21598 - Glenridge Drive - STAGE 1 -Response to info request
Attached to the e-mail Response to information request - OPW22/0163 - Email 2 of 2 - Glenridge Drive -.
3. Issue The proposed table drain works along the frontage of 60 Glenridge Drive drains towards the north-west. Council are concerned that the overland flow within the table drain will pool on the south-eastern side of the existing driveway crossover due to the lack of drainage under the crossover. Council recognise that as part of the Higher Order Approval, the developer and landowner came to an agreement that the existing driveway crossover (and internal driveway) would be reconstructed to accommodate for the proposed works. Information Required Provide an additional driveway design plan. The driveway design plan must be prepared by a suitably qualified person (RPEQ – Registered Professional Engineer of Queensland) and include, but not be limited to: a. a design generally in accordance with Noosa Council’s standard drawing RS-056 and any associated addendum; b. demonstrate that the overland flow within the proposed free draining table drain will not pool along the southern frontage of 60 Glenridge Drive. Response There is no table drain on the south eastern side of the existing driveway crossover. The road is constructed on an embankment in this location and run off generally sheet flows from the road reserve into lot 8 and ultimately to the gully to the south. There is a minor depression (150mm deep) adjacent to the existing driveway crossover which we have shown as being filled to eliminate the potential of any water ponding in this area. Note that there is insufficient depth to install a pipe under the existing crossover. I can confirm that there is no agreement between the developer and landowner to reconstruct the existing driveway crossover and internal driveway. Notwithstanding we agree that the crossover needs to be upgraded in order to comply with condition 51 of the higher order approval. As such these works have been added to our drawing C003. We trust the above is satisfactory. Should you have any queries regarding this matter please contact the undersigned. Yours faithfully Doug Reynolds Principal Civil Engineer 07 5449 9600 | [email protected] TOD Consulting Engineers Page 2 of 2 Tod Job Number: 21598
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.