Skip to the record
Search everything, all in one place.

Council archive · source document

2008/0169 Response to information request - 71 Seaview Tce Sunshine Beach · 132008.169

of 171

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (31.0 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

        EXISTING        WELDED TOP
        GROUND SLOPE      RILL
                                                                                                                                                                                                                                                         2000 MAX
                                                                                                                                                                                                                                                                                                        rv^w• h:nn-P.ry Yti n.wr wn



                                                                     ISO 1K. CONCRETE SLAB
                                     1120 EACH SIDE WELD TO          WITH SL 92 MESH
                                     EACH (HS PRE AND EXTEND         PLACED CENTRALLY        WELDED TOP
                                     1.0m INTO CONCRETE SLAB         ALL OVER ROCK BASE        RAIL
                                                                                                          N20 EACH SSE WELD TO
                                                                                                          EACH (KS PRE AND EXTEND
                                                                                                          1.0m INTO CONCRETE SLAB



                                                                                                                                                                                                                                                                        SEDIMENT CONTROL :
                                              MIN. 150 IK.
                                              CRUSHED ROCK                                                                                                                                                                                                              PROVIDE SEDIMENT CONTROL TO THE BOUNOARES
                                              OVER 2 LAYERS                                                                                                                                                                                                             BY WAY OF SEDIMENT FENCES.
                                              BDM GEOFABRC     BENCH FILL
                                                               INTO SLOPE                                                                                                                                             North                                             FENCES TO BE ERECTED BEFORE COMMENCEMENT
                                                                                                                                                                                                                                                                        OF EARTHWORKS, AND SHALL BE MAINTAINED UNTIL
                                                                   2 LAYERS A39                                                                                                                                                                                         GRASS COVER AND LANDSCAPING IS ESTABLISHED.
                                                                   BSIM GEOfABRK
                                                                                                                                                                                                                                                                        DURING WORKS, ALL CONSTRUCTION RUBBISH TO BE
                                                                                                                                                                                                                                                                        CONTAINED WITHIN AN APPROVED BIN.



                                                                                                                                                                                                                                               SEDIMENT CONTROL FENCE
                                                                                                                                                                                          Noosa National Park

                                                                                                                                                                                                 147
         TEMPORARY SAND ANCHORS
         OR SCREW PILES, AS
                                               TYPE SECTION THROUGH                                                                                                        2                   NPW889
         P, DUPED FOR RETAINING
         HEOGHI OVER 2.5m                 TEMPORARY VEHICLE TURN-AROUND

                                                                                                                                                                                                                                                                                      0    19.11.10    FOR APPROVAL
                                                                                                                                                                                                                                                                                      C    12.11.10    FOR APPROVAL
                                                                                                                                                                                                                                                                                      B    12.11.10    PRELIMINARY ISSUE TO CONSULTANTS
                                                                                                                                                                                                                                                                                      A    21.10.10    PRELIMINARY ISSUE TO ARCHITECT
                                                                                                                                                                                                                                                                                                      »w a.> e




                                                                                                                                                                             USE TEMPORARY STEEL PCE AND ACCESS PLATFORM
                                                                                                                                                                  AA ' FOR SCREW PIE INSIALLAT             ALTERNATIVELY USE
                                                                                                                                                                             MOBILE MINI-BE$TONITE CON(RfltPILE RIG.
                                                                                                                                                                                                                                                                                       PROPOSED RESIDENCE
                                                                                                                                                                             (APPROX. 2.014 A 1.211 1
                                                                                                                                                                                                                                                                                       LOT 1
                                                                                                                                                                                                                                                                                       71 SEAVIEW TERRACE
                                                                                                                                                                  k^_ R EO 4. I uuKwaY ^
                                                                                                                                                                   Ji,1..1            1_        LL
                                                                                                                                                                                                                                                                                       SUNSHINE BEACH
                                                                                                                                                                                                                                                                                       for A. SLINGER
                                                                                                                        STAGE 4
                                                                                                                        TEMPORARY ACCESS, PARKING,
                                                                                                                        STORAC AND TURN-AROUND
                                                                                                                        APRRO)^, 10 m2
                                                                                                                                                                                                                                                                                       MCU WORKS
                                                                                                                                                                                                                                                                                       SITE PLAN
STAGE 2 :
EXTENSION OF TEMPOR
                                                                                                                                                                                                                                                                                       ACCESS
PARKING, AND
APRRO
                                                                                                                                                                     CRANE FOR MATERIAL DELIVER -
                                                                                                                                                                     TO LOWER BEDROOM 5
                                                                                                                                                                                                                                                                                          architect
                                                                                                                                                                                      TEMPORART RAMP ST      A((j5S3B
                                                                                                                                       TEWORAR^
                                                                                                                                        GULLY PIT
                                                                                                                                                         AT L
                                                                                                                                                            4t                        TQILos PERMANENT, WWX%KAITON                                                                        gavin maddock
                                                                                                                                                              ^                                              3z
                                                                                                                                                      l/vl
                                                                                                                                      \                              III              ^                           ^       I




                                                                                                                                                                               SEDIMENT C**L
                                                                                                                                                                                 FENCE
                                                                                                                                                                                                     DISCHARtE TO A?PROVEO.
                                                                                                                                                                                                     STORMWAYLR Dljq; T                                                                   TODCONSULTING
                                                                                                                                                                                                                                                                                                      ENGINEERS

                                                                                                                                                                                                                                                                                                  STRUCTURAL CIVL


                                                                                                                                                                                                             99,53                                                                            TOO C0IN&LTN G PTY. LTD.
                                                                                                                                                                                                                                                                                                          ALL T UI III Im




                                                                                                                                                                                                       PARKING FOR 7 CARS DURING STAGE 1 OF
                                                                                                                                                                                                       TEMPORARY SITE ACCESS. REMAINING AREA
                                                                                                                                                                                                       IS ADEQUATE FOR TRUCK TURN-AROUND

                                                                                                                                                                                                                                                                                             B. GEORGE             K. CAPPER       OCT
                                                                                                                                    SITE PLAN - TEMPORARY ACCESS                                                                                                                              H. GRAY            S. PRYSTUPA       1     25.
                                                                                                                                               12.5          10     2.5    5    2.5       0
                                                                                                                                                              1      I           I        I                                                                                                   l :• 9                                   AHD

                                                                                                                                                                      SCALE 1 250 UNREDUCED AT A!                                                                                          09578                      P4       A   B     (     o

Used in these records

About this file

File size
31.0 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

2008_0169 Response to information request - 71 Seaview Tce Sunshine Beach.pdf · 31.0 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.