Original source · versioned page text
2019-02-12 Services & Organisation Committee Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
SERVICES & ORGANISATION COMMITTEE MEETING AGENDA 12 FEBRUARY 2019
BRANCH ACTIVITIES RECENT ACHIEVEMENTS CURRENT PRIORITIES THE NEXT QUARTER
Legislative Compliance IGEM Annual Report completed Review of emerging legislation. Progress future implementation of
Monitor, develop and maintain QRA – NDRRA quarterly report DRFA Compliance Queensland Emergency Risk
compliance levels in accordance with completed Management Framework.
Local, State and Commonwealth Get Ready QRA acquittal Audit staff training in compliance
requirements. completed. with Qld Disaster Management
Training Framework to ensure
compliance.
Business as usual activities Operational Activities – Watching Replacement of DMO due to Interview applicants for replacement
Brief conducted due to early season resignation in Dec 2018. DMO position.
storms 8 to 15 Oct 18. Replacement DMO appointed on
casual basis.
Position advertised for temporary
full time replacement, closed 21
January 2019.
Infrastructure Planning, Design &
Delivery
Signage Policy - finalise signage Refining signage requests process Implement signage guidelines and Implement signage guidelines and
guideline & signage design criteria. for inclusion in revised draft criteria for use by staff. criteria for use by staff.
guidelines. Monitor and update as required. Monitor and update as required.
Finalised draft guidelines and
criteria for adoption by Director.
Streetscape Plans - progressive Survey of Noosa Drive and Hastings Reviewing base data available for Concept development for Noosa
development of Streetscape Plans in Street precinct is ongoing. Cooroy, Pomona, and Noosa Drive and Hasting Street precinct.
accordance with the Noosa Design Pioneer Park, Cooran design and Junction and Gympie Terrace Assess available base data for
Principles community consultation is complete. precincts continues. Cooroy, Pomona, Noosa Junction
Designs progressing for: and Gympie Terrace precincts and
o Noosa Parade, Noosa heads determine if additional survey is
o Peregian Beach Boardwalk, required.
amenities and Village Square. Collate and review background
Community consultation information for each precinct.
completed. Commence planning for the Noosa
Designs completed for: Junction to Noosa Heads transport
o Cooroy Hinterland Playground corridor in alignment with the
car parking. transport strategy and placemaking
principles.
Page 77 of 130
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.