Council archive · source document
SOLPSM01_2JR02826-SOL_PRN_KINGS_GoLine_0463_001 · OPW20/0236
Department of Infrastructure, Local Government and Plann
Section 2 — Further development details
7) Does the proposed development application involve any of the following?
Material change of use CO Yes — complete division 1 if assessable against a local planning instrument
Reconfiguring a lot OO Yes — complete division 2
Operational work I Yes — complete division 3
Building work LC Yes — complete DA Form 2 — Building work details
Division 1 — Material change of use
Note: This division is only required to be completed if any part of the development application involves a material change of use assessable against a local
planning instrument.
8.1) Describe the proposed material change of use
Provide a general description of the Provide the planning scheme definition Number of dwelling Gross floor
proposed use (include each definition in a new row) units (if applicable) area (m?)
(if applicable)
8.2) Does the proposed use involve the use of existing buildings on the premises?
O Yes
C1 No
Division 2 — Reconfiguring a lot
Note: This division is only required to be completed if an,
9.1) What is the total number of existing lots making up the premises?
9.2) What is the nature of the lot reconfiguration? (tick all applicable boxes)
0 Subdivision (complete 10)) Ld Dividing land into parts by agreement (compete 11)
DD Boundary realignment (complete 12)) 0 Creating or changing an easement giving access to a lot from
a construction road (complete 13))
part of the development application involves reconfiguring a fot.
10) Subdivision
10.1) For this development, how many lots are being created and what is the intended use of those lots:
Intended use of lots created Residential Commercial Industrial Other, please specify:
Number of lots created
10.2) Will the subdivision be staged?
OO Yes — provide additional details below
1 No
How many stages will the works include?
What stage(s) will this development application
apply to?
11) Dividing land into parts by agreement — how many parts are being created and what is the intended use of the
parts?
Intended use of parts created
Residential Commercial Industrial Other, please specify:
Number of parts created
Page 4
DA Form 1 — Development Application details
Version 1.0—3 July 2017
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SOLPSM01_2JR02826-SOL_PRN_KINGS_GoLine_0463_001.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.0 MB (small file)
- File type
No other editions are linked here.