4. ASSESSMENT MANAGER CONDITIONS
BUILDING
1 The plans submitted for a Development Permit for building works are to comply with the
approved plans.
2 An identification survey of the subject site is to be carried out by a Licensed Surveyor and
is to be submitted to Council at the time of foundation inspection or immediately thereafter.
Such survey shall set out the boundaries of the site and the position of the buildings on the
site.
3 A verification survey is to be undertaken on the building by a Licensed Surveyor and a
certificate lodged with Council at completion of the work confirming compliance with the
minimum required floor level, or the maximum building height above natural surface,
required by the provisions of the Town Planning Scheme.
HEALTH
4 All liquid waste produced by commercial section of the development is “Trade Waste” and
is to be treated as required under the Noosa Trade Waste Policy prior to release to sewer.
5 A trade waste permit is required to discharge each type of trade waste. The hydraulic
drawings are to show all the trade waste requirements in accordance with Noosa Trade
Waste Policy
6 Approval of the Trade Waste requirements are to be obtained as part of the building approval
process.
7 Waste requirements are required to be in place, inspected and approved prior to the
commencement to trading or operation. The appropriate Trade Waste Permits will be issued
following the necessary approvals.
8 Refuse containers must be provided in accordance with requirements of the Environmental
Protection (Interim Waste) Regulations 1996 for the storage and collection of refuse to the
satisfaction of Council’s Manager of Environmental Health.
9 All refrigeration plant, including motors, shall be situated within the building or suitably
provided with noise reduction and shall be located as to prevent disturbance beyond the
subject land in accordance with the Environmental Protection (Noise) Policy.
10 Air-conditioning units shall be located in a manner, which prevents noise disturbance beyond
the subject land in accordance with the Environmental Protection (Noise) Policy.
11 The developer must provide separate toilet facilities for patrons, in addition to staff toilet
facilities in accordance with the Building Code of Australia.
12 In accordance with the Environmental Protection (Water) Policy 1997, all sand, silt, mud,
paint, cement, concrete, builders waste or rubbish shall not be permitted to enter or be placed
where it could reasonably be expected to move into a roadside gutter, stormwater drain or
a water course. On the spot fines apply for such offences.
13 The developer must upgrade the existing refuse bin storage area in order to ensure it is
sufficient in size to accommodate all refuse and recycling containers to the reasonable
satisfaction of Council’s Environmental Health Officer. This area is to be aesthetically screed
from any road frontage or adjoining property boundaries. A suitable hosecock, hoses and
approved roof drainage outlet to Councils sewer, are to be located in the vicinity of the refuse
container area for washing containers.
LAND DEVELOPMENT
14. At least 277 off-street car parking spaces (including 31 spaces on the adjoining hotel site -
Lot 2 on RP842280 and 5 Direct to Boot car parking spaces for the supermarket use) shall
be provided with at least 6 of the spaces suitable for use by persons with disabilities within
Page 2 of 11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachement D - Minor Change Approval.pdfRelated documentApplication case desk ↗
About this file
- File size
- 539 KB (small file)
- File type
No other editions are linked here.