Original source · versioned page text
2019-02-12 Services & Organisation Committee Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
SERVICES & ORGANISATION COMMITTEE MEETING AGENDA 12 FEBRUARY 2019
BRANCH ACTIVITIES RECENT ACHIEVEMENTS CURRENT PRIORITIES THE NEXT QUARTER
Development of new cells at Eumundi Commenced concept plan for new cell Preparing for extension of waste Remove existing and replace with
Rd Landfill 2.3 at Eumundi Rd landfill. disposal into stages 3 and 4 of cell new geotextile in stages 3 and 4 of
Stages 1 and 2 of cell 2.2 are nearing 2.2 at Landfill. cell 2.2 to receive waste.
completion to profile.
Implement action plan in the Waste Engagement of Doug Makenzie Mohr Development of behavioral change Review of waste audit information to
Reduction and Recycling Plan 2016- to supervise community engagement program under supervision of inform behavioral change program
2024 program for behavioral change to consultant Doug Makenzie Mohr.
reduce recyclables in the general
waste bin.
Coordination of November 2018
Recycling Week activities
MOU with Unity Water and regional Signed MOU with UnityWater, Informing Ramboll of waste volume Working with Unitywater to
Councils Sunshine Coast and Moreton Councils data to assist in determining implement the MOU feasibility
to conduct feasibility into regional the feasibility of organic study.
advance waste treatment facility. processing.
Assessed tenders and engaged
consultant Ramboll to conduct
feasibility study of advanced waste
treatment.
Full revision of Structure of Waste Utility Meeting with AEC regarding changes Developing new draft fees and Refer new fees and charges to
Charges to the waste charges for 2019/20 charges for 2019/20 including Council for approval in 2019/20 draft
revision of fees to include waste budget.
levy.
Business as Usual activities Covered above. Covered above. Develop 2019/20 budget.
Develop Capital Works Program for
2019/20.
Environmental Health
Develop follow up inspection program for Completed reinspection of 67 Report to council within section Further follow up inspections
outstanding problems with industrial properties - 70% of results and recommendations to required
Environmentally Relevant Activities those inspected still require a further introduce an annual inspection
(ERAs) for 2018/19 and work on a fee inspection highlighting the program funded by a Special
structure for 2019/20 as a special rate. need for ongoing inspections. Charge on certain industrial
properties.
Develop the list of premises and an List of accommodation premises with Complete educational material for Deliver educational material and
education program to commence pools compiled. businesses with public use pools carry out site advisory inspections
inspection and licensing of Commercial Develop new fees for the pool
Pools inspection program
Page 94 of 130
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.