Appendix D - Engineering Assessment · OPW26/0090
The results of the Rational Method analysis are summarised in Tables 1, 2, and 3. Full Rational Method
calculations are also attached to this letter.
Table 1 Pre-Development Rational Method
Area [ha] C10 Minor Storm Major Storm
Discharge [m3/s] Discharge [m3/s]
Subject Site 0.1710 0.76 0.053 0.157
Table 2 Post-Development Rational Method
Area [ha] C10 Minor Storm Major Storm
Discharge [m3/s] Discharge [m3/s]
Lot 1 (Vacant) 0.0540 0.70 0.015 0.046
Lot 1 (Developed) 0.0540 0.85 0.019 0.054
Lot 2 0.1170 0.88 0.042 0.118
Table 3 Combined Post-Development Discharges
Pre-Development Post-Development Difference Difference
[m3/s] [m3/s] [m3/s] [-]
Subject site Minor 0.053 0.061 0.008 +15%
Storm (Developed)
Subject site Major 0.157 0.172 0.015 +10%
Storm (Developed)
The results above indicate that the proposed kerb adaptor is a suitable arrangement for LPD1. As the
proposed Reconfiguring a Lot application introduces no new impervious areas to the site, no further
stormwater quantity controls (i.e. detention tanks) are recommended at this stage1.
A review of the Low-Density Residential Zone Code and the Low-Density Housing Code confirms that
stormwater detention is not required to meet the relevant Performance Outcomes. No on-site detention to
maintain pre-development discharge rates is anticipated for the future development of Lot 1, unless
conditioned by Council as part of the Development Approval.
Stormwater Quality
The State Planning Policy proposes triggers for stormwater quality management that apply to ‘high-risk’
developments. The criteria include one or more of the following:
- A Material Change of Use for an urban purpose which involves greater than 2,500m2 of land that:
o will result in an impervious area greater than 25% of the net developable area; or
o will result in six (6) or more dwellings.
- A Reconfiguration of a Lot for urban purposes that involves a land area greater than 2,500m2 and
will result in six (6) or more lots; or
- Operational works for urban purposes that involve disturbing more than 2,500m2 of land.
1
The minor increase in combined discharges from Lot 1 (Vacant) and Lot 2 is due to assumptions regarding C10 values
rather than a material change to catchment hydrology.
www.sunshinecoastcivilengineers.com
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix D - Engineering Assessment.pdfRelated documentApplication case desk ↗
Appendix D - Engineering Assessment.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.