Skip to the record
Accept no imitations.

Original source · versioned page text

2019-02-12 Services & Organisation Committee Agenda

of 130

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                         12 FEBRUARY 2019


BRANCH ACTIVITIES                           RECENT ACHIEVEMENTS                         CURRENT PRIORITIES                        THE NEXT QUARTER
                                                 wayfinding signage stage 2,               Delivery of Hilton Terrace service
                                                 Grosvenor Terrace stormwater                relocations, Noosa River Holiday
                                                 drainage, Noosa River Holiday Park          Park v-drain upgrades, Headland
                                                 amenities replacements and                  Park Playground renewal. Stan
                                                 upgrades.                                   Topper Park Basketball renewal, Jo
                                                 Consultation for Peregian Beach             Bazzo Park BBQ and pathways,
                                                 amenities, boardwalk, Village               Noosaville Library weather
                                                 Square,                                     protection and Cooroy Library Air
                                               Recruitment of Delivery Coordinator         conditioner plant room enclosure.
                                                 and temporary Designer position.          Recruitment of Project Coordinator
                                                                                             due to recent departures.

Transport Strategy
Investigate key transport strategies in        Implementation of the Peak Period         Evaluation of the Peak Period           Develop the ‘look ahead’ program.
the Noosa Transport Strategy 2017-               Traffic Management Plan                     Traffic Management Plan
2027.                                          Survey analysis of travel to school       Prepare 2019 schools program.
                                                 data for GSLC
Trial key transport strategy initiatives.      Successful delivery of trials during      Delivery of Easter 2019 trials          Evaluation of Christmas and Easter
                                                 December 2018 and January 2019                                                        2019 trials.
                                                 as part of the Peak Period Traffic                                                  Preparation of business cases for
                                                 Management Plan.                                                                      transport initiatives
                                                                                                                                     Develop scope for 2019 activities
                                                                                                                                     Planning activities for Cycle
                                                                                                                                       pathway network
                                                                                                                                     Continue working with key
                                                                                                                                       stakeholders.
                                                                                                                                     Progress Schools program




                                                                                                Page 79 of 130
Log in to download the original file

2019-02-12 Services & Organisation Committee Agenda(PDF, 8MB).pdf · 8.7 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.