107. Council’s waste collection service during Stage 1 will not commence until the required road
access and waste storage facilities (including temporary ones), are in place.
108. A Waste Management Plan (construction and demolition) shall be submitted prior to
demolition, removal or relocation of any building other than a shed. Waste Management Plan
(construction and demolition) is also required for construction of 15 or more dwelling units or
for any business use of greater than 500m².
Waste Management Plans (construction and demolition) are required to be submitted in
accordance with Planning Scheme Policy 11, Waste Management Plans see table below.
Waste storage areas are to provide for adequate separation of all reusable, recyclable and
waste materials. These shall be located so that they are convenient and safe to use. The Plan
shall contain the following information:
The site area for the storage and separation of waste is to be shown on the plan
drawings accompanying the application.
A waste management table as indicated below is to be completed showing how waste
material is to be segregated - recycled – reused or disposed.
MATERIALS ON-SITE DESTINATION
Re-use and Recycling Disposal
Expected waste Estimated On-site Off-site *specify
materials volume *specify proposed *specify contractor and
(m³) re-use or on-site contractor and landfill site or
recycling recycling outlet other disposal
methods site
Excavation
material
Green waste
Bricks
Concrete
Timber-please
specify
Plasterboard
Metals - please
specify
Asbestos
Other - please
specify
Note * If a demolition contractor is undertaking works, then the Waste Management table is to
be completed by the demolition contractor.
The purpose of the Waste Management Plan is to facilitate the segregation of waste for the
effective reuse and recycling of such materials. Additionally Council rewards those who
segregate waste by significantly reducing disposal fees at the landfill some items are free.
Higher gate fees are charged for loads of mixed waste.
Mosquito Protection
109. Submit a Management Plan for the control of mosquitos from the three large water basins,
including form of construction of basins, vegetation in and along the shoreline, on-going
monitoring and eradication treatments. Plan is to be approved by Council’s Environmental
Health Section.
110. Doors and windows of the Aged Care Residence, Apartments, Community Centre and
Independent Living Units are to be fitted with insect screens.
Page 15 of 32
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice plus copy sent to Referral Agencies [As Published]Related documentApplication case desk ↗
About this file
- File size
- 644 KB (small file)
- File type
No other editions are linked here.