Council archive · source document
SOLPSM01_2JR02826-SOL_PRN_KINGS_GoLine_0463_001 · OPW20/0236
Department of Infrastructure, Local Government and Plann
bO i] g is}
a = st Opo — or €a 0 O = e
Current lot Proposed lot
Lot on plan description Area (m?) Lot on plan description Area (m?)
12.2) What is the reason for the boundary realignment?
13) What are the dimensions and nature of any existing easements being changed and/or any proposed easement?
{attach schedule if there are more than two easements)
Existing or Width (m) | Length (m) | Purpose of the easement? (e.g. Identify the land/lot(s)
proposed? pedestrian access) benefitted by the easement
Division 3 — Operational work
Note: This division is only required to be completed if any part of the development application involves operational work.
14.1) What is the nature of the operational work?
LO Road work O Stormwater OO Water infrastructure
OO Drainage work (J Earthworks UO Sewage infrastructure
C0 Landscaping D Signage LC Clearing vegetation
CJ Other — please specify: |
14,2) Is the operational work necessary to facilitate the creation of new lots? (e.g. subdivision)
LO Yes — specify number of new lots:
{] No
14.3) What is the monetary value of the proposed operational work? (include GST. materials and labour)
$ 8,606.00
PART 4 — ASSESSMENT MANAGER DETAILS
15) Identify the assessment manager(s) who will be assessing this development application
16) Has the local government agreed to apply a superseded planning scheme for this development application?
C1 Yes - a copy of the decision notice is attached to this development application
CJ Local government is taken to have agreed to the superseded planning scheme request — relevant documents
attached
Ei] No
PART 5 — REFERRAL DETAILS
17) Do any aspects of the proposed development require referral for any referral requirements?
Note: A development application will require referral if prescribed by the Planning Regulation 2017
No, there are no referral requirements relevant to any development aspects identified in this development
application — proceed to Part 6
Matters requiring referral to the chief executive of the Planning Regulation 2017:
LC Clearing native vegetation
O01 Contaminated land (unexploded ordnance)
UO Environmentally relevant activities (ERA) (only if the ERA have not been devolved to a local government)
O Fisheries — aquaculture
Page 5
DA Form 1 — Development Application details
Version 1.0—3 July 2017
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SOLPSM01_2JR02826-SOL_PRN_KINGS_GoLine_0463_001.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.0 MB (small file)
- File type
No other editions are linked here.