 REINFORCED CONCRETE                                                                                     SPECIFICATION FOR                                                                         CONTIGUOUS PILING
 1        ALL CONCRETE WORK IS TO BE EXECUTED IN ACCORDANCE WITH THE CURRENT                             EXTERNAL DURABLE CONCRETE                                                                1. CONTIGUOUS CONCRETE PILING TO BE 600 DIAMETER TO DEPTHS INDICATED ON PLANS AND SECTIONS.
           EDITION OF - AS 3600 - SAA CONCRETE STRUCTURES
                        AS 1379 - READY-FIXED CONCRETE                                                                                                                                            CONCRETE STRENGTH F'(: 32MPA. THE CONCRETE MX DEISGII IS TO BE DESIGNED BY THE CONTRACTOR
                                                                                                         I. ALL EXTERNAL CONCRETE IS TO BE S40 I SLABS ON GROUND TO BE 532 I N
                                                                                                                                                                                                  TO SUIT HIS NSTALLATIDN EOIIPMENT, IKLUDNG ANY APPROPRIATE PLASTICIZERS OR RETARDANTS.
 2        THE CONCRETE MIX SMALL BE APPROVED BY THE ENGINEER                                             ACCORDANCE WITH AS 1379. - MINIMUM EXTERNAL (OVER TO BE SOm.
          BEFORE USE - REFER ALSO TO DURABLE CONCRETE NOTES                                                                                                                                       PNMM CONCRETE COVER TO BE ISML THE PILING OPERATION MUST BE CARRIED OUT IN SIKH A WAY
                                                                                                         2. CEMENT COMPOSITION BY WEIGHT TO CONSIST OF 7S % TYPE GP CONFORMING TO
 3         THE 28 DAY CHARACTERISTIC COMPRESSIVE STRENGTH OF REINFORCED CONCRETE ltd                                                                                                              AS TO COMPLETELY AVOID THE RISK OF NECKING IN THE PILES, SO WITHDRAWAL RATE OF THE AUGER
                                                                                                         REQUIREMENTS OF AS 3972, 20% FLYASH CONFORMING TO REQUIREMENTS OF AS 3582.1 PART
          MUST NOT BE LESS THAN 40 MPG UNO         MINIMUM CEMENTITIOUS CONTENT TO                                                                                                                AND GROUT PRESSURES MUST BE CO-ORDINATED TO ENSURE A FULLY COMPACTED TOTAL CROSS
                                                                                                         I, AND S% "KAOLITE" FLYASH. KAOLITE IS A BRANDED PROPRIETARY PRODUCT BY CEMENT
          BE 450 Ng/m3       MAXIMUM WATER . CEMENT RATIO TO BE 0.4                                                                                                                               SECTION ALLOWING CENTRAL PLACEMENT OF THE REINFORCING (AGE, THE PILES SHALL FORM A FULL
                                                                                                         AUSTRALIA. AND SHOULD CONFORM WITH THEIR PRODUCT SPECIFICATION.
                                                                                                                                                                                                  CONTACT CONTIGUOUS STRUCTURE.
          CONCRETE SLABS ON GROUND TO BE F'c = 32 MPG IS321                                              3. SLUMPS SHALL BE AT LEAST TOOMM, BUT MAY NEED TO BE HIGHER FOR CONSTRUCTION
          MASS CONCRETE PIERS TO BE PC = 25MPG IS251                                                    REASONS SUCH AS PUMPING. SLUMP TOLERANCES, TESTING FREQUENCY AND REJECTION                2. NOMINAL DEPTHS OF CONTIGUOUS PILINGS ARE NIICATED IN THESE DOCUMENTS BASED ON THE
4         THE TEST RESULTS ARE TO CONFORM WITH THE ACCEPTABILITY REQUIREMENTS OF                         CRITERIA BASED ON SLUMP SHOD BE N ACCORDANCE WITH AS 1012.3.                             AVAILABLE SOILS INFORMATION.
          THE CURRENT EDITION OF AS 3600 (PROJECT ASSESSMENT REQUIRED)                                   4. MAX" IWATER (EMNTITIOUS CONTENT) RATIO FOR MIX TO BE 0.4. USE OF HIGH                 THE CONTRACTOR MUST REVIEW THE SOIL CONDITIONS N THE SOL REPORT. AND STUDY THE AVAILABLE
5         THE MAXIMUM SIZE OF AGGREGATE SHALL BE 20r                                                    RANGE WATER REDUCERS (PLASTICIZERS( ARE ALLOWED TO MAINTAIN REQUIRED SLUMPS               ACCESS ON SITE. TO ENSURE THE PROPOSED EQUIPMENT IS
6         THE CONCRETE SHALL SLUMP TEST AT MOOm. UNLESS OTHERWISE NOTED                                 WITHOUT ADDITIONAL WATER.                                                                 SUITABLE FOR THE PROJECT. DEPTHS AND DIAMETER OF CONTIGUOUS PILING MAY BE VARIED AT THE
7         ALL CONCRETE TO BE VIBRATED                                                                   S. INTENSE COMPACTION OF ALL CONCRETE ELEMENTS IS REQUIRED. A COMPLETE                    DISCRETION OF TOO CONSULTING ENGINEERS OR GEOTEDtl(AL ENGINEER DEPENDING ON CONDITIONS FOUND
8         NO HOLES OR CHASES OTHER THAN THOSE SHOWN ON THE STRUCTURAL                                   DOCUMENTATION OF THE INTENDED COMPACTION METHODS IS REQUIRED TO BE SUBMITTED BY           ON SITE.
          DRAWING SHALL BE MADE IN CONCRETE MEMBERS WITHOUT THE PRIOR APPROVAL                                                                                                                    3. THE CONTRACTOR SHALL RECORD ALL RELEVANT CONDITIONS ENCOUNTERED ON SITE INCLUDING
                                                                                                         THE CONCTRACTOR, AND FORMS PART OF THE REQUIRED TENDER SUBMITTAL DOCUMENTS. ALL
          OF THE ENGINEER
                                                                                                        METHODS MUST FOCUS ON THE GENERAL REQUIREMENT TO GUARANTEE OPTIMUM COMPACTION             VOLUMES OF FILL REMOVED. LEVELS OF GROUND WATER, DEPTH TO VARIOUS SOILS EG. DENSE
9         PLASTIC CHARS TO BE USED TO SUPPORT REINFORCEMENT AND GIVE THE
                                                                                                        AT ALL EXTERNAL SURFACES.                                                                 SAND / ROCK ETC, DEPTH TO BASE OF PILES. AND VOLUME OF CONCRETE USED IN EACH PILE.
          CORRECT CONCRETE (OVER
                                                                                                        6. PRE-CAST CONCRETE SHALL BE COMPACTED USK RIGID STEEL FORMS ON VIBRATING                4. THE SITE SMALL BE PROTECTED BY ADEQUATE APPROVED SILT AND EROSION CONTROL.
10        UNLESS OTHERWISE NOTED ON THE DRAWING THE CONCRETE COVER TO THE
          OUTSIDE FACE OF ANY REINFORCEMENT 15 TO BE AS FOLLOWS -
                                                                                                         TABLES AND / OR FORM VIBRATORS.
                                                                                                                                                                                                  S. TO PRESERVE AND PROTECT THE EXISTING TREES, IT IS ESSENTIAL THAT THE
                                                                                                        7. TO MINIMISE TM INCIDENCE O PLASTIC SHRINKAGE CRACKING, THE USE OF A PROPRIETARY
                                                                                                                                                                                                   CONTRACTOR EXERCISE EXTREME CARE WHEN CONSTRUCTING THE CONTIGUOUS
             STRUCTUGL        CAST AGAINST FOBS COMPLYING WITH                                          ALIPHATIC ALCOHOL PRODUCT TO MINIMISE EARLY AGE MOISTURE LOSS THROUGH EVAPORATION
             MEMBER           AS ISM SAA FORMWORK( (ODE                    CAST AGAINST                                                                                                            PILED WALLS.
                                                                           OTHER                        IS MANDATORY ON ALL FLATWORK SURFACES OF CONCRETE PLACEMENT WORK. TINS PRODUCT
                                                                           FORMWORK OR                                                                                                            6 ANY TEMPORARY TIE BACKS MUST BE REMOVED FROM ADJACENT PROPERITIES AFTER
                             NOT EXPOSED TO           EXPOSED TO WEATHER
                                                                           THE GROW
                                                                                                        SHALL BE APPLIED AS A SPRAY, OR ROLLER APPLIED, IMMEDIATELY AFTER SCREED AND
                             WEATHER GROUND WATER     GROUND WATER OR                                   BULFLOATING OF THE PLASTIC CONCRETE SURFACE. IT SHALL BE RE-APPLIED AFTER EACH              COMPLETION OF CONSTRUCTION.
                             OR FRESH WATER           FRESH WATER
                                                                                                        SUBSEQUENT WORKING OF THE SURFACE. THE PROPRIETARY ALIPHATIC ALCOHOL PRODUCT              7. AS THE FINAL DEPTH OF PILING ACROSS THE ENTIRE PROJECT MAY VARY
            PAD FOOTINGS
            I PILE UPS                                            IS            75                      MUST BE NOMINATED IN THE SUBMITTED TENDER, ALONG WITH AN INTENDED APPLICATION                DEPENDING ON GROUND CONDITIONS, THE CONTRACTOR SHALL PRICE THE
                                                                                                        DESCRIPTION. BOTH OF WHICH ARE REQUIRED TO BE APPROVED BY THE ENGINEER.                      WORKS BASED ON THE NOMINAL PILE DEPTHS SHOWN ON THE DRAWINGS,
            STRP FOOTINGS                                         so            65
                                                                                                        NOTE ALIPHATIC ALCOHOL IS NOT A CURING PROCEDURE. AND N NO WAY REPLACES CURING.              AND FINAL PAYMENT FOR THE CONSTRUCTED PILES WILL BE BASED ON
            COLUMNS OF                                                                                                                                                                               THE ACTUAL DEPTH OF PILES INSTALLED ON SITE, COSTED AT THE                                  0    19.1L10       FOR APPROVAL
                                        00                        SIT           75
            ALL TYPES                                                                                   6. CURING SHALL CONSIST OF THE FOLLOWING METHODS                                             APPROPRIATE AGREED RATE IN THE CONTRACT.                                                    (    17.10.10      FOR APPROVAL
             WALLS SLABS                                                                                •    CURING OF SLABS SHALL BE CURED BY EITHER WATER CURING BY CONTINUOUS SURFACE          8. THE PILING CONTRACTOR IS TO ASSESS THE LIKELIHOOD OF VIBRATION                              B    12.11.10      PRELIMINARY ISSUE TO CONSULTANTS
             I STAIRS
                                        40                        50            6S
                                                                                                             POMDING OR BY AN APPROVED SPRAYED OR ROLLER APPLIED CURING COMPOUND.                    DAMAGE, OR OTHER DEGRADATION OF ADJACENT STRUCTURES, SERVICES                               A    28.10.10      PRELIMINARY ISSUE TO ARCHITECT
            BEAMS                       40                        50            65                           WHERE CONTINUOUS WATER CURING IS ADOPTED, THE CONTINUOUS PERIOD SHALL LAST              ETC. DUE TO PILING OPERATIONS. ANY SUCH DAMAGE INCURRED IS TO                                    b          G=..y M^^



                                                                                                             FOR 14 DAYS. ONE METHOD O ACHIEVING WATER CURING IS TO POND THE SURFACE                 BE RECTIFIED AT THE PILING CONTRACTORS EXPENSE
11        CONSTRUCTION JOINTS WHERE NOT SHOWN SHALL BE LOCATED BY THE ENGINEER                               WITH 20MM1 WATER USING CLEAN SAND TO DAM THE SURFACE. THE WATER SHALL NOT            9. THE CONTRACTOR SHALL CONCRETE GROUT ALL GAPS IN CONTIGUOUS PILED WALLS.
12        THE FACE OF ALL CONCRETE AGAINST WHICH NEW CONCRETE IS TO BE POURED                                BE ALLOWED TO DRY OUT. WHERE A PROPRIETARY SPRAYED OR ROLLER APPLIED                 10. THE CONTRACTOR SHALL CO-ORDINATE WITH TOD CONSULTING. REGARDING TEMPORARY
          SHALL BE THOROUGHLY SCABBLED AND WASHED CLEAN
13        ALL CONCRETE SURFACES ARE TO BE CURED BY AN APPROVED METHOD FOR FOURTEEN
                                                                                                             CURING COMPOUND IS USED, THE PRODUCT SHALL BE NOMINATED AND REQUIRES
                                                                                                             APPROVAL BY THE ENGINEER. THE PRODUCT SHALL CONFORM TO REQUIREMENTS OF AS
                                                                                                                                                                                                      PROPPING, TIE BACKS AND PILING PROCEDURES, TO ENSURE PILES ARE NEVER OVERSTRESSED
                                                                                                                                                                                                      DURING CONSTRUCTION, AND OVERALL SAFETY IS MAINTAINED.                                     PROPOSED RESIDENCE
          1141 DAYS IMMEDIATELY CONCRETE IS HARD, AND PROTECTED BY PLASTIC SHEET
14        FORMWORK TO SUSPENDED SLABS TO REMAIN N POSITION FOR FOURTEEN (14)
                                                                                                             3700 -LIQUID MEMBRANE FOPIG CURING COMPOUNDS FOR CONRETE", AND MUST
                                                                                                             ACHIEVE EFFICIENCY RATING OF MINIMUM 90%, WHEN COMPARED TO CONTINUOUS WATER
                                                                                                                                                                                                  11. THE SET OUT OF CONTIGUOUS PILING MUST TAKE INTO ACCOUNT TYPICAL CONSTRUCTION
                                                                                                                                                                                                      TOLERANCES FOR LOCATION AND INCLINATION, TO MAINTAIN ADEQUATE CLEAR CAVITIES
                                                                                                                                                                                                                                                                                                 LOT 1
          DAYS AFTER POURING. PROP TO 28 DAYS
IS        FOR SLABS ON GROUND. ALL TOPSOIL AND UPPER STRATA CONTAINING ORGANIC
                                                                                                        •
                                                                                                             CURING.
                                                                                                             CURING OF FORMED WALLS MAY BE CURED BY EITHER LEAVING THE SHUTTERED
                                                                                                                                                                                                      BEHIND DRY WALLS.
                                                                                                                                                                                                                                                                                                 71 SEAVIEW TERRACE
          MATTER IS TO BE REMOVED AND REPLACED BY AN APPROVED CONSOLIDATED
           FILLING MATERIAL COMPACTED TO 95% MMDD IN ACCORDANCE WITH AS E 21
                                                                                                             FORMWORK IN PLACE FOR A PERIOD OF 14 DAYS OR BY AN APPROVED SPRAYED OR
                                                                                                             ROLLER APPLIED CURING COMPOUND, APPLIED IMMEDIATELY AFTER THE SHUTTERS ARE           SCREW PILING                                                                                   SUNSHINE BEACH
16        BAR SCHEDULE -
              N - HOT ROLLED HIGH YIELD BARS TO AS 1302
                                                                                                             REMOVED. WHERE A PROPRIETARY CURING COMPOUND IS USED, THE PRODUCT SHALL
                                                                                                             BE NOMINATED AND REQUIRES APROVAL BY THE ENGINEER. THE PRODUCT SHALL
                                                                                                                                                                                                  I. SCREW PILES SHALL BE GALVANISED STEEL (HS FILLED WITH 2SMPA CONCRETE GROUT.                 for A. SLINGER
              S - HOT ROLLED DEFORMED BARS TO AS 1302                                                                                                                                             PANT TOP 2.011 WITH 2 COATS HIGH BUD MARNE EPOXY . NTERGARD 278.
             RF - HARD DRAWN WIRE FABRIC TO AS 1302                                                          CONFORM TO REQUIREMENTS OF AS 3799 "L10UD MEMBRANE FORMING CURING
                                                                                                             COMPOUNDS FOR CONCRETE", AND MUST ACHIEVE EFFICIENCY RATING O MNMUM 90%,             2. SCREW PILES ARE TO BE DESIGNED AND INSTALLED BY THE CONTRACTOR USING THE PARAMETERS
              R - HOT ROLLED PLAIN BARS TO AS 1302
                                                                                                             WHEN COMPARED TO CONTINUOUS WATER CURING.                                            OUTLINED IN THE GEOTECHNCAL REPORT, AND ANY OTHER ADDITIONAL SOIL TESTING REQUIRED BY
17        SPRAY CLEAN ALL REINVT. FORMED SURFACES, AND CONCRETE FACES.                                  9. A COMPLETE DOCUMENTATION OF THE INTENDED CURING METHOD IS REQUIRED TO BE               SCREW PILE INSTALLER.
          CAST-IN BOLTS & FITTINGS ETC JUST PRIOR TO PLACEMENT OF FRESH CONCRETE TO
                                                                                                        SUBMITTED BY THE CONTRACTOR, AND FORMS PART OF THE REQUIRED TENDER SUBMITTAL
          REMOVE ALL TRACES OF DIRT, SAND, DUST AND DEPOSITED SALTS
                                                                                                        DOCUMENTS. THE COMPACTION METHOD NEEDS TO BE APPROVED BY THE ENGINEERS BEFORE
                                                                                                                                                                                                  3. SCREW PILES MUST FOUND AT A DEPTH SUITABLE FOR SUPPORTING THE REQUIRED SPECIFIED SAFE
                                                                                                                                                                                                  WORKING LOAD AS PER CONTRACTOR'S DESIGN. FOUNDING DEPTH MUST ALSO BE AT LEAST SM BELOW
                                                                                                                                                                                                                                                                                                 MCU WORKS
          AIR BLAST EXESS WATER OFF FORMS CONCRETING MUST NOT BE CARRIED OUT DURING                     THE TENDER IS DEEMED TO BE A CONFORMING BID ON THIS CONTRACT. PARTICULAR EMPHASIS
          STRONG WINOS, TO AVOID CONTAMINATION OF CONCRETE
          AND REINFORCING WITH WINO-DRIVEN SALT
                                                                                                        WILL BE PLACED ON INSPECTIONS AND OTHER SITE CONTROL METHODS OF ENSURING THE
                                                                                                                                                                                                  THE 27' PROJECTED LIE FROM BASE OF SLOPE, AND AT LEAST 7.OM BELOW ORIGINAL GROUND LEVEL.
                                                                                                                                                                                                  4. THE CONTRACTOR SHALL PROVIDE CERTIFICATION BY AN RPEQ THAT ALL SCREW PILES HAVE BEEN
                                                                                                                                                                                                                                                                                                 GENERAL NOTES
                                                                                                        DOCUMENTED (OPA(TION METHODS ARE CARRIED OUT SUCCESSFULLY.
                                                                                                                                                                                                  DESIGNED AND INSTALLED IN ACCORDANCE WITH IRS SPECFICATKN
11 CONTRACTOR IS TO CHECK HYDRAULIC & ELECTRICAL SERVICES DRAWNG FOR                                    11. IN ADDITION TO THE ABOVE REQUIREMENTS. ALL PRE-CAST CONCRETE SHALL Of
   LOCATION AND TYPE OF ALL CAST-IN ITEMS. N(LUORG ANY NECESSARY (OEgBTS AND                            FURTHER PROTECTED BY APPLICATION OF SKAGARO 700S & 6805 AS PER PRE-(AST                   S. THE CONTRACTOR IS ADVISED THAT THERE IS LIKELY TO BE LAYERS OF WEATHERED SANDSTONE
   PENETRATIONS FOR FUTURE SERVICES.                                                                    CONCRETE" NOTE 3, SHEET S2.                                                               ENCOUNTERED ON SITE, REQUIRING PRE-BORING PRIOR TO PILE INSTALLATION.
                                                                                                                                                                                                  A RATE FOR PRE-BORING SHALL BE PROVIDED.
19 )DINTS TO BE SEALED WITH AN APPPROVEO FLEXIBLE SKAFLEX-PRO POLYURETHANE
   COLOURED TO MATCH CONCRETE.                                                                                                                                                                    6. MINMRI DEPTHS OF PILING ARE INDICATED ON DRAWINGS. DEPTHS MAY NEED TO BE GREATER                architect
20 LAP MESH 400mm UNLESS NOTED OTHERWISE                                                                CONCRETE BLOCK MASONRY                                                                    TO ACHIEVE THE SPECFEO SAFE WORKING LOAD, AS PER PILE INSTALLER'S DESIGN.
   LAP BOTTOM BEAM REINFORCEMENT 600 AT PILES WHERE REQUIRED UJLO.                                      I   ALL CONCRETE BLOCK MASONRY WORK IS TO BE EXECUTED IN ACCORDANCE WITH
                                                                                                                                                                                                  7. AS THE FINAL DEPTH OF PILING ACROSS THE ENTIRE PROJECT WILL VARY                                gavin maddock
   LAP TOP BEAM REINFORCEMENT 600 AT MD-SPAN WHERE REQUIRED U3L0,                                           THE CURRENT EDITION OF - AS 3700 - SAA MASONRY STRUCTURES
                                                                                                                                                                                                     DEPENDING ON GROUND CONDITIONS. THE CONTRACTOR SHALL PRICE THE
                                                                                                                                         AS 4455 - CONCRETE BUILDING BLOCKS
                                                                                                                                                                                                     WORKS BASED ON THE NOMINAL PILE DEPTHS SHOWN ON THE DRAWINGS.
                                                                                                                                         AS 3600 - SAA CONCRETE STRUCTURES                           AND FINAL PAYMENT FOR THE CONSTRUCTED PILES WILL BE BASED ON
                                                                                                                                                                                                     THE ACTUAL DEPTH OF PILES INSTALLED ON SITE, COSTED AT THE
      PRECAST CONCRETE                                                                                  2   FOR CONCRETE FILLED CAVITIES. (LEAN OUT BLOCKS SHALL BE USED AT THE
                                                                                                                                                                                                     APPROPRIATE AGREED RATE IN THE CONTRACT.
                                                                                                            BASE OF THE WALL UNLESS SHOWN OTHERWISE )DINT MORTAR SHALL BE TRIED
     1.   ALL PRECAST CONCRETE TO BE F'L - 4OMPA, (S40) MINIMUM CONCRETE COVER SOmm                         FLUSH WITH THE INSIDE FACE OF THE CAVITY LOP OF FOOTING TO BE SCABBLED                8. THE PILING CONTRACTOR IS TO ASSESS THE LIKELIHOOD OF VIBRATION
                                                                                                            CAVITIES TO BE INSPECTED BY THE ENGINEER PRIOR TO POURING CONCRETE                       DAMAGE, OR OTHER DEGRADATION OF ADJACENT STRUCTURES, SERVICES
     2    TWO COPIES OF SHOP DETAIL DRAWINGS ARE TO BE SUBMITTED TO THE ENGINEER AND
                                                                                                        3   COVER TO REINFORCEMENT 12mm FROM INSIDE FACE OF BLOCK                                    ETC. DUE TO PILING OPERATIONS. ANY SUCH DAMAGE INCURRED IS TO
          ARCHITECT AND APPROVAL OF SAME OBTAINED PRIOR TO COMMENCING                                                                                                                                BE RECTIFIED AT THE PILING CONTRACTORS EXPENSE
                                                                                                        4   CONCRETE MIX USED 10 FILL CAVITY TO HAVE CHARACTERISTIC COMPRESSIVE

     3.
          FABRICATION
          ALL PRE-CAST BEAMS AID PRESTRESSED PRE-CAST PIES SHALL BE PANTED WITH A SYSTEM OF
                                                                                                            STRENGTH OF      4OMPa IP'd MAXIMUM SLOP 200mm. MAXIMUM AGGREGATE SIZE
                                                                                                            N Dmm IMAX 6 COURSE HEIGHT PLACED AT ONE TIEI
                                                                                                                                                                                                                                                                                                     TOOCONSULTING
          SKAWRO.1005 MBERAL SIISTRAIE IPREGRATDM FOLLOW BY SKAGARO-0005 KIS.T.: %1 MICRONS).
          OR SITAR APPROVED EQUIVALENT PROTECTIVE SYSTEM. ALL STBEILY N ACCORDANCE WITH Tic
                                                                                                        5   SLABS SUPPORTED ON UNRENFOR(ED LOAD BEARING BLOCKWORK SMALL BE
                                                                                                            SEPARATED FROM THE WALL BY TWO LAYERS OF PABCO ALSHELD TOR EOUVI
                                                                                                                                                                                                   ENGINEERING INSPECTION SCHEDULE                                                                               ENGINEERS
          MANUFACTURERS WRITTEN SPEUKATOIS. ALL PAINING SMALL BE (ADDED OUT PRIOR TO DELIVERY
                                                                                                            LAD ON A LEVEL 101 THICK MORTAR BED TOP COURSE OF BLOCKS TO BE
           AND ANY DAMAGE MAO GOOD ON SITE BEFORE INSTALLATION.                                                                                                                                    THE CONTRACTOR SHALL GIVE AT LEAST 48 HOURS NOTICE Of NECESSARY ENGINEERING SITE
                                                                                                             CONCRETE FILLED
     4.    TOP OF ALL EDGE BEAMS EBI-W TO BE PANTED WITH 3 (OATS O SKA GARD 7005, AID NO SKGARD 6005,   6   BLOCKWORK MUST NOT BE BUILT ON CONCRETE SLABS OR BEAMS UNTIL FORMWORK
                                                                                                                                                                                                   INSPECTIONS. WHICH ARE REQUIRED TO BE CARRIED OUT BY TOD CONSULTING ENGINEERS FOR THE                      STRUCTURAL CIVIL
                                                                                                            SUPPORTING SAME HAS BEEN REMOVED                                                       EVENTUAL CERTFKATION D THE AS-CONSTRUCTED WORKS.
                                                                                                        1   MORTAR TO BE MIXED IN THE PROPORTION D I               02S     3    CEMENT
                                                                                                                                                                                                   MINIMUM INSPECTION REQUIREMENTS ARE-
                                                                                                            HYDRATED LIME        SAND TOR EQUIVALENT CEMENT - SAND MORTAR WITH                                                                                                                            TOD CONSULTING PTY. LTD.
                                                                                                                                                                                                   1 ALL TEMPORARY WORKS INCLUDING ACCESS TRACKS, SCOUR PROTECTION, TEMPORARY STORM WATER                             ALL Due I UN
                                                                                                            PLASTICISER) AND MORTAR COMPRESSIVE STRENGTH AT 28 DAYS TO BE                 TNPG
                                                                                                            MINIMUM                                                                                  COLLECTION, SCAFFOLDING. EXCAVATION, SHORING. PROPPING. AND ALL RETAINING WALL STRUTTING.                                     E kd ^Sb

                                                                                                        1   CONCRETE BLOCKS TO HAVE A CHARACTERISTIC STRENGTH OF 12 MPG MRNIUM                                                                                                                                         .., .           SALT e:c.
                                                                                                                                                                                                   2 BASE OF ALL EXCAVATIONS.
                                                                                                            CONCRETE MASONRY TO BE CONSTRUCTED FROM 'H SERIES BLOCKS UNO
                                                                                                        9  PROVIDE CLEAN OUT BLOCKS TO BOTTOM CO RCE OF ALL CONCRETE FILLED MASONARY WALLS         3   ALL REINFORCING FOR BOTH IN-SITU AND PRECAST CONCRETE.
                                                                                                        R WHERE NO REINFORCING IS DESIGNATED IN DETAILS OR SECTIONS PROVIDE THE FOLLOWING          4 PILING INSTALLATION, AND PLOT HOLE DRILLING.
                                                                                                            190mm HOLLOW CONCRETE BLOCKS                                                           S ALL PRESTRESSING OPERATIONS AND GROUND ANCHOR INSTALLATION.
                                                                                                            ALL CORES CONCRETE FILLED - 4OMPG                 190mm WALL - 20.48 BLOCKS
                                                                                                            REINFORCEMENT I U.N.O. I ....................... N12 VERTICALS AT EACH SIDE O          6 CONCRETE PLACEMENT.
                                                                                                                                                                                                                                                                                                          B. GEORGE            K. CAPPER       O(T . '
                                                                                                                                                              OPENINGS, AT EACH END OF WALL        7   STRUCTURAL STEELWORK, ALUMIMUM STAIRS ETC - INCLUDING SHOP DRAWINGS APPROVAL.
                                                                                                                                                              AND AT 400 MAX, CRS. IN BETWEEN      8 TIE-DOWN, BRACING WALL CONSTRUCTION FOR TOILET BLOCKS.                                                H. GRAY         S. PRYSTLPA
                                                                                                                                                               - 600 LAPS
                                                                                                                                                              N12 AT 400 HORIZONTAL - 600 LAPS     9 STRUCTURAL FIXING OF WINDOW FRAMES AND DOOR FRAMES TO CONCRETE STRUCTURE.
                                                                                                                                                                                                                                                                                                           2 .l 9                                  Aw:
                                                                                                                                                              I INCLUDING ' L ' BARS AT CORNERS
                                                                                                                                                              UNLESS NOTED OTHERWISE I
                                                                                                                                                                                                                                                                                                       09578                     P2        A   B     ('0

Used in these records

About this file

File size
31.0 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

2008_0169 Response to information request - 71 Seaview Tce Sunshine Beach.pdf · 31.0 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.