101.4 The waste storage areas at the Aged Care Residence, Apartment Building, Village
Community Centre and temporary service to the Independent Living Units whilst under
construction, each require their own separate bin wash facility.
101.5 Submit details for approval of the proposal for bin washing of the recycling bins
located at the service nodals.
101.6 Council will not provide a roadside collection service to the 80L and/or 120L general
waste wheelie bins at the Independent Living Units after their completion. The
following options must be considered including client costings, and an alternative
proposed for approval.
101.6.1 Option 1: Continue the temporary service of the bulk bins as a permanent
arrangement. This requires:
Details of the permanent waste storage area (location, size, bin
wash, etc).
HRV 12.5m length travel path and turning access for collection.
OR
Option 2: Provide a roadside collection service of 240L general waste
wheelie bins (one bin shared between two units). This requires:
10m vehicle length (not 9m as proposed) travel path and turning
access for collection.
Where possible bins are to be placed on one side of the road only to
prevent duplication of travel path and minimise service time and
travel.
The “Turning Path 3” at the north western corner cul-de-sac to be
deleted. The bins for these nine units are to be placed at the
nearest trafficable thoroughfare for collection without any
unnecessary reversing or turning.
102. Provide an adequate number of recycling bins (240L or 1.1 cu.m. bulk) at the waste storage
areas of the Aged Care Residence, Apartment Building, Village Community Centre and
temporary service to the Independent Living Units whilst under construction. The proposed
HRV 12.5m length travel path and turning access to these areas will suffice for collection.
103. The 240L recycling wheelie bin service to the completed Independent Living Units requires:
103.1 Size of the service nodals to increase to accommodate eight bins i.e. one bin shared
between two units.
103.2 10m vehicle length (not 9m as proposed) travel path and turning access.
103.3 Bulk bins (1.1 cu.m.) may also be considered provided HRV 12.5m length access is
available.
104. Plans are to be submitted for approval by Council’s Environmental Health Section of the HRV
12.5m and 10m length waste vehicle travel paths and turning access. Plans must clearly show
routes and ensure that vehicle overhangs when turning are clear of all obstructions e.g. posts,
poles, fences, landscaping, etc.
105. All road traffic islands are to be trafficable for the waste vehicles.
106. All bins are to be placed in the correct position for collection at the roadside without the need
of the driver leaving the waste collection vehicle.
Page 14 of 32
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice plus copy sent to Referral Agencies [As Published]Related documentApplication case desk ↗
About this file
- File size
- 644 KB (small file)
- File type
No other editions are linked here.