Attachement D - Minor Change Approval · 131999.982622.8
close proximity to the main access to the retail areas and signed appropriately. Some of
these spaces must be converted to provide for 8 motorcycle/scooter spaces. Access
thereto shall be via a bitumen sealed or concrete pavement.
The car parking spaces and associated manoeuvring areas shall be in accordance with
Australian Standard AS2890.1-1993 with respect to dimension and gradient for User Class
3 and User Class 4 for the disabled spaces.
15. The proposed carpark layout shall generally be in accordance with the approved plans.
16. All carparking shall be kept maintained and line-marked in a condition fit for use to the
reasonable satisfaction of the Manager - Land Development. All markings and signs required
to delineate the direction of travel shall be included on the plans for operational works.
17. A contribution of $11,400 toward roadworks external to the site shall be paid prior to the issue
of a Development Permit for Building Works relating to this permit. The amount of the
contribution shall be adjusted in accordance with changes to the Consumer Price Index,
All Groups Brisbane from March 2000 up to the date of payment.Roof and surface water is
to be collected on site and is to be discharged in accordance with Council’s Engineering
Design Standards. A Development Permit for Building Works shall not be granted until a
Development Permit for Operational Works has been issued in regard to the drainage
scheme.
18. The existing concrete footpath along Gibson Road adjacent to the new retail extensions shall
be extended along the frontage of the site to the proposed pedestrian crossing within the
car parking area. A Development Permit for Operational Works shall be obtained prior to
the commencement of any works. Footpath and property alignment levels may be obtained
from the Works Inspector-Development upon request.
19. The concrete footpath is to be designed and constructed to ensure pedestrian safety using
non-slip materials and to produce an evenly graded surface finish.
20. Contributions shall be paid to Council in accordance with Planning Scheme Policies PSP
28 and PSP 30 on Water Supply Headworks Contributions and Sewerage Headworks
Contributions respectively and at the rates applicable at the time of payment. An estimate
only of the contribution rates as at December 1999, under the current policies is as follows:-
Water Supply
$2,168
Sewerage $2,913
TOTAL: $5,081
All headworks contributions must be paid prior to the issue of a Development Permit for
Operational Works.
Alternatively, a trading bank guarantee shall be submitted to Council plus 20%. Should the
headworks contributions not be paid at the due time, Council shall call upon the trading bank
guarantee in full.
In the event that the Development Permit for Material Change of Use of Premises lapses
or is cancelled, the contribution or trading bank guarantee will be returned.
21. Alteration of any public utility or other facilities necessitated by the development of the land
or associated construction works external to the site shall be at no cost to Council.
22. Minimum Floor Heights for the development shall be in accordance with the Planning
Scheme at the time of issue of the Building Permit.
23. Fill levels in accordance with Council’s Noosaville Master Drainage Plan will be provided
on application to Council's Works Department. If any filling works are required on the site,
Page 3 of 11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachement D - Minor Change Approval.pdfRelated documentApplication case desk ↗
About this file
- File size
- 539 KB (small file)
- File type
No other editions are linked here.