARTICULAR CARE TO PROTECT THESE.                                                2         THE WHOLE OF BOTH TOLET BLOCK SITES. IS TO BE PROOF ROLLED
                                                                                                                                                                                             RETAINED. ON NO A((OUNT SHOULD ANY ATTEMPT N MADE TO EXCAVATE TREE STOPS TO AVOID
4.    THE CONTRACTOR MUST PROVOS A FULL AND (OPREHENSM WORK S(HEDULE PROGRAMME AND
                                                                                                            AND ANY UNSUITABLE GROUND . AS DIRECTED BY THE ENGINEER , IS
                                                                                                            TO BE EXCAVATED AND REMOVED FROM SITE. THIS MATERIAL IS TO BE
                                                                                                                                                                                             DAMAGE TO NTERTWIIRG ROOTS O THE TREES TO BE RETAINED.                                               gavin maddock
CONSTRUCION SITE PLAN. INCLUDING ALL MEANS OF ACCESS. TEMPORARY DRAINAGE. PROTECTIVE FENCING,                                                                                                3. THE AREA BENEATH THE CANIPES O TREES TO BE REMAND SHALL BE COVERED WITH A INMM
BARRIERS, BOARD[ GS. AND SGNASE.                                                                            REPLACED WITH IMPORTED APPROVED FILL.                                            LAYER OF BARK MUCH MATERIALS TO REDUCE SOIL MOISTURE LOSS, CONTROL WEED GROWTH AND TO
                                                                                                                                                                                             REDUCE SOL COMPACTION.
S      THE CONTRACTOR MGT PROVIDE A HEAL SAFETY PLAN. N(LLO IG EMERGENCY AND FIRST-AD             3         IMPORTED APPROVED FILL TO HAVE A MN. CBR SPECIFICATION Of 1S%                    4. ANY PRUNING OF CANOPY BRANCHES SHOULD ONLY BE UNDERTAKEN BY AN APPROVED ARBOB6T.
       PROCEDURES.                                                                                          MAX. STONE SIZE OF 100mm , MAX. PLASTICITY INDEX OF 20% AND
                                                                                                                                                                                             S. ON NO ACCOUNT SHOULD FERTILISER, HERBICIDE TREATMENTS OR SOL LEVEL CHANGES BE PERMITTED
6.     11 IS PROIBITED TO ALLOW ANY MATERIALS. RUBBISH. SOLS. WASTE, (MM ALS. SEDIMENT.                     MAX. LINEAR SHRINKAGE OF 10%. THIS FILL IS TO BE PLACED IN MAX.                  (LOSE 10 DR BENEATH THE CANOPIES O THE TREES.
ETC. TO FALL ONTO THE BEACH TIDAL ZONE OR SEAWATER. ANY EXCESS SOILS, SEOPIENT,                             200mm LAYERS AND COMPACTED TO ,..,                                               6. ALL CONTRACTORS SHOULD BE ADVISED OF THE PROTECTED AND VALUED NATURE O THE TREES
CONS1RUCTIDN RUBBISH ETC. ON SITE MUST BE SUITABLY (MANED, TO AVOID IT BONG A((KNiLY WASHED OR                                                                                               AND THAT NO MACHINERY, EQUIPMENT, FUEL, CONSTRUCTION MATERIALS, SHEDS ETC. SHOULD BE
BLOWN ONTO THE BEACH, OR INTO THE NATURAL VEGETATION ON THE LOWER PART OF THE SITE AND                          COHESIONLESS SOILS -        DENSITY INDEX NOT LESS THAN 10%                  PERMITTED TO BE PARKED DR STORED BENEATH THE CANOPY OF THE TREES.
NATIONAL PARK.                                                                                                                              ( AS 1289 TEST 5.6.1 I                           7. ON NO ACCOUNT SHOULD WASTE CONSTRUCTION MATERIALS INCLUDING FILL AND PARTICULARLY
                                                                                                                                                                                             WATER/WASHINGS FROM MACHINERY OR FROM CONCRETE CONSTRUCTIONS ETC. BE PERMITTED TO BE
                                                                                                                                                                                                                                                                                                  TODCONSULTIN
                                                                                                                SOILS CONTAINING (LAY - DENSITY RATIO NOT LESS THAN 98%
    SERVICES RELOCATION                                                                                         OR SILT FINES            STANDARD I AS 1289 TEST 5.1.1 I
                                                                                                                                                                                             DISPOSED WITIIN THE ROOT ZONE OF THE TREES.
                                                                                                                                                                                             8. COMPLETE TREE REMOVAL OR REDESIGN IS REQUIRED E ROOT PRUNING ACTIVITIES WILL BE 100                             ENGINEERS
I THE CONTRACTOR SHALL LOCATE AND IONIFY ALL RIGROUED SERVICES AMU CO-ORDINATE WITH THE                                                                                                      SEVERE TO MAINTAIN THE TREES STRUCTURAL INTEGRITY (SEVERITY DEPENDS OF ROOT DIAMETER,
                                                                                                  4         COMPACTION TESTING OF FILL LAYERS IS TO BE CARRIED OUT                           TRINE( DIAMETER AID DISTANCE FROM TRI6NI.
  RELEVANT UTILITY AUTHORITY IF AND WHERE THEY NEED TO BE RELOCATED AND/OR ESPECIALLY
                                                                                                            TO LEVEL 1 SUPERVISION STANDARD AS PER AS 3789-1990.                             9. ON NO ACCOUNT SHOULD ANY EXCAVATIONS FOR THE INSTALLATION FOR THE SERVICES BE MADE                            STRUCTURAL CIVIL
  PROTECTED DURING CONSTRUCTION,
                                                                                                  S                                                                                          CLOSER THAN 3 MIRES FROM THE BASE/TRUNK O THE TREES AND ALL EXCAVATIONS WITHIN 3M
2 METHODS OF RELOCATION AND/OR PROTECTION MEASURES SHALL BE APPROVED BY THE RELEVANT                        THE CONTRACTOR IS TO BE RESPONSIBLE FOR LOCATING ALL EXISTING
                                                                                                                                                                                             EACH SIDE O THE TREE SEDUM BE CARRIED OUT WITH (LOSE SUPERVISION O THE APPROVED ARBORIST.
  UTILITY AUTHORITY PRIOR TO COMMENCEMENT OF THE WORKS,                                                     SERVICES BEFORE COMMENCEMENT OF WORK ON SITE.                                    N. NO ROOTS N EXCESS OF SHIM ARE TO BE SEVERED WITHOUT ADVISE FROM THE APPROVED ARBORIT.                     TOO CONSULTING PTY. LTD.
                                                                                                                                                                                                                                                                                                                      AY WIN US MY
                                                                                                  6         THE CONTRACTOR IS TO PROVIDE COMPACTION TEST RESULTS TO THE                      N ALL CIRCUMSTANCES WHERE SEVERING O TREE ROOTS N EXCESS O 56111 N OAHETER HAS OCCURRED                                      - ^uI Noom.ne
    DILAPIDATION REPORT                                                                                     ENGINEER. THE COST OF THIS TESTING IS TO BE PAIR BY THE CONTRACTOR,
                                                                                                                                                                                             THE URGENT ATTENTION OF THE APPROVED ARBOIST WILL BE REQUIRED FOR TM TREATMENT AND DRESSING
                                                                                                                                                                                             O ROOT WORDS.
                                                                                                                                                                                                                                                                                                                7   3P:^ voowwu RC .Use
                                                                                                                                                                                                                                                                                                                           9100 I0. mP] jl."^• :;it




THE CONTRACTOR SHALL CARRY OUT A OTALED DILAPIDATION I EXISTING CONDITION I REPORT ON THE                                                                                                    It WHERE POSSIBLE CAREFUL EXPLORATORY TRENCHING GY HAND OR WATER IT) SHALL BE MARRED
ADJACENT LOTS S AND 6 TO THE WEST, AND LOT 2 ON THE SOUTH BOUNDARY. N (MUTATION WITH                  REPLACEMENT OF UNSUITABLE MATERIAL                                                     OUT TO A DEPTH OF 56@61 TO DETERMINE F LARGE ROOTS ARE PRESENT. SHOULD LARGE ROOTS BE
TOO CONSULTING ENGINEERS. SUBMIT 3 COPIES O THE REPORT 70 THE SUPERNRNDANT PRIOR TO                                                                                                          ENCOUNTERED THEY SHOULD BE BROUGHT TO THE ATTENTION O IM (ITT ARBORST.
COMMENCEMENT OF ANY PILING OPERATORS.                                                             AS THERE 6 A REASONABLE (RANEE O EXPOSING VOIDS AMD LOOSE MATERIALS ON THIS SITE.          0. WHERE UNDERGROUND SERVES ARE 10 BE 16TALLED WITHIN iHE ROOT ZINC OF A TREE.
                                                                                                  THE CONTRACTOR SHALL INCLUDE AN ALLOWANCE TO -                                             EXPLORATORY TREMIPG SHAD BE TARRED OUT. N ALL I6IAMES HERE A NUMBER O LARGE                      ••v
                                                                                                  L    REMOVE UP TO 50 m' O EXISTING UNSUITABLE MATERIAL, AND REPLACE MTN COMPACTED          ROOTS ARE ENCOUNTERED THESE SHOULD BE LEFT NTACT AND ANY SERVICES ETC INSTALLED By                          B. GEORGE            K. CAPPER          OCT 2010
                                                                                                       GRANULAR MATERIAL.                                                                    TIJIELLIG BENEATH THE ROOT MASS.
                                                                                                                                                                                             TO, EXCAVATIONS SHALL BE EXECUTED WITH EXTREME (ARE. ANY LARGE ROOTS THAT MAY BE                             H. GRAY          S. PRYSTLIPA
                                                                                                  2. PRESSURE GROUT LOCALLY 20 m' O 20mPo (EKNT SAND (ROUT.
                                                                                                  3. EXCAVATE 50 m' OF UNSUITABLE MATERIAL AND BACXFLL WITH ND-FITS CONCRETE.                ENCOUNTERED SHALL BE LEFT NTACT, KEPT FOIST, COVERED WITH HESSIAN OR SIMILAR MATERIALS TO
                                                                                                                                                                                             PREVENT DRYING AND LEFT FOR THE URGENT ATTENTION AND TREATMENT BY THE ARBORISi.                        •.    I     9                                     AHD
                                                                                                  4.        REMOVE AND RECOMPACT SO r' LOCALISED AREAS OF EXISTING APPROVED IJMOiACTED                                                                                                                                                      11
                                                                                                                                                                                             14. THE APPROVED AR ORIST IS TO BE ADVISED PRIOR TO THE BACKFLLIG O THE SERVICE TRENCHES
                                                                                                            MATERIAL.
                                                                                                  ALL THE ABOVE AS APPROVED AND DIRECTED BY THE SPi^A'EVENI
                                                                                                                                                                                             SO THAT PMOTOURAPI RECORDS CAN 61 TAKEN                                                                     09578                   Pi         A i E D

Used in these records

About this file

File size
31.0 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

2008_0169 Response to information request - 71 Seaview Tce Sunshine Beach.pdf · 31.0 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.