                                                                                                                                        North
                                                                                 bshovM

                                                                                   147




                                                                                                                                                                              0    19.11.10      FOR APPROVAL
                                                                                                                                                                              C    17.11.10      FOR APPROVAL
                                                                                                                                                                              B    12.11.10      PRELIMINARY ISSUE TO CONSULTANTS
                                                                                                                                                                              A    28.10.10      PRELIMINARY ISSUE TO ARCHITECT
                                                                                                                                                                                   Carr       Ora.ry Anare




                                                                                                                                                                              PROPOSED RESIDENCE
                                                                                                                                                                              LOT 1
                                                                                                                                                                              71 SEAVIEW TERRACE
                                                                                                                                                                              SUNSHINE BEACH
 SITE CONSTRUCTION PROCEDURES                                                                                                                                                 for A. SLINGER
1.     CAR PARKING, BULK MATERIAL STORAGE ON SITE N INITIAL SET UP
       PHASE. AS PER TEMPORARY ACCESS PLAN,
2.     COMPLETE EXISTING CONDITION I DILAPIDATION I SURVEYS ON ADJACENT

3.
       PROPERTIES
       ESTABLISH SURVEY POINTS ACROSS ENTIRE SITE TO MONITOR ANY
                                                                                                                                                                              MCU WORKS
4.
       SURFACE MOVEMENTS THROUGHOUT CONSTRUCTION PHASE
       ESTABLISH EXTENDED TEMPORARY CONCRETE PAVED VEHICLE TURN AROUND ON SITE
                                                                                                                                                                              LOCALITY PLAN
       USING TEMPORARY SCREW PILE AND SLEEPER WALLS ITIED-BACKI. SAND-FLLEO
       GEOFABRI(, OR GABION MATTRESSES AT SOUTH-WEST CORNER OF SITE
                                                                                                                                                                              DRAWING SCHEDULE
S.     DESIGN AND CONSTRUCT TEMPORARY ACCESS PLATFORMS FOR CFA PILING
       RIG AND PROCEED TO BUILD THE PERMANENT WORKS AS PER DIAGRAMMATIC                                                                          DRAWING SCHEDULE
       CONSTRUCTION STAGES 1-4. INSTALL EROSION CONTROL FENCES.
6.     PROTECT ALL VEGETATION AS PER ENVIRONMENTAL PLAN
                                                                                                                                                09578-P1   MCU WORKS
7.     ALL CONCENTRATED STORMWATER MUST BE DISPOSED OF VIA APPROVED
                                                                                                                                                           GENERAL NOTES          architect
       STORMWATER DISCHARGE SYSTEM AT ALL STAGES OF CONSTRUCTION
B.     ALL TEMPORARY ACCESS TRACKS MUST BE CONSTRUCTED ON ISO GRAVEL
       LAD OVER GEOFABRIC AND CONTOURED TO AVOID CONCENTRATIONS Of SURFACE                                                                      09578-P2   M(U WORKS              gavin maddock
       RNFF. MAXIMUM LNRETANED FLL DEPTH TO 1M.                                                                                                            GENERAL NOTES
9.      NOTE THAT THE SURFACE SANDS AT THE SOUTH - EASTERN AREA OF THE SITE
       ARE ABOVE THE SAFE NATURAL STABLE ANGLE OF THE SAND. AND                                                                                 09518-P3   MCU WORKS
       CONSEOLENTLY ANY WORK N THE AREA MUST BE CARREO OUT WITH EXTREME                                                                                    LOCALITY PLAN
       CAUTION. UNDER SIPERVISLN OF GEOTECHI(AL ENGINEER, WHILE REGULARLY                                                                                  DRAWING SCHEDULE
       MONITORING SURFACE MOVEMENTS
10.    SIZE, TYPE, DEPTH AND LENGTH O PLIES ARE BASED ON TYPICAL ASSUEO                                                                         09578-P4   M(U WORKS
       GROUD CONDITIONS AND. THE MORRION AND S(G GEOTE(MN(AL NVESTGATDNS                                                                                   SITE PLAN
       OF THE WOUND MATERIAL ON SITE. FINAL PILING DETALS. GROUT                                                                                           ACCESS                 TODCONSULTING
       NECTDN AND CONSTRUCTION PROCEDURE WLL BE COINED AFTER DETAILED
       ANALYSIS OF THE GEOTECIN(AL INVESTIGATION REPORT.                                                                                        09578-PS   MCU WORKS                           ENGINEERS
       PLNG DETAILS WILL ALSO BE CO-ORDNATED WITH ADVICE FROM                                                                                              SITE PLAN
       SPECIALIST PILING CONTRACTORS. TIE (FA CONTEUDUS GROUT REPLACEMENT                                                                                  BULK EARTHWORKS
       RETAINING WALLS. If-BACKS AND STRUTTING ARE TO BE DESIGNED AND RPEO                                                                                 AND PILING                       STRUCTURAL CIVIL
       CERTIFIED BY THE CONTRACTOR N ACCORDANCE WITH THE RELEVANT
       AUSTRALIAN CODES.                                                                                                                        09518-P6   MCU WORKS
It      DEPTH, SIZE. LAYOUT AND TYPE OF PILING IS SCHEMATIC ONLY AND                                                                                       SITE SECTIONS                  TOO CONWLTINO PTY. LTD.
                                                                                                                                                                                                    1lX T us 15I
       SHALL BE PRICED WITH APPROPRIATE RATES 10 ALLOW PRICED O
       VARIATIONS N AS-CONSTRLKTED PLNG WHICH MAY VARY DEPENDING ON                                                                             09578-P7   M(U WORKS
       EXACT CONDITIONS ENCOUNTERED ON SITE DURING CONSTRUCTION,                                                                                           CONSTRUCTION
 12.   THE CONTIGUOUS PLED WALLS SMALL BE GROUTED AND REPAIRED AS                                                                                          PROCEDURE
       REOLRED AT ANY AREAS WHERE CONTIGUOUS PLES HAVE NOT PROVIDED A
       TIGHT STRUCTURAL WALL
                                                                                                                                                09578-PO   MCU WORKS
 13.   A DRAPED AND VENTILATED INTERNAL CAVITY WALL SHALL BE PROVIDED AT                                                                                   CONSTRUCTION
       ALL AREAS WHERE BULDNG WALLS ARE RETAINING SON..                                                                                                                                                                  rv.r
                                                                                                                                                           DETAILS                    B. GEORGE              K. CAPPER          OCT 2010

                                                                                                    LOCALITY PLAN                               09578-P9   MCU WORKS                      H. GRAY         S. PRYSTLPA      I       SN
                                                                                          2S   20    15      ID   S    0                                   SITE PLAN                                     < K          m.,,
                                                                                                                                                                                          3 .9                                    AHD
                                                                                                             r                                             EXCAVATION
                                                                                                          SCALE I SOD UNREOU(ED AT AT                                                09578                      P3        A p' (           e

Used in these records

About this file

File size
31.0 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

2008_0169 Response to information request - 71 Seaview Tce Sunshine Beach.pdf · 31.0 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.