RFI - Engineering - Stormwater
On-site Underground Detention Storage Orifice Plate Sizing
for Deemed-to-comply Detention
October 2020
This fact sheet describes the steps that
should be taken to size an orifice plate for
on-site underground detention when
using deemed to comply detention
storage. The standardised orifice plate
design will help to ensure post-
development flows match pre-
development conditions for a range of The outlet pipe to which the orifice plate is
storm events. installed should be sized to convey the 10%
AEP (at 2100) peak flows. This is to allow for
An orifice plate is required to ensure that potential future upgrade of the receiving
peak flows being discharged from an drainage network. Allowance for blockage of
underground storage tank can be attenuated the underground stormwater network and
for a range of storm events. Without an surcharge of the underground storage
orifice plate, outflows would be controlled by should be considered in the siting and
the capacity of the outlet pipe. As the outlet design of the underground detention storage.
pipe will typically be sized to convey the 10% The overland flow path is required to have
Annual Exceedance Probability (AEP) event sufficient capacity so that surrounding floor
(at 2100) peak flows, the post-development levels will not be inundated if there is
discharges will likely exceed pre- complete blockage of the underground
development peak flows for smaller AEPs if stormwater drainage network during the 1 in
an orifice plate or another form of staged 100 AEP (at 2100) event.
discharge control is not installed.
The stormwater drainage upstream of the
Existing drainage networks, particularly in detention storage should be designed so that
older established urban areas, were the 1 in 100 AEP peak flow can be conveyed
generally sized to convey the 39% AEP peak to the underground detention storage.
flows. Therefore discharging at higher than
pre-development rates during smaller storm To the maximum degree practical, the entire
events could cause local flooding issues for site should be drained to the detention
surrounding areas. Control of peak flows storage. Where this is not possible, the
during smaller events is also necessary in equivalent storage for the entire site should
order to reduce the risk of increased scour be provided and the outlet should be
and erosion in receiving waterways. reduced in size to achieve the same overall
site discharge. A maximum of 20% of the
Having an outlet pipe sized to convey the developed portion of the site is allowed to
smaller 39% AEP peak flow, without an bypass the detention storage.
orifice plate, so that outflows would be
restricted for all storm events, would require The depth of the required underground
more detention storage volume than detention storage is flexible in order to allow
proposed by Table 2 of the Flooding and for a range of proprietary detention storage
Stormwater Management Guidelines (SCC, products to be utilised. Pre-treatment of
2018). flows entering the tank should be provided
by a Gross Pollutant Trap (GPT) or gully pit
baskets.
Fact Sheet On-Site Detention Orifice Plate Sizing