Skip to the record
Every meeting, every word.

Council archive · source document

SOLPSM01_2JR02826-SOL_PRN_KINGS_GoLine_0463_001 · OPW20/0236

of 12

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Department of Infrastructure, Local Government and Plann

 

Section 2 — Further development details
7) Does the proposed development application involve any of the following?

 

 

 

 

 

Material change of use CO Yes — complete division 1 if assessable against a local planning instrument
Reconfiguring a lot OO Yes — complete division 2

Operational work I Yes — complete division 3

Building work LC Yes — complete DA Form 2 — Building work details

 

Division 1 — Material change of use
Note: This division is only required to be completed if any part of the development application involves a material change of use assessable against a local

planning instrument.
8.1) Describe the proposed material change of use

 

Provide a general description of the Provide the planning scheme definition Number of dwelling Gross floor
proposed use (include each definition in a new row) units (if applicable) area (m?)
(if applicable)

 

 

 

 

 

 

  

8.2) Does the proposed use involve the use of existing buildings on the premises?
O Yes
C1 No

 

 

 

 

 

 

 

Division 2 — Reconfiguring a lot
Note: This division is only required to be completed if an,

9.1) What is the total number of existing lots making up the premises?
9.2) What is the nature of the lot reconfiguration? (tick all applicable boxes)
0 Subdivision (complete 10)) Ld Dividing land into parts by agreement (compete 11)

DD Boundary realignment (complete 12)) 0 Creating or changing an easement giving access to a lot from
a construction road (complete 13))

part of the development application involves reconfiguring a fot.

     
 

    
     

 

 

     
 

10) Subdivision
10.1) For this development, how many lots are being created and what is the intended use of those lots:

Intended use of lots created Residential Commercial Industrial Other, please specify:

  
   
 

      

 

 

 

 

Number of lots created

10.2) Will the subdivision be staged?

OO Yes — provide additional details below
1 No

How many stages will the works include?

What stage(s) will this development application
apply to?

 

 

 

 

  

11) Dividing land into parts by agreement — how many parts are being created and what is the intended use of the
parts?

Intended use of parts created

  
    

   

          

    
 
 

Residential Commercial Industrial Other, please specify:

 

 

 

 

 

 

Number of parts created

 

Page 4
DA Form 1 — Development Application details
Version 1.0—3 July 2017

Used in these records

About this file

File size
1.0 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

SOLPSM01_2JR02826-SOL_PRN_KINGS_GoLine_0463_001.pdf · 1.0 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.