ANNUAL PERFORMANCE REPORT INCLUDING Q4 OPERATIONAL PLAN 2023-24 PROGRESS REPORT · Attachment 1 - Annual Progress Report to 30 June 2024, incorporating the Q4 progress Report (1 April to 30 June 2024)

of 27

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
                                                                                            ATTACHMENT 1




Noosa Council
2023 - 24 Operational Plan
Annual Progress Report to 30 June 2024, incorporating the Q4 progress Report (1 April to 30 June 2024)
Log in to download the original file

Attachment 1 - Annual Progress Report to 30 June 2024, incorporating the Q4 progress Report (1 April to 30 June 2024).pdf · 473 KB (small file)

Full text of the other 26 pages

Page 2

How are we tracking?
The Operational Plan contains 149 initiatives/projects aligned to the Themes of the Noosa Council Corporate Plan 2023-28. An initiative may relate to broader and long-term
efforts aimed at achieving a specific goal or vision (in this case the initiative may be staged greater than a year) or a specific project with defined objectives and deliverables.

The majority of initiatives are either ‘complete’ at 43% or ‘on track’ at 26% with 17.5% experiencing a ‘minor disruption’ and 13.5% a ‘major disruption’.



                       Status of Initiatives by Theme

                       Status                                               Environment      Liveability    Prosperity     Future     Excellence      Total

                       Complete -                                                 20              18            10            6            10           64
                       (All agreed delivery milestones achieved
                       complete)
                       On Track                                                    7               9             8           11            4            39
                       (Cost, scope, and timeframes are on target)
                       Minor Disruption                                            3               7             2            6            8            26
                       (Minor changes to scope of project, cost overrun
                       of less than 10%, minor delays of less than 30
                       days)
                       Major Disruption                                            2               7             1            5            5            20
                       (Delays greater than 30 days, significant change
                       in scope, cost overrun of more than 10%)
                       Total
                                                                                  32              41            21           28            27          149

Page 3

                                                                                             Q4 Status of All Initiatives
                                        160
                                                                                                                                                                                        149
                                        140

                                        120
                   No. of Initiatives
                                        100

                                        80
                                                                                                                                                                              64
                                        60
                                                                                                                                                                                   39
                                        40                                     41
                                                       32                                                                                                                               26
                                              20                  18                                                                       28                        27                      20
                                        20                               9                          10         21                     11                  10
                                                   7                          7      7                     8                      6        6    5                    8 5
                                                       3    2                                                  2 1                                               4
                                         0
                                               Environment             Liveability                       Prosperity                   Future                   Excellence          Total
                                                                                                                      Themes

                                                                Complete                 On Track              Minor Disruption            Major Disruption           Total




Status Summary
  •   64 Initiatives Completed (43%)

  •   39 Initiatives On Track (26 %)

      Of the 39 initiatives on track 33 were not completed, continue to progress, and were relisted in the new 24/25 Operational Plan while 6 were absorbed into ongoing
      service delivery past 30/6/24.

      Reasons include - the scope of the initiative with delivery staged across more than one year, not planned to commence until later in the year or the timeline for the
      initiative was rescheduled/extended.

  •   26 Initiatives Minor Disruption (17.5%)
      Of the 26 initiatives commenced 24 experienced a ‘minor disruption’ and were not completed as planned, 22 were relisted in the new 24/25 Operational Plan, 2 were
      absorbed into ongoing service delivery past 30/6/24, and 2 (i.e. 5.2.5 and 5.7.2) are to be added to the 24/25 Operational Plan for future reporting.

Page 4

    Reasons include - the initiative was impacted by an unplanned event which affected the timeline, was staged across more than one year, had dependencies that
    impacted progress, resourcing constraints including vacancies in key positions, the need for higher levels of community consultation than was planned for (e.g. the
    Noosa River Management Plan, Noosa Plan amendments), competing priorities and changes in council’s direction.
    The majority are within the Livability, Future and Excellence Themes, examples include transport (e.g. Cycling and Walking Implementation Plan, parking
    management and traffic management technology trial), asset management (Strategic Asset Management Plan), strategy and policy development (e.g. Community
    Plan, Destination Management Plan, Community Grants Policy, Cemetries Plan).

•   20 Initiatives Major Disruption (13.5%)
    Of the 20 initiatives experiencing a ‘major disruption’ 11 have commenced and were completed as planned, 9 were not commenced, 19 were relisted in the new 24/25
    Operational Plan, and 1 (I.e. 5.7.1) is to be newly added to the 24/25 Operational Plan for future reporting.

    Reasons include - the initiative was impacted by the scope of the initiative with delivery staged beyond one year, an unforeseen matter which seriously impacted the
    timeline, insufficient resources were available to progress the initiative as planned, environmental factors, technical difficulties, dependencies that impacted progress,
    competing priorities and changes in council’s direction.
    Like those initiatives which experienced a minor disruption, the majority are within the Livability, Future and Excellence Themes and relate to more complex issues
    particularly in the development of new council strategies or policies examples include transport, parking management, accessible facilities, strategy development (e.g.
    Emissions Offset Strategy, Community Strategy/Plan), community satisfaction (e.g. community satisfaction survey), development of major plans (e.g. Boreen Point
    Campground, Capability Plan, Workforce Plan, Advocacy Plan) and asset management (e.g. Implementation of the Asset Management Framework).

Page 5

Environment Theme – Q4 Initiatives Progress


Highlights
1. Development Assessment- Over the past 12 months more than 650 lodged applications have been assessed and 599 decided applications align with the strategic intent of
the Noosa Plan.

2. Over 4,000 new images and documents have been added to the Heritage Noosa portal.

3. Wrap up of the Yurol Ringtail Forests Conservation Project with the presentation of a report to the June council meeting.

4. Expansion of the Community Bushland Care Program.




                                                                          Q4 Status of Initiatives

                                         Total                                                                                 32

                              Major Disruption       2
                                                                                                                                         Complete
                     Status




                              Minor Disruption           3                                                                               On Track
                                                                                                                                         Minor Disruption
                                     On Track                    7
                                                                                                                                         Major Disruption

                                    Complete                                                        20                                   Total


                                                 0           5       10        15             20         25            30           35
                                                                               No. of Initiatives

Page 6

Complete Initiatives
OP                                                                   Service/Mgr      Date
Ref    Initiative                                                    Responsible      Delivered    Comments
1.1.1  Deliver a Modern Water Quality Monitoring Program for the     Environmental    30/06/2024   Water monitoring for Noosa River completed. Collaborative trial in place Q3-Q4
       Noosa and Mary River Sub-catchments including prepare         Services                      FY25 with SCC for Mary River sub-catchment reporting.
       the Mary River sub-catchment report card, complete annual
       reporting to identify sub catchment water quality grades,
       support and monitor outcomes of the Keep it in Kin Kin
       project in conjunction with Noosa & District Landcare.
1.1.3   Enhanced management of bio basins in formal asset            Asset Manager    30/06/2024   Maintenance undertaken on prioritised bio-basins.
        management systems incl. asset management and                &
        renewal.                                                     Environmental
                                                                     Services
1.2.1   Continue to deliver the Noosa Bushland Reserve Strategic     Environmental    30/06/2024   Program successfully delivered.
        Fire Management Plan 2021 and deliver planned burns and      Services
        mechanical fuel reduction where conditions allow.

1.2.2   Continue to deliver a Community Bushcare Program for the     Environmental    30/06/2024   Program successfully delivered and expanded with an additional two groups joining
        active volunteers across the bushland care groups and        Services                      the program. Current program has 21 groups with over 250 active volunteers that
        improve reporting and monitoring of bushland care                                          contributed over $200K in-kind labour hours. Professional support from Council is
        activities including review of the Community Bushland Care                                 currently 2.0FTE with additional contractor support to ensure all groups have
        Guideline.                                                                                 engagement from Council on all projects. Council support includes co-development
                                                                                                   of annual work plans.


1.2.3   Continuation and expansion of the Private Conservation       Environmental    30/06/2024   Program successfully delivered
        Partnerships Program which supports private landholders      Services                      Expansion of the program included 23 new Land for Wildlife properties and 1 new
        to achieve improved conservation including updating all                                    Voluntary Conservation Agreement. Council is also in the process of formalising 1
        agreements to align with the newly endorsed Private                                        new Nature Refuge.
        Land Conservation Partnerships Guideline.
1.2.4   Continue to deliver the Environmental Grants Program to      Environmental    30/06/2024   Grants program successfully delivered with 2 environmental grants totalling
        support community projects and programs.                     Services                      $113,292.50 and 4 Climate Change and Resilience Grants totalling $50,000. Prior to
                                                                                                   the application window, Council conducted a community grants information session
                                                                                                   that included information on both streams of environmental grants.

1.2.5   Provide ongoing support to the Noosa Biosphere Reserve       Environmental    30/06/2024   Support for NBRF continues from Council with expanded networking and
        Foundation and help advance collaborative opportunities      Services                      collaboration with Council projects. Strategic Plan for NBRF successfully
        with Council and the wider community.                                                      undertaken.




1.3.3   Implement the Noosa Heads Main Beach Shoreline               Infrastructure   30/06/2024   Dredging and renourishment works for the SEMP project were completed June
        Erosion Management Plan (SEMP).                              Planning                      2024. Some additional channel formation is also completed, and an asset renewal
                                                                     Design &                      program will be required to maintain the shoreline following works completion.
                                                                     Delivery

Page 7

1.3.4   Finalise the Eastern Beaches Foreshore Management            Environmental   30/6/24      Plan complete and endorsed by Council.
        Plan.                                                        Services

1.4.1   Complete Stage 4 of Local Heritage Register Review           Heritage        30/06/2024   Findings and research from project completed and consolidated in preparation for
        including preparing for recommended planning scheme          Coordinator                  final stage of project to provide recommendations to Strategic Planning team to
        amendments.                                                                               progress as planning scheme amendments.

1.4.2   Prepare Conservation Management Plans for at least two       Heritage        30/06/2024   Conservation Management Plans for three sites (Cooroy Cemetery, Tewantin
        Council-controlled, heritage properties.                     Coordinator                  Cemetery and Pomona Cemetery).



1.4.3   Document the iconic story of surfing in Noosa to capture     Heritage        30/06/2024   Images and oral histories gathered through the project added to Heritage Noosa.
        this unique aspect of Noosa’s heritage and lifestyle.        Coordinator                  Continuing to document this story and make available via Heritage Noosa will be
                                                                                                  ongoing as part of heritage activities.

1.4.4   Complete Stage 4 of Heritage Noosa with a focus on           Heritage        30/06/2024   Approximately 4,000 additional images, oral histories, and documents added to the
        making donated materials publicly accessible                 Coordinator                  site.

1.5.1   Support the transition arrangements for the Yurol Ringtail   Environmental   30/06/2024   Final report submitted. Awaiting gazettal.
        State Forest land for conservation to expand the area        Services
        protected for conservation in Noosa Shire.
1.5.3   Continue the management, maintenance and monitoring of       Environmental   30/06/2024   Successfully delivered for FY24 and ongoing for FY25.
        bushland reserve areas.                                      Services                     Included operational management of the highest priority Bushland Reserves to
                                                                                                  improve ecosystem function. All vehicle and access trails remained open for
                                                                                                  community use.

1.7.2   Manage flying fox impacts on the community in accordance     Environmental   30/06/2024   Program successfully delivered through regular scheduled monitoring of permanent
        with the Noosa Council Statement of Management Intent        Services                     roosts. Increases in population at Waratah Reserve and Wallace Park were
        (SoMI) and through community education.                                                   managed in accordance with the SoMI through community engagement, increased
                                                                                                  monitoring and impact assessments for adjacent properties.


1.7.3   Continue providing records of flora and fauna records to     Environmental   30/06/2024   Continued as part of standard functions.
        WildNet and updating internal mapping/databases to           Services
        include current data.
1.7.4   Complete Fine Scale Regional Ecosystem Mapping               Environmental   30/06/2024   RE Information has been submitted to Herbarium, but due to resourcing the
        across the Noosa Shire in collaboration with the             Services                     Herbarium will not be in a position to assess the data for 6-12months. The Noosa
        Queensland Herbarium to improve the accuracy of local                                     Council aspect of this project is now complete.
        and state vegetation mapping datasets.

1.8.3   Continue to implement best practice Development              Development     30/06/2024   Continue to utilise relevant experts where required - ensuring cost effective supply
        Assessment services that deliver the strategic outcomes of   Assessment                   of these services. Continuing to review the processes undertaken within the
        the Noosa Plan 2020.                                                                      Development Assessment team, making changes where required.


1.8.5   Develop employee competencies through targeted training      Civil           30/06/2024   The environmental operational works matrix has been updated and is being
        to increase environmental awareness in operational works     Operations &                 incorporated into the Maintenance Plan.
        in roads and vegetation management.                          Assets

Page 8

On Track Initiatives
OP     Initiative                                                    Service/Mgr      Status   Reason for Status
Ref                                                                  Responsible
1.1.2  Monitor, investigate and make progress towards                Environmental             Education material complete for seagrass project. Prioritisation tool for riparian projects
       ongoing restoration efforts of aquatic habitats such as       Services                  identified. Continued support to NICA for ongoing monitoring of the Oyster Reef project
       wetlands, seagrass and oyster reefs, and improve riparian                               - next status report due EOFY. This program will effectively become the implementation of the
       vegetation and foreshore management.                                                    Noosa River Catchment Management Plan. We were anticipating that it would move through
                                                                                               the July Council meeting as planned. However, as there is a potential delay it has been
                                                                                               difficult to plan for. There is a budget item for NRCMP projects that will include the above
                                                                                               initiatives.
                                                                                               Note-Ongoing and part of BAU
1.2.7   Continue the delivery of the Shire wide biosecurity          Environmental             Note-previously experienced a minor disruption, now on track for delivery in FY25
        program for pest animal and plant species including          Services                  Note-the review of the Biosecurity Plan is relisted in the new 24/25 Operational Plan
        review and update of the Biosecurity Plan as required.

1.3.1   Identify high-risk erosion prone areas of the CHAP and       Infrastructure            Works progressing with investigations into the Eastern Beaches coastal creeks budgeted
        scope a forward works plan.                                  Planning                  within 2023/24 and continuing into 2024/2024, informing future works requirements.
                                                                     Design &                  Note-relisted in the new 24/25 Operational Plan
                                                                     Delivery

1.3.2   Develop the Noosaville Infrastructure Foreshore              Infrastructure            The community has been engaged on the 80% masterplan document during Q4 of
        Management Plan.                                             Planning                  2023/24, and Council are working through a variety of feedback with the expectation of an
                                                                     Design &                  additional community engagement round being required before progressing to 100%.
                                                                     Delivery                  Note-relisted in the new 24/25 Operational Plan

1.7.1   Initiate implementation of the Noosa Threatened Fauna        Environmental             Commenced Sea Turtle Conservation Plan and Koala Conservation Plan for delivery Q2
        Roadmap including develop 2 action plans per year for        Services                  FY25. Completed baseline abundance and distribution for the Great Glider, Mary River
        priority threatened species identified in the Noosa                                    Cod and Mary River Turtle (upcoming Conservation Plans for FY25).
        Threatened Fauna Roadmap.                                                              Note-relisted in the new 24/25 Operational Plan

1.8.2   Complete the review of the Noosa Design Principles and       Strategy &                Graphics being prepared to support final draft document for publishing.
        promote and increase awareness with key stakeholders.        Sustainability            Note-relisted in the new 24/25 Operational Plan


1.8.4   Ensure all Council capital, civil and maintenance works      Infra Serv/               Maintenance conducted as per Civil Operational Maintenance Plan. Design works are
        are planned, delivered, and maintained in accordance         Env Serv/                 assessed against Noosa Design Principles and certified to comply with technical
        with the Noosa Design Principles, legislative requirements   Procurement/              standards. Construction works are implemented to meet design intent and in terms of
        and best environmental practice including minimise           Strategy/                 approved quality and environmental standards. Monitoring for compliance are undertaken
        impacts on environmental values and incorporate              Regulatory                internally and externally by experienced officers and professionals. This scope continues
        fauna/flora sensitive designs into project planning and                                as part of business-as-usual operations for the Infrastructure Department.
        delivery where practical.                                                              Note-relisted in the new 24/25 Operational Plan

Page 9

Disrupted Initiatives
OP      Initiative                                                  Service/Mgr      Status   Reason for Status
Ref                                                                 Responsible
1.2.6   Continue to convene Environment and Sustainability          Environmental             Awaiting the confirmation of a new council to endorse the framework for the project.
        Roundtables to provide a mechanism for local community      Services                  Note-as previously reported.
        groups, government stakeholders and experts to have input                             Note-ongoing and part of BAU as part of our ongoing stakeholder relationship
        into the development of council projects, program and                                 management
        policy.
1.3.5   Implement the Encroachments Policy and Operational          Environmental             Program mostly set up with minor delay due to staff turnover.
        Procedure including the development of a community          Services                  Note-relisted in the new 24/25 Operational Plan
        awareness and education plan.
1.5.2   Review and update the Conservation Land Plan.               Environmental             Work commenced - to be delivered Q3 FY25.
                                                                    Services                  Note-relisted in the new 24/25 Operational Plan

1.6     Finalise and initiate implementation of the Noosa River     Environmental             Project deferred pending council decision.
        Catchment Management Plan.                                  Services                  Note-as previously reported
                                                                                              Note-relisted in the new 24/25 Operational Plan
1.8.1   Continue to update and maintain the Noosa Plan 2020         Strategy &                Public consultation undertaken for Noosa Plan 2020 Amendment 2. Next step is to
        through various amendments to incorporate and respond to    Sustainability            respond to submissions and report back to council for endorsement prior to submission
        new, revised, or updated Council strategies, policies and                             for State Government Ministerial sign off.
        requirements.                                                                         Note-relisted in the new 24/25 Operational Plan

Page 10

Liveability Theme – Q4 Initiatives Progress


Highlights
1. Property- Review of Tenure underway proposed completion 2024-25 Review of the public swimming pool program underway to be taken and presented to ET for
endorsement 17/07/2024

2. Completed Round 21 of Community Grants program which awarded $131,932.18 in grant funds to community organisations for projects, equipment, infrastructure and
events.

3. The new Tea Tree room at Noosa Seniors has been completed which has extended programming options for clients and provided a space for hire.

4. The long-awaited amenities upgrade at Noosaville Library has been completed providing modern, inclusive facilities.




                                                             Q4 Status of Initiatives - Liveability Theme

                                         Total                                                                                41


                              Major Disruption           7
                                                                                                                                        Complete
                     Status




                              Minor Disruption           7                                                                              On Track
                                                                                                                                        Minor Disruption
                                     On Track                 9
                                                                                                                                        Major Disruption
                                                                                                                                        Total
                                    Complete                                 18

                                                 0   5        10      15      20          25      30        35           40        45
                                                                             No. of Initiatives

Page 11

Complete Initiatives
OP     Initiative                                                    Service/Mgr      Date         Comments
Ref                                                                  Responsible      Delivered
2.1.2  Continue to implement the Short Stay Letting Local Law to     Development      30/06/2024   On-going implementation of the short stay local law, the team resources are now at
       manage the impacts of short-term letting including            Assessment                    capacity with the appointment of a coordinator and additional assessment and
       increased resources towards compliance.                                                     compliance officer. Initial stages of operational review is also underway.


2.1.3   Support local not-for-profit organisations to undertake      Community        30/06/2024
        projects targeted at improving access to accommodation,      Connection
        shelter and housing options for vulnerable people.
2.3.1   Deliver range of arts and cultural programs which meet the   Arts & Culture   30/06/2024   Arts and Cultural projects have been presented throughout the year through Noosa
        aims and objectives of the Cultural Plan.                                                  Regional Gallery, Library Services, The J and Cultural Development services. The
                                                                                                   Cultural Plan 2019-2023 has been completed with over 92% of actions complete or
                                                                                                   underway. A report has been prepared for Council.

2.3.2   Commence review of Council’s approach to arts and            Arts & Culture   30/06/2024   The Draft Public Art Policy has been completed and internal feedback completed. The
        culture in open public spaces.                                                             Policy is currently being refined for presentation and adoption.

2.3.3   Deliver Floating Land 23.                                    Arts & Culture   30/07/2023   37 days (24 June to 30 July), 33 artists, 21 projects (12 site-responsive artworks + 5
                                                                                                   community projects + 4 exhibitions), 15 workshops and public programs, 161,189
                                                                                                   public encounters with artworks, 92-page Biennale Catalogue.


2.3.4   Promote the outcomes of the RADF funded projects.            Arts & Culture   30/06/2024   The RADF Program has been successfully administered throughout the year with a
                                                                                                   diverse range of arts and cultural projects funded. Ongoing funding for 2024-2026 has
                                                                                                   been confirmed by Arts Queensland. A review of the funding round scheduling and
                                                                                                   format has been completed with changes implemented in the 2024/25 year.

2.4.4   Scope upgrade of Noosa Heads Bus interchange as an           Transport and    30/06/2024   The options analysis phase has been completed and closed out with consultant and
        iconic arrival point to Noosa Heads.                         Traffic                       TMR representatives (funding body). Development of the Movement and Open Space
                                                                     Planning -                    Master Plan for Noosa Heads will be subject to budget inclusion in future years, post
                                                                     Infrastructure                the Northern Sunshine Coast Public Transport Strategy.
                                                                     Planning
2.4.6   Continue to support the planning and delivery of the         Env Services     30/06/2024   Maintenance program successfully completed. Planning support delivered for
        maintenance programs for the Noosa Trails network (also      Env                           significant trail 5 upgrade and ongoing planning for trail extension to Boreen Point.
        relates to 2.2.2)                                            Operations
                                                                     Team/
                                                                     Env Planning
                                                                     (Land)
2.5.1   Deliver services and activities across Council facilities    Arts & Culture   30/06/2024   The J, Noosa Regional Gallery and branch libraries have maintained or increased
        which meet the contemporary interests and needs of           /Community                    their visitation throughout the reporting period.
        residents including increasing use by existing non or low-   Connection
        user groups                                                  /Sports &
                                                                     Active
                                                                     Lifestyles

Page 12

2.5.3   Complete the feasibility study of the potential Re Gen         Sports &         30/06/2024   Feasibility report has been completed, but further progression on next steps of this
        Physical and Wellbeing Hub.                                    Active                        proposed project is on hold whilst priority NLC Needs Assessment project is
                                                                       Lifestyles                    undertaken, as it will inform any future decisions on this project.

2.5.5   Complete the non-powered water sports feasibility project.     Sports &         1/09/2023    Creation of high-level concept plan for NPWS precinct completed that will contribute
                                                                       Active                        to the future foreshore infrastructure Master Plan, along with the formation of a
                                                                       Lifestyles                    precinct network group.1/09/2023

2.5.6   Complete construction and commence operation of                Sports &         1/09/2023    Completed 1/9/23 with the opening and activation of the hiring of the Olive Donaldson
        McKinnon Drive facility.                                       Active                        Pavilion to house a multitude of sports activities at the site, with general community
                                                                       Lifestyles                    hire also available.

2.6.2   Implement a 12-month program of volunteer workshops to         Community        30/06/2024   A wide variety of free and low-cost workshops offered to our community from mental
        increase capacity and sustainability of community              Connection                    health first aid courses through to strategic planning workshops
        organisations and activities.
2.6.4   Support community led programs, events and activities          Arts & Culture   30/06/2024   Cultural Development Services and Communications Connections, through the RADF
        through advice, funding and partnering.                        /Community                    Program and Community Grants Program, have supported numerous initiatives and
                                                                       Connection                    projects throughout the year. Cultural and Community Development Officers have
                                                                       /Sports &                     provided support to the community, arts and cultural sector through the Grow Your
                                                                       Active                        Arts initiative and a 12-month calendar of volunteer initiatives.
                                                                       Lifestyles

2.8.1   Deliver range of programs and activities which enhance         Arts & Culture   30/06/2024   Through Cultural Development and gallery programs, Council has presented and
        health, wellbeing and safety of the Noosa community.           Comm                          supported a range of programs for the arts and cultural sector. During the year library
                                                                       Connect                       services and facilities have provided access and education to our community from
                                                                       /Sports &                     pre-primary to seniors. Community Connections have also successfully delivered the
                                                                       Active                        Living Well program along with a number of age care workshops at Noosa Seniors.
                                                                       Lifestyles
                                                                       /Local Laws &
                                                                       Env Health

2.8.2   Deliver the Living Well Noosa program.                         Community        30/06/2024   Successfully delivered the Living Well program across a broad range of
                                                                       Connection                    demographics.
                                                                       Manager

2.8.4   Prepare Noosa Community Support for transition to new          Community        30/06/2024   Noosa Seniors is constantly looking at ways to be viable in the future. The Tea Tree
        funding model and quality standards to ensure ongoing          Connection                    room upgrade has been a success with a number of workshops hosted bringing in
        viability.                                                     Manager                       more seniors to the centre.

2.8.5   Review the public swimming pools monitoring program            Local Laws &     30/06/2024   A review of the program has been undertaken together with the legislative instruments
        which includes privately owned, publicly accessible pools in   Environmental                 which support it. Since amendments were made to the Local Law to enable the
        resorts etc.                                                   Health                        program, several statewide developments in the management of recreational water
                                                                       Manager                       have occurred and the program has not been progressed into an operational program.
                                                                                                     Recommendations to be tabled at the ET meeting on 24 July.

Page 13

On Track Initiatives
OP     Initiative                                                    Service/Mgr        Status   Reason for Status
Ref                                                                  Responsible
2.1.1  Continue to implement key actions of the Noosa                Strategy and                Housing Stakeholder meeting to inform on proposed planning scheme amendment
       Housing Strategy including: Continue to work with the         Sustainability              related to affordable housing outcomes undertaken; Housing ID engaged for monitoring;
       Housing Stakeholder Reference Group on implementation                                     continued engagement with state on development of sites in Tewantin and across
       and community education; Develop a Housing Monitoring                                     Noosa; Council endorsement of 62 Lake Macdonald Drive to progress the remediation
       program; Implement a Community Education program;                                         and subdivision of the site and sale of lot 1 to a community housing provider; proposed
       Partner with State Housing Department to advance the                                      planning scheme amendments on housing affordability outcomes publicly notified for 6
       planning and development of affordable housing in                                         weeks.
       conjunction with social housing in central Tewantin;                                      Note-relisted in the new 24/25 Operational Plan
       Continue site investigation at Lake Macdonald Drive
       Cooroy for housing outcomes; and Continue to advocate
       for a Legislative pathway for social and affordable housing
       through planning instruments (inclusionary zoning).
2.2.1   Develop a Noosa Botanic Gardens Master Plan.                 Civil Operations            Work on the Noosa Botanic Gardens Master Plan has progressed and will be finalised
                                                                     & Asset                     in the 2024/25 financial year.
                                                                     Management                  Note-relisted in the new 24/25 Operational Plan
2.2.2   Complete the Noosa Biosphere Trails Implementation Plan      Infrastructure              The Implementation Plan is complete. The operational plan is on hold until all grant
        and Operational Maintenance Plan.                            Planning Design             funded works are completed as priority.
                                                                     and Delivery                Note-relisted in the new 24/25 Operational Plan

2.2.3   Deliver the pathway renewal program across Council.          Infrastructure              Minor delays have resulted in not all pathways identified for renewal being completed in
                                                                     Planning Design             23/24. Limited availability of competent contractors have resulted in lesser experienced
                                                                     and Delivery                contractors requiring substantial guidance, supervision and additional time to complete
                                                                                                 works. Remaining pathways will be completed in 24/25.
                                                                                                 Note-relisted in the new 24/25 Operational Plan

2.4.7   Continuation of the Go Noosa program including free          Project Manager             The Go Noosa program (including free weekend bus program) is ongoing.
        weekend bus program.                                         Transport                   Note-relisted in the new 24/25 Operational Plan

2.5.2   Continue implementation of Master Plans for Cooroy and       Sports & Active             Implementation across both sites is ongoing with projects listed in 10 year CW pipeline.
        Noosa District Sports Complexes.                             Lifestyles                  Cooroy Gymnastics clubhouse expansion is in funding stages, as is field lighting in
                                                                                                 24/25 CWP.
                                                                                                 Note-relisted in the new 24/25 Operational Plan
2.5.7   Scope Community Halls DDA compliance and asset               Buildings and               DDA access and amenities assessment has been completed on the following locations.
        management condition assessments to ensure quality,          Facilities                  Pomona Community House, Pomona Memorial School of Arts, Kin Kin Memorial School
        accessible and fit for purpose community facilities.         Coordinator and             of Arts and Cooran Memorial School of Arts. Three halls remain to be completed and
                                                                     Property                    will be scheduled in 24/25.
                                                                                                 Note-relisted in the new 24/25 Operational Plan

2.7.2   Complete needs assessment and forward plans for Noosa        Sports & Active             NLC Needs assessment project is nearing completion, and NAC Needs Assessment
        Leisure Centre and Noosa Aquatic Centre.                     Lifestyles                  and Master Plan process is well underway with consultant.
                                                                                                 Note-relisted in the new 24/25 Operational Plan

Page 14

2.8.3   Facilitate improved access to mental health services for   Community                   Advocacy, partnerships and funding opportunities being applied for. Living Well is now
        young people.                                              Connection                  catering for our youth. Successful delivery of our first ever youth festival in Pomona.
                                                                                               Note-incorporated in Living Well Noosa program which is relisted in the 24/25
                                                                                               Operational Plan



Disrupted Initiatives
OP      Initiative                                                 Service/Mgr        Status   Reason for Status
Ref                                                                Responsible
2.4.1   Scope the review of the Noosa Transport Strategy           Transport &                 A review of the existing Transport Strategy is underway in the form of a Transport
        including higher emphasis on movement and connectivity.    Traffic                     Delivery Plan and a Sustainable Transport Coordinator has been appointed for
                                                                   Coordinator                 commencement in the new financial year.
                                                                                               Note-relisted in the new 24/25 Operational Plan

2.4.2   Scope the Noosa Parking Management Plan.                   Transport &                 An ITQ has been to market for the preparation of a Parking Management Plan which
                                                                   Traffic                     will be assessed in the new financial year and a Sustainable Transport Coordinator has
                                                                   Coordinator                 been appointed for commencement in the new financial year.
                                                                                               Note-relisted in the new 24/25 Operational Plan

2.4.3   Commence a Northern Sunshine Coast Public Transport        Transport and               TMR have awarded a consultancy contract to undertake the development of the
        Strategy including investigations of Cooroy and Noosa      Traffic Planning            Northern Sunshine Coast Public Transport Strategy and appointed the Project Steering
        Shire Business Centres Transits Hubs.                      -Infrastructure             Committee. The finalisation of the terms of reference is ongoing.
                                                                   Planning                    Note-relisted in the new 24/25 Operational Plan

2.4.5   Accelerate delivery of the Cycling and Walking             Transport and               A detailed application to the SEQ Liveability Fund as been submitted for the Peregian
        Implementation Plan.                                       Traffic Planning            Beach Coastal Cycle Street & Pathway Stage 1 and Wayfinding Signage and Minor
                                                                   -Infrastructure             Pathways with announcement of outcomes expected in the new financial year. Delivery
                                                                   Planning                    of pathways within the C&W Program continue to be scheduled in the 10-year capital
                                                                                               works program according to priority and available funding.
                                                                                               Note-relisted in the new 24/25 Operational Plan

2.4.8   Undertake Noosa Woods Jetty investigations.                Infrastructure              This project is on hold until a project manager can be assigned and commencement of
                                                                   Planning Design             the sustainable Transport and Traffic Coordinator.
                                                                   and Delivery                Note-relisted in the new 24/25 Operational Plan

2.5.4   Complete new Noosa Libraries Business Plan.                Libraries                   The new Noosa Library Business Plan is currently under development. Minor
                                                                   Coordinator                 disruptions due to other pressing priorities.
                                                                                               Note-relisted in the new 24/25 Operational Plan

2.5.8   Deliver an Accessible Adult Change Facility under the      Infrastructure              A new initiative to fund the planning and design of an accessible adult changing facility
        Changing Place program on the Noosaville Foreshore.        Planning Design             is scheduled for commencement in the 24/25 financial year, with delivery over the two
                                                                   and Delivery                following years.
                                                                                               Note-relisted in the new 24/25 Operational Plan

2.5.9   Commence a review of community purpose land and the        Property                     30/6/2024 - Workshop scheduled with Councillors 8/7/24. Policy expected to be
        Infrastructure Tenure Policy.                                                          finalised in last quarter of 2024.
                                                                                               Note-relisted in the new 24/25 Operational Plan

Page 15

2.6.1   Review the Community Grants program and policy.            Community    Grants review will align with the Community Purpose Land and Infrastructure Tenure
                                                                   Connection   Policy. Community Tenure Policy expected to be workshopped with councillors in May.
                                                                                The outcome of the Community Grants Program and Policy could vary depending on
                                                                                the feedback received during the review of the Tenure Policy.
                                                                                Note-relisted in the new 24/25 Operational Plan


2.6.3   Undertake the preparatory phase for proposed new           Community    Resourcing was not available to undertake this work. Proposal made to the 24/25
        Community Strategy.                                        Connection   Budget.
                                                                                Note-undertaking the preparatory phase for a proposed new community strategy is
                                                                                relisted in the new 24/25 Operational Plan

2.7.1   Progress Asset Management Planning for Council’s           Community    Audit of existing community services asset management components complete.
        community services buildings and community                 Services     Identified need for better quality, relevant condition assessments which can reliably
        infrastructure.                                            Director     inform asset management for individual facilities. The condition assessments are
                                                                                underway.
                                                                                Note-relisted in the new 24/25 Operational Plan
2.7.3   Complete the Noosa Cemeteries Plan.                        Transport    Data has been finalised and will be presented to Council in the August 24 round of
                                                                   Project      meetings.
                                                                                Note-considered to be part of the initiative to develop the Noosa Parking Management
                                                                                Plan which is an initiative in the new 24/25 Operational Plan.

2.7.4   Undertake the Noosa Heads precinct traffic management      Transport    Data has been finalised and will be presented to Council in the August 24 round of
        technology trial.                                          Project      meetings.
                                                                                Note-considered to be part of the initiative to develop the Noosa Parking Management
                                                                                Plan which is an initiative in the new 24/25 Operational Plan.

2.7.5   Investigate a new revenue system which ensures visitors    Transport    An ITQ has been to the market for the preparation of a Parking Management Plan
        contribute to the provision and maintenance of transport   Project      which will be assessed in the new financial year and will include investigation into a new
        facilities and services they utilise.                                   revenue system.
                                                                                Note-relisted in the new 24/25 Operational Plan

Page 16

Prosperity Theme – Q4 Initiatives Progress


Highlights
1. Small Business Friendly Program Charter aimed at enhancing the operating environment for small businesses endorsed by Council, the Qld. Small Business Commissioner
and the Minister for Employment and Small Business.

2. Partnered with Sunshine Coast Council to support the FWD Climate Tech Forum at the J.

3. Finalised the Employment Land Review.

4. Stage 2 of the Peregian Digital Hub has been completed and is now fully operational.




                                                                     Q4 Status of initiatives - Prosperity Theme

                                             Total                                                                    21


                                  Major Disruption       1
                                                                                                                                       Complete
                         Status




                                  Minor Disruption           2                                                                         On Track
                                                                                                                                       Minor Disruption
                                         On Track                             8
                                                                                                                                       Major Disruption
                                                                                                                                       Total
                                        Complete                                       10

                                                     0           5                10                        15   20             25
                                                                                       No. of Initiatives

Page 17

Complete Initiatives
OP     Initiative                                                      Service/Mgr      Date         Comments
Ref                                                                    Responsible      Delivered
3.1.3  Implement Priority economic development and business            Economic         30/06/2024   8 x ECDEV Grants supported during FY an increase of 62% on previous year.
       support initiatives including Economic Development Grants       Development
       program; Business support programs incl. Boost; Business
       Support Panel; and Continue to collaborate with the
       Business Round Table.

3.1.4   Complete Shire wide Employment Land Review.                    Strategy &        30/6/24     Final report received 10/01/2024. Structure planning being undertaken on Urban
                                                                       Sustainability                Footprint extension at Cooroy for employment lands.
3.2.1   Scope a Noosa Future Skills Plan to identify current and       Economic          30/6/24     Scope finalised, due to internal team restructure, project was later in commencement
        future skill needs for priority Noosa businesses.              Development                   but on track for final delivery in FY 24/25.


3.3     Scope the preparation of a Food and Agribusiness Industry      Economic          30/6/24     Scope finalised and Draft Plan completed and under final review.
        Development Plan.                                              Development
                                                                       /Strategy &
                                                                       Sustainability

3.5.1   Complete the next stage of the Peregian Digital Hub and        Peregian         30/06/2024   Stage 2 of the Peregian Digital Hub has been completed and is now fully operational.
        continue to invest                                             Digital Hub/                  The new facilities have contributed to a major growth in memberships and revenue.
        in the ongoing development of Noosa's position as a            Economic                      Industry development work is ongoing, to build Noosa's profile as an attractive
        technology and innovation hub incl. Work with Industry         Development                   location for building tech startups and working in the digital sector.
        Partner to generate and secure Business/Industry Leads,        /Strategy &
        Develop a joint Innovation Precinct investment prospectus.     Sustainability



3.6.1   Complete stage 3 of the Regional Art Gallery Feasibility       Arts & Culture   30/06/2024   Pre-Feasibility study 2 has been completed and tabled. Knight Frank Australia has
        Project including Business Plan.                                                             been engaged to complete the Business Plan, on track to be completed by November
                                                                                                     2024.


3.6.2   Support the professional development of local arts workers     Arts & Culture   30/06/2024   Completed through Cultural Development Programs (Grow Your Arts, RADF), Gallery
        to increase their ability to participate in the creative                                     exhibition and public programs and professional development programs through the
        economy.                                                                                     Digital Hub.
3.7.1   Finalise the development of the new Waste Management           Waste &            Oct-23     Completed document is called "From Waste to Resource: Waste Plan 2023-2028",
        Strategy.                                                      Resource                      endorsed by Council in October 2023.
                                                                       Recovery
3.7.6   Investigate further options to increase waste diversion from   Waste &          30/06/2024   Reverse Vending Machine (RVM) trial is now complete, as well as the purchase of
        landfill.                                                      Resource                      RVM for the Eumundi Road Landfill.
                                                                       Recovery
3.8     Finalise the Industry and Employment Activation Plan           Economic         30/06/2024   Industry and Employment Land Activation Plan and grant acquittal completed.
        (IAEP) incl. work with state and federal governments to plan   Development
        and implement priority initiatives and seek further grant
        funding to enable successful project progression.

Page 18

On Track Initiatives
OP     Initiative                                                      Service/Mgr      Status   Reason for Status
Ref                                                                    Responsible
3.1.1  Develop and Implement Noosa Economic Development                Economic                  Priority projects at varying stages of advancement and ongoing.
       Smart Biosphere Strategy (NEDS) Action Plan and identify        Development               Future Skills Learning Hub Business Case ITQ has gone to market.
       and advance priority projects aligned to NEDS to be                                       Council Events Strategy ITQ has gone to market.
       implemented. (also relates to 4.7.5)                                                      Note-relisted in the new 24/25 Operational Plan


3.1.2   Finalise Green Economy Industry Development Plan               Economic                  Final draft completed and under final review by the Director and approval prior to
                                                                       Development               presentation to Council for approval.
                                                                                                 Note- relisted in the new 24/25 Operational Plan

3.2.1   Scope a Noosa Future Skills Plan to identify current and       Economic                  Due to internal team restructure, project was later in commencement but on track for
        future skill needs                                             Development               delivery in FY 24/25.
        for priority Noosa businesses.                                                           Note-relisted in the new 24/25 Operational Plan

3.2.2   Work with key stakeholders to identify effective pathways to   Economic                  Due to internal team restructure, project was later in commencement but on track for
        future skills for Noosa students and active learners and       Development               delivery in FY 24/25.
        establish education business partnerships.                                               Note-relisted in the new 24/25 Operational Plan

3.3     Scope the preparation of a Food and Agribusiness Industry      Economic                  Draft Plan completed and under final review.
        Development Plan.                                              Development /             Note-relisted in the new 24/25 Operational Plan
                                                                       Strategy &
                                                                       Sustainability
3.7.2   Implement best practice waste management practices             Waste &                   Implementation of best practice waste management practices are ongoing as part as
        and continuous improvement across all waste functions          Resource                  business as usual in the Waste department.
        and assets.                                                    Recovery                  Note-relisted in the new 24/25 Operational Plan
3.7.3   Continue to pursue interventions to reduce contamination       Waste &                   Pursuit of interventions to reduce contamination in household waste recycling bins is an
        in household waste recycling bins.                             Resource                  ongoing as part of business as usual in the Waste department.
                                                                       Recovery                  Note-relisted in the new 24/25 Operational Plan
3.7.4   Undertake feasibility studies and development plans for        Waste &                   Compost facility feasibility study is now complete - A review of funding and procurement
        new waste infrastructure projects including anaerobic          Resource                  options are progressing. Solar feasibility/ROI study also complete, with further
        digestion, composting, biochar and solar and utilisation of    Recovery                  investigations required.
        landfill gas.                                                                            Note-relisted in the new 24/25 Operational Plan

3.7.5   Develop Noosa Landfill and Resource Recovery Facility          Waste &                   Stage 1 of the Noosa Landfill and Resource Recovery Facility Master Plan is complete
        Master Plan.                                                   Resource                  and going to Council for endorsement in the first quarter of the new financial year.
                                                                       Recovery                  Note-relisted in the new 24/25 Operational Plan


3.7.7   Review and agree KPIs with Waste’s main contractor for         Waste &                   Review is still in progress with intent to formalise via a deed of variation in the new
        continuous improvement to the contract.                        Resource                  financial year.
                                                                       Recovery                  Note-Ongoing and part of BAU

Page 19

Disrupted Initiatives
OP      Initiative                                                    Service/Mgr      Status   Reason for Status
Ref                                                                   Responsible
3.1.5   Advance the Sustainable Procurement Policy and establish      Procurement               Sustainable Procurement has been included in Council's Procurement Policy endorsed by
        practices for Council's procurement of services and                                     Council on 28 June 2024. Workshops to be held with Council to further develop the
        products.                                                                               operational application of the policy, in Q1/Q2 24/25.
                                                                                                Note-relisted in the new 24/25 Operational Plan

3.4     Scope and prepare a pre-feasibility for a Food and Agri       Economic                  Initially this action was being led by Strategic Planning, however because of insufficient
        Business HUB.                                                 Development               capacity it was transferred to ECDEV. The initiative was included in the Industry and
                                                                      Manager/                  Employment Activation Plan which is delayed because of a dispute with the consultant
                                                                      Strategy &                (through NC Procurement). Initiative to be scoped in FY24/25.
                                                                      Sustainability            Note-relisted in the new 24/25 Operational Plan


3.5.2   Complete amendments to Noosa Plan to support and              Strategy &                Proposed amendments currently on public notification until 14 July 2024.
        enable the Innovation precinct at the Shire Business Centre   Sustainability            Note-relisted in the new 24/25 Operational Plan
        to develop.

Page 20

Future Theme – Q3 Initiatives Progress


Highlights
1. Significant Deep Dive Analysis of Community Feedback overlayed on Destination Management Action Plan.

2. First destination in Australia to achieve Silver Destination Eco-Accreditation.

3. Second stage of consultation undertaken for the Pomona Place pilot project.

4. Success in obtaining funding grants for the delivery of flood resilience projects.




                                                                 Q4 Status of Initiatives - Future Theme

                                          Total                                                                  28

                               Major Disruption              5
                                                                                                                           Complete
                      Status




                               Minor Disruption                  6                                                         On Track
                                                                                                                           Minor Disruption
                                      On Track                               11
                                                                                                                           Major Disruption

                                     Complete                    6                                                         Total

                                                  0      5              10               15            20   25        30
                                                                                  No. of Initiatives

Page 21

        Complete Initiatives
OP       Initiative                                                    Service/Mgr        Date          Comments
Ref                                                                    Responsible        Delivered
4.4.2    Contribute to the review of the SEQ Regional Plan,            Strategy &         30/06/2024    Submission and input to SEQRP review complete.
         including the provision of data and Council submission        Enviro Director
         into the public consultation process.                         / Strategy &
                                                                       Sustainability
4.6.1    Develop a staged Plan for the Brisbane Olympics and           CEO /              30/06/2024    Draft staged plan developed.
         Paralympics 2032.                                             Community
                                                                       Services
                                                                       Director
4.6.2    Develop and maintain relationships with key Brisbane          CEO /              30/06/2024    Involvement with key local and state stakeholders ongoing at both officer and
         2032 stakeholders.                                            Community                        leadership levels.
                                                                       Services
                                                                       Director
4.7.4    Scope the development of a Food and Agribusiness              Economic           30/06/2024    Completed Plan informs ongoing partnership and collaboration with Food and
         Industry Development Plan which supports landholders          Development                      Agribusiness Network (FAN).
         on regenerative agriculture methods and sustainable food
         production.
4.7.5    Finalise the Green Economy Industry Development Plan          Economic           30/06/2024    Completed Plan informs ongoing activities including the Brownee Sustainability Pilot
         and initiate implementation. (also relates to 3.1.1)          Development                      with 20 x Green Businesses.

4.8.2    Advance Phase 2 of the Urban Greening Strategic Action        Strategy and       30/06/2024    Significant progress has been made in Phase 2 over FY24, including completion of four
         Plan, including further investigations into heat risk         Sustainability/                  analyses/reports, however, full implementation of Phase 2 (including Urban Greening
         reduction.                                                    Infrastructure                   Master Plan) is subject to future grant funding and additional staff resources.
                                                                       Director



On Track Initiatives
OP     Initiative                                                       Service/Mgr        Status      Reason for Status
Ref                                                                     Responsible
4.2.2  Initiate implementation of the Destination Management            Economic                       Collaboration on DMP Action Plan (including Deep Dive overlay) is ongoing.
       Plan (DMP) Action Plan in collaboration with priority            Development                    Note-relisted in the new 24/25 Operational Plan
       internal and external stakeholders. (also relates to 4.2.1)

4.2.3    Undertake a review of the Tourism Noosa Partnership            Economic                       Formal discussions with TN commence in July 2024 and remain conditional on
         Agreement to align with DMP outcomes.                          Development                    completion of DMP.
                                                                        Manager                        Note-relisted in the new 24/25 Operational Plan

4.5.1    Initiate the Place Pilot Program in Pomona in collaboration    Strategy &                     2nd phase of community consultation and community organisations workshop on
         with the community.                                            Enviro Director                prioritisation of proposed actions completed June 2024.
                                                                        / Strategy &                   Note-relisted in the new 24/25 Operational Plan
                                                                        Sustainability
4.5.2    Commence implementation of the Place Action and                Strategy &                     2nd phase of community consultation and community organisations workshop on
         Implementation Plan.                                           Sustainability                 prioritisation of proposed actions completed June 2024. Draft Place Plan being prepared.
                                                                                                       Note-relisted in the new 24/25 Operational Plan

Page 22

4.5.3   Finalise the review of the Noosa Design Principles and         Strategy &        Graphics being prepared to support final draft document for publishing.
        engage with key stakeholders to increase awareness and         Sustainability    Note-relisted in the new 24/25 Operational Plan under the Environment Theme 1.8.1
        application of these principles. (also relates to 1.8.2 &
        4.7.6)

4.7.1   In conjunction with key stakeholders initiate development of   Strategy &        Working with Zen Inc on community emissions reduction projects including supporting the
        a community education and engagement plan to assist the        Sustainability    EV Expo and "electrify everything" program. Supported Noosa Environment Hub to
        Noosa Community reduce its emissions.                                            deliver the Youth Climate Summit. Community education and education program will be
                                                                                         developed late 2024.
                                                                                         Note-Ongoing and part of BAU
4.7.2   Advocate to the Federal Government and State                   Project           Information provided to businesses on emissions reduction funding and support
        Governments for funding to support our business                Officer Carbon    opportunities via newsletters and industry events.
        community to support emissions reductions.                     Reduction/        Note-Ongoing and part of BAU
                                                                       Economic
                                                                       Development
4.8.1   Advance the Sunshine Coast and Noosa Regional Climate          Strategy &        On track in Phase 4 of the two-year project.
        Action Roadmap by delivering the Regional Cascading            Sustainability    Note-relisted in the new 24/25 Operational Plan
        Risks and Critical Infrastructure Failure Project with         Manager
        Sunshine Coast Council.

4.8.6   Deliver Disaster Preparedness, Resilience and Recovery         Disaster          Training opportunities continue to be provided by disaster management coordination
        activities to support Council and the broader community.       Management        software providers Guardian on a regular basis with the next training scheduled for
                                                                       Project Officer   September 2024. Training exercises for both the LDCC and LDMG will be conducted in
                                                                                         July 2024 in the new LDCC Building providing opportunities for learnings in line with Qld
                                                                                         Disaster Management Arrangements. Cybersecurity upgrades to Guardian software have
                                                                                         been completed.
                                                                                         Note-relisted in the new 24/25 Operational Plan

4.8.7   Implement the Disaster Recovery Plan for the 2022 Floods       Community         Assisted in community outreach to residents affected by landslides. This involves an early
        & Rain Event.                                                  Development       intervention approach using strength-based methods to ensure people are heard and
                                                                       Coordinator       their well-being is prioritised through supportive mechanisms. An ongoing support worker
                                                                                         is allocated for continuous check-ins plus a number of community activities held in the last
                                                                                         quarter - Thrive Youth Festival - 250 attendees; All abilities event - 75 participants and 25
                                                                                         exhibitors; destress through breath mediation; mindfulness walks; kin kin neighbours day
                                                                                         BBQ - 150 attended; Qi Gong and Art Therapy - aiming to improve mental health.
                                                                                         Currently seeking an extension of the position and funding for an additional 6 months.
                                                                                         Note-relisted in the new 24/25 Operational Plan
4.8.8   Continue to Deliver the Disaster Recovery Funded               Infrastructure    Disaster Recovery Funded project delivery continues into the new financial year with
        Projects including Black Mountain Landslides, Black            Planning          several projects already completed.
        Pinch Landslides and other funded projects.                    Design &          Note-relisted in the new 24/25 Operational Plan
                                                                       Delivery

Page 23

Disrupted Initiatives
OP      Initiative                                                    Service/Mgr       Status   Reason for Status
Ref                                                                   Responsible
4.1     Initiate the development of a Reconciliation Action Plan      Strategy &                 This project has not formally commenced however regular engagement is occurring with
        including develop and complete the Reflect phase.             Enviro Director            Kabi Kabi including the development of an Engagement Protocol and workshops on major
                                                                      / Community                initiatives including Pomona Place, Noosa Regional Gallery and Noosa Foreshore
                                                                      Services                   Masterplan.
                                                                      Director                   Note-initiative to continue to engage with our traditional owners is relisted in the new
                                                                                                 24/25 Operational Plan

4.2.1   Progress the development of the Destination Management        Economic                   Deep Dive Analysis completed. Community Engagement Phase 2 scheduled for
        Plan to incorporate community engagement feedback on          Development                August/September 2024.
        the draft plan for Council endorsement.                                                  Note-relisted in the new 24/25 Operational Plan

4.3     Develop initiatives/concept to facilitate youth engagement    Comms &                    Ongoing discussions occurring with Executive Team as it is challenging to get agreement
        in CE and decision making with the goal of increasing         Community                  on how best to facilitate this. Initial discussions planned with Principal School Network to
        youth representation.                                         Engagement                 ascertain whether this is a possible initial first step.
                                                                                                 Note-relisted in the new 24/25 Operational Plan

4.4.1   Initiate preparation of an Advocacy Plan that addresses top   Strategy &                 This was not delivered last year due to competing priorities however a list of key
        10 Shire wide issues and infrastructure needs.                Enviro Director            advocacy issues was prepared for the Mayor for the Comseq Ministerial delegation.
                                                                                                 Note-relisted in the new 24/25 Operational Plan

4.7.3   Deliver the community battery for Noosaville and identify     Economic Dev               A minor disruption to the community battery progress, awaiting outcomes of advocacy
        further strategic locations across Noosa LGA for              / Project                  around Energex tariff structure to ensure the viability of the project.
        Community Batteries, microgrid opportunities, EV charging     Officer Carbon             Note-Ongoing and part of BAU
        in readiness for future grant funding.                        Reduction

4.7.6   Finalise the Noosa Design Principles update to embed          Strategy &                 Graphics being prepared to support final draft document for publishing.
        climate resilience, nature positive and low carbon            Sustainability             Note-relisted in the new 24/25 Operational Plan under the Environment Theme 1.8.1
        considerations into the principles.(also relates to 1.8.2 &
        4.5.3)

4.7.7   Develop the Emissions Offset strategy/plan for council        Project Officer            On track for preparation late 2024.
        emissions.                                                    Carbon                     Note-relisted in the new 24/25 Operational Plan
                                                                      Reduction
4.8.3   Launch the Climate Wise Communities Program in                Disaster                   Delivery of the Climate Wise Communities website has experienced technical challenges.
        partnership with Disaster Management.                         Management                 Staff continue with the contractor to resolve these issues with launch expected later in
                                                                      Project Officer            2024.
                                                                                                 Noosa’s Local Resilience Action Plan (LRAP) continues to be developed in consultation
                                                                                                 with QRA with delivery by the end of 2024. Finalisation of this plan will inform future
                                                                                                 funding opportunities.
                                                                                                 Note-considered part of the initiative 'to deliver disaster preparedness, resilience and
                                                                                                 recovery activities to support council and the broader community’. Relisted in the new
                                                                                                 24/25 Operational Plan

Page 24

4.8.4   Continue implementation of the Coastal Hazards              Strategy and     Living Foreshores Noosaville (linked to Noosaville Foreshore Infrastructure Master Plan)
        Adaptation Plan, including planning for Living Foreshores   Sustainability   has minor timeline disruptions due to community consultation Round 2. Living Foreshores
        Noosa, Coastal Wetland Restoration Project.                                  Hilton Esplanade has minor timeline disruptions due to significant increase in consultancy
                                                                                     market rates that are being worked through with QCoast. Coastal Wetland Restoration
                                                                                     Project Phase 1 (Blue Carbon) complete with final report received in June 2024.
                                                                                     Note-relisted in the new 24/25 Operational Plan

4.8.5   Advance flood resilience projects including updating the    Strategy and     Flood Management Operational Plan in final draft. Noosa River Flood Study and Six Mile
        Noosa River Flood Study, Six Mile Creek Flood Study and     Sustainability   Creek Flood Study updates are on track with ITQ now closed and tender evaluation and
        Noosa Flood Management Operational Plan.                                     award to be completed within Q1. Estimated completion June 2025.
                                                                                     Note-relisted in the new 24/25 Operational Plan

4.9     Commence development of a program for long term             Corporate        Initial pipeline of work being developed as part of the Long-Term Financial Plan.
        implementation of contemporary revenue diversification      Services         Note-relisted in the new 24/25 Operational Plan
        and a strategic investment approach that identifies         Director
        innovative and alternate revenue streams for council.

Page 25

Excellence Theme – Q3 Initiatives Progress


Highlights
1. Customer Service desk trial has commenced at Cooroy Library providing a face-to-face customer service option for hinterland residents.

2. Pilot Customer Experience training program commenced.

3. Strategic Land Review project underway to inform optimal decision making on Council landholding.

4. Induction of new Council.

5. Organisational commitment to improve IT technical and cyber security.

6. Delivery of capital projects with highlights including: Noosa Heads, Dog Beach Sand Nourishment Works; Noosa Heads, Garth Prowd Bridge – Renewal; Sunshine Beach,
Belmore Tce - Pathway Renewal; Noosaville – Noosaville Library – Public Amenities Upgrade.

7. Community engagement on the Noosaville Foreshore Infrastructure Master Plan with significant and diverse reviews received from the community.




                                                           Q4 Status of Initiatives - Excellence Theme

                                          Total                                                                        27


                               Major Disruption            5
                                                                                                                                     Complete
                      Status




                               Minor Disruption                  8                                                                   On Track
                                                                                                                                     Minor Disruption
                                      On Track        4
                                                                                                                                     Major Disruption
                                                                                                                                     Total
                                     Complete                             10

                                                  0    5             10               15            20         25             30
                                                                               No. of Initiatives

Page 26

Complete Initiatives
OP     Initiative                                                      Service/Mgr        Date         Comments
Ref                                                                    Responsible        Delivered
5.2.2  Review the long-term financial plan with enhance linkage        Corporate          30/06/2024   New Financial Plan adopted with 2024/25 Budget as part of Phase 1. Future phases
       key future strategies including the Corporate Plan, the new     Services                        of work during 2024/25 will update the Financial Plan to incorporate Revenue
       Capability Plan, Asset Management Plans and other key           Director                        Diversification Plan and AMPs.
       Council strategies and master plans.

5.2.4   Review sustainability and reporting practices which are        Corporate          30/06/2024   New Sustainability Indicators reviewed and implemented as part of the 2024/25
        appropriate to council and in accordance with statutory        Services                        budget.
        requirements.                                                  Director

5.3.2   Implement license plate recognition in Local Laws parking      Local Laws &       30/06/2024   Procurement of the vehicle, LPR technology, systems and communications plan
        management.                                                    Environmental                   complete. LPR systems implemented 20 April 2024. Final in configuration being
                                                                       Health                          completed. Project has been subject to slight delays due to ICT integration and PR
                                                                                                       challenges. Scheduled to 'Go Live" on 22 July 2024.

5.3.3   Implement Noosa Libraries app to allow library members         Libraries          Nov-23       Over 1000 registered users and over 100,000 app interactions since launching the
        virtually manage their library account, loans, and bookings.   Coordinator                     app in November 2023.

5.4.3   Provide programs that support the wellbeing of employees.      People &           30/06/2024   This is now operational through the WHS team and the THRIVE Working Group.
                                                                       Culture

5.4.4   Review the Workplace Health and Safety Policy and              People &           30/06/2024   Completed 16 October 2023.
        develop a new Workplace Health and Safety Management           Culture
        System Plan.

5.5.1   Implement the Opportunity Risk Management Policy and           Governance /       30/06/2024   The Enterprise Risk & Opportunity Management Framework (EROMF) was
        Framework with a focus on Council’s strategic risks            Executive                       implemented in August 2023. Two Risk & Opportunity workshops to train staff in the
        and working with the organisation to identify and mitigate     Officer Internal                use of the EROMF were held in September 2023 and May 2024. EROMF support
        against risks and strengthen risk management.                  Audit &                         provided to operational teams for 19 projects and to all major projects of the 2024/25
                                                                       Corporate                       capital works program.
                                                                       Performance

5.5.5   Plan for the local government elections in March 2024 and      Executive          30/06/2024   Successful completion of Elections 2024 and full induction program was undertaken
        the induction of the new Council.                              Officer                         for the new incoming Mayor and elected members including full briefings from each
                                                                       Coordination &                  directorate, training by LGMA and Office of the Independent Assessor, QRA and State
                                                                       Support                         Government departments.

5.6     Implement the new CE Policy and Framework and increase         Comms &            30/06/2024   Framework adopted and operational. Training conducted in May 2024 with 20
        the capabilities of engagement ambassadors throughout          Community                       engagement ambassadors across the organisation. Further progress of this initiative
        the organisation through training and collaboration to         Engagement                      to occur in next 12 months.
        ensure better outcomes when conducting CE on projects
        and initiatives to build organisational and to deliver best
        practice community engagement.

5.9.2   Deliver library services and activities beyond library         Libraries          30/06/2024   Approximately 1000 people have had the opportunity to engage with the various
        branches and into community settings.                          Coordinator                     library literacy and learning programs provided within community settings this past
                                                                                                       year.

Page 27

On Track Initiatives
OP     Initiative                                                    Service/Mgr        Status   Reason for Status
Ref                                                                  Responsible
5.1.1  Develop and commence implementation of a Customer             Community                   Draft Customer Experience Program developed. Implementation dependant on
       Experience Program.                                           Services                    resourcing availability.
                                                                     Director                    Note-relisted in the new 24/25 Operational Plan

5.1.2   Investigate options for expanding Council Customer           Community                   Trial Customer Service desk at Cooroy Library underway - due for review in Nov 2024.
        Service operations beyond Tewantin administration            Services                    Note-relisted in the new 24/25 Operational Plan.
        building.                                                    Director
5.4.5   Prepare for and commence the negotiation process to          People &                    Preparations undertaken including representatives on the Bargaining Team and
        negotiate Council’s new certified Agreement.                 Culture                     identification of workplace issues. Negotiations to commence in September 2024.
                                                                                                 Note-relisted in the new 24/25 Operational Plan
5.5.2   Implement actions to increase the effectiveness of the       Executive                   Progress to action recommendations from the review of the effectiveness of the Audit and
        Audit and Risk Committee and the internal audit function.    Officer Internal            Risk Committee and internal audit model underway with the involvement of the ARC.
                                                                     Audit &                     Note-relisted in the new 24/25 Operational Plan
                                                                     Corporate
                                                                     Performance


Disrupted Initiatives
OP      Initiative                                                   Service/Mgr        Status   Reason for Status
Ref                                                                  Responsible
5.1.3   Assess the community’s satisfaction with Council services    Community                   Delayed to 2024/25 pending resource availability.
        and Liveability score.                                       Services                    Note-relisted in the new 24/25 Operational Plan.
                                                                     Director / CEO
5.2.1   Identify efficiencies in Council Utilities incl (water,      Corporate                   Utilities Analyst engaged and commencing 2-year analysis, review and implementation
        sewerage, electricity, gas) to ensure cost effective and     Services                    program.
        efficient services in line with sustainability principles.   Director                    Note-relisted in the new 24/25 Operational Plan
5.2.3   Develop Council's Performance Measurement Framework.         Executive                   The development of the Framework is progressing. A review of service profiles including
                                                                     Officer Internal            the identification of efficiency and effectiveness measures was undertaken with the
                                                                     Audit &                     Service Catalogue included in the 24-25 Budget adoption process. Corporate Plan
                                                                     Corporate                   performance measures/data being refined in preparation for reporting to Council.
                                                                     Performance                 Note-relisted in the new 24/25 Operational Plan

5.2.5   Finalise the Contract Management Framework and develop       Procurement                 Contract Management Framework & suite of documents has been finalised.
        an implementation plan.                                                                  Implementation Plan to be finalised in Q1 24/25.
                                                                                                 Note-continuing, to be included in new 24/25 Operational Plan.

5.3.1   Develop a new ICT and Digital Strategy to provide the        Corporate                   New ICT Management leading development of new ICT and Digital Strategy. Baseline
        foundation for technology requirements and digital           Services                    assessment complete.
        transformation over the next 5 years.                        Director                    Note-relisted in the new 24/25 Operational Plan

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.