RFI - Engineering - Stormwater
A removable debris screen, in accordance The orifice plate holes should be
with the Section BN5.5.2(p) of QUDM (2017) spaced so that the:
should be provided upstream of the orifice i. bottom third of the plate can
plate. A sump pit, which houses the outlet convey 5/12 of Q0 when H is
orifice, will also be necessary. The access 2/3 of the tank depth
chamber to the underground storage should
be adequately sized to enable the debris ii. middle third of the plate can
screen to be removed from the tank. convey 1/2 of Q0 when H is
2/3 of the tank depth
The orifice plate should be made from a
corrosion resistant 5mm thick stainless steel. iii. the top third of the plate can
The orifice plate will have numerous holes at convey 1/12 of Q0 when H is
specified levels and diameters cut out of it. 2/3 of the tank depth
The minimum acceptable orifice plate hole Step 4. Multiple holes will be required in
diameter is 25mm. each section of the orifice plate. The
minimum acceptable orifice plate
Orifice Plate Sizing Process hole diameter is 25mm. Check that
The orifice plate should be designed using the proposed number of holes can
the following steps: fit within the available orifice plate
area over the outlet pipe. In order to
Step 1. Size the outlet pipe to which the accommodate the required number
orifice plate will attach so that it has of holes, multiple outlet pipes or a
a diameter half the depth of the box culvert may be required. The
underground tank. Multiple pipes procedure to size the orifice plate
can be used to achieve the required holes will not be modified, the holes
total depth, in order to allow smaller will just be spread over a greater
outlet pipes to be used. area.
Step 2. Determine the current climate pre- Step 5. Check that the outlet pipe/s has
development 10% AEP peak flow sufficient capacity (based on
based on A Review of Simple Peak Colebrook-White equation) to
Flow Estimation Methods for use on convey the 10% AEP (at 2100)
the Sunshine Coast following the peak pre-development flows.
release of ARR 2016 (SCC, 2017).
This will be the target Qo. Step 6. Size the removable debris screen
so that the area (including blocked
Step 3. Size the required orifice plate holes area) is at least 20 times the total
based on the following equation: orifice area. A grid mesh should be
Qo = C A (2gH)1/2 used (e.g. Weldlok A40/203 or
Where: similar).
C = 0.6 (unless otherwise justified) An example of the orifice plate is attached.
A = total orifice area (m2) The proposed outlet design should help to
ensure that post-development peak flows
g = acceleration due to gravity from the site are attenuated to pre-
(m2/s) development levels for all storm events, up
H = depth of water above the to and including the 1 in 100 AEP (at 2100).
centroid of orifice plate hole (m) The depth of water (H) used to size the
orifice plate is limited to two thirds of the
depth of the tank. During major storms,
2 of 3 Fact Sheet On-Site Detention Orifice Plate Sizing