Appendix B - Code Assessment
Attached to the e-mail Lodgement of Development Application - RAL25/0016.
Reconfiguring a Lot Code
PO11 No acceptable outcome provided PO11 – Not Applicable
Roadway and pathway layout are predominantly rectilinear with a The development does not involve any roadways or pathways.
high degree of permeability. Editor’s Note— Further detail on traffic and the road network is
addressed in Part 9.4.8 Transport Code
Infrastructure services Table 9.5.1.3 Criteria for assessment (part)
Performance outcomes Acceptable outcomes Assessment
Scenic amenity
Infrastructure and services
PO12 AO12.1 AO12.1 – Complies
New lots are located, sized and configured so as to ensure each All lots are connected to power supply and telecommunications The lots will be connected to power and telecommunications
lot is capable of being serviced by appropriate levels of services and where located within the Urban boundaries, power supply.
infrastructure including: supply and communications infrastructure are provided
underground.
a) power supply; AO12.2 – Not Applicable
b) telecommunications; and AO12.2 The site is not located in a water service area.
c) where within Local Plan Areas If located in a water service area each new lot can be connected
d) reticulated water supply; to Unitywater’s water supply network.
e) reticulated sewerage; and
f) stormwater drainage. AO12.3
AO12.3 – Not Applicable
If located in a sewerage service area each new lot can be
The site is not located in a sewerage service area.
connected to Unitywater’s sewerage network.
AO12.4 AO12.4 – Not Applicable
If located in a Local plan area lots can be connected to Council’s The site is not located in a Local plan area.
stormwater drainage network.
AO12.5 – Complies
AO12.5 Each lot will contain an existing effluent disposal system.
If not in a sewerage service area each lot has sufficient area and
other attributes to ensure efficient and effective on-site sewerage
disposal.
PO13 AO13.1 AO13.1 – Complies
Each lot is provided with safe and convenient vehicle access Vehicular access for the development is consistent with the The proposed development will utilise existing crossovers that
function and design of the road it takes access from. that will be upgraded to comply with Standard Drawing RS-056.
See the original