Stormwater Drainage
65. A suitably qualified Registered Professional Engineer, specialising in hydraulics shall prepare
engineering drawings and specifications for stormwater designs and shall be submitted in
conjunction with an application for a Development Permit for Operational Works.
66. Peak discharges of stormwater shall be managed in accordance with the Concept Stormwater
Management Plan for Cooroy Retirement Village Trading Post Road, Cooroy prepared by
Brown Consulting dated June 2008 and any subsequent amendments approved by Council.
67. Stormwater pipelines within the site shall cater for 1 in 10 Years storm event and secondary
flowpaths shall be provided within the site to cater for 100 years storm event.
68. The development must not adversely impact on the existing drainage conditions on other
properties including not depriving dams on other properties of their natural stormwater runoff.
69. The applicant shall revise the Concept Stormwater Management Plan for Cooroy Retirement
Village Trading Post Road, Cooroy prepared by Brown Consulting dated June 2008 to detail a
stormwater treatment train that can achieve Load Reduction Targets for Total Suspended
Solids, Total Phosphorous and Total Nitrogen in accordance with the Healthy Waterways
Water Sensitive Urban Design – Technical Guidelines for South East Queensland (2006). This
revised stormwater treatment train for the site shall ensure that nutrients can be adequately
treated prior to release off site. The revised Concept Stormwater Management Plan shall
specify water quality objectives for stormwater prior to it leaving the site to ensure the
modelled outcomes are achieved. All stormwater runoff treatment must be undertaken within
the development areas of the site.
The applicant shall submit an amended plan for Council approval prior to a Development
Permit for Operational Works being issued.
70. Stormwater Quality Improvement Devices as detailed within the Concept Stormwater
Management Plan for Cooroy Retirement Village Trading Post Road, Cooroy prepared by
Brown Consulting dated June 2008 and any updates approved by Council shall be installed
within the development to ensure compliance with the designated water quality objectives are
achieved. Stormwater likely to contain grease and oil (i.e. from carparking areas) shall be
managed via grease and oil arrestors prior to treatment within bioretention basins and
wetlands.
71. Wetlands and bioretention basins shall be designed and constructed in accordance with
Healthy Waterways Water by Design Construction and Establishment Guidelines: Swales,
Bioretention Systems and Wetlands February 2009.
72. A Stormwater Monitoring and Maintenance Plan (SMMP) shall be prepared ensure stormwater
treatment infrastructure is performing its intended purpose. The SMMP shall be approved by
the Council’s CEO or delegated officer prior to issue of any Operational Works Approval. The
SMMP shall specify:
72.1 performance indicators including water quality objectives;
72.2 monitoring schedule to ensure specified performance indicators are achieved;
72.3 maintenance schedule for all elements of the stormwater treatment train;
72.4 reporting requirements;
72.5 corrective actions for non compliance with performance indicators; and
72.6 responsibility framework.
Sewer Mains
73. The site must be connected to Council's existing sewerage reticulation system by gravity, and be
constructed in accordance with Council's standards and requirements at no cost to Council.
Page 9 of 32
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice plus copy sent to Referral Agencies [As Published]Related documentApplication case desk ↗
About this file
- File size
- 644 KB (small file)
- File type
No other editions are linked here.