RFI - Engineering - Stormwater
additional storage above this level will be 0.075 m3/s. 7/85mm orifice
therefore be available. plate holes (or equivalent) are
In some instances, multiple small outlets therefore required in the
may be able to be used instead of an orifice middle third of the orifice
plate. The capacity of the outlet pipes (which plate.
is dependent on factors such as grade and iii. In the top third of the plate,
materials) should be verified to ensure that the average depth of water
they do not become the hydraulic control. above the centroid is 0.3m,
The multiple pipes should drain to a single and it will be required to
pit before connecting to Council’s convey 1/12 of 0.15m3/s, i.e.
underground drainage network. 0.0125 m3/s. 1/105mm orifice
plate hole (or equivalent) is
Orifice Plate Sizing Example therefore required in the top
An example of the orifice plate sizing is third of the orifice plate.
provided below for an example of a 0.5ha Step 4. The orifice plate holes are able to
rural-residential block being developed into a physically fit onto the 600mm
medium density development. The volume of diameter orifice plate, as shown in
storage required is 210m3. The pre- Figure 1, and so multiple outlet
development 10% AEP peak flow is pipes will not be required.
0.15m3/s (current day) and 0.18m3/s (at
2100). The depth of the proposed tank is
1.2m.
Step 1. The outlet pipe will be required to
have a diameter of half of 1.2m, i.e.
600mm.
Step 2. The target Qo is 0.15m3/s.
Step 3. The following orifice plate holes will
be required:
i. The centroid of the bottom
third is at 0.1m. The average Figure 1 Orifice Plate
depth of water above the Set Out Example
centre of the holes at 2/3 of Step 5. The 600mm RCP outlet at a
the tank depth is therefore minimum grade of 0.2% will have a
0.7m. The orifice plate holes capacity of 0.27m3/s, and so will
are required to convey 5/12 of have sufficient capacity to convey
0.15m3/s, i.e. 0.0625 m3/s. the future climate 10% AEP peak
4/95mm holes (or equivalent) flow of 0.18m3/s.
are therefore required in the
Step 6. The minimum debris screen area is
bottom third of the orifice
20 times the total orifice plate hole
plate.
area, i.e 1.53m2.
ii. In the middle third of the
plate, the average depth of
water above the centroid is
0.5m, and it will be required to
convey 1/2 of 0.15m3/s, i.e.
3 of 3 Fact Sheet On-Site Detention Orifice Plate Sizing