PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 21 JULY 2015
Street Identification
7. The street address of the development must be clearly visible and discernible from the
primary frontage of the site by the provision of a street number and, where appropriate, the
building name.
Building Design
8. The street awning must extend for the full width of the frontage and be setback 1m from the
face of the kerb. Amended plans must be submitted prior to the issue of an operational
works approval.
9. A variety of external material finishes must be incorporated to the north elevation and the
west elevation as indicated on the approved plan.
10. All mechanical equipment such as air-conditioning units, pumps or refrigeration and the like
must not be seen from Emerald Street.
Water & Sewer Connections
11. An underground connection to reticulated water and sewerage must be provided to the
development site in accordance with the standards and requirements of Northern SEQ
Distributor–Retailer Authority (Unitywater).
A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority
(Unitywater) must be submitted to Council that certifies an underground connection to
reticulated water and sewerage has been provided to the development site.
Landscaping Works
12. The development site must be landscaped. The works must be undertaken generally in
accordance with the approved landscaping plan, Planning Scheme Policy PSP 3
Landscaping Plants and Guidelines and in accordance with an Operational Works approval
and must include in particular:
a. the works shown on the Approved Plans
b. the Archontophoenix cunninghamiana must be deleted from within the garden along
the Emerald Street frontage and replaced with a native shrub
13. All landscape works must be established and maintained in accordance with the approved
design for the life of the development, and in a manner that ensures healthy, sustained and
vigorous plant growth. All plant material must be allowed to grow to full form and be
refurbished when its life expectancy is reached.
14. All landscape works must be maintained generally in accordance with the approved design
for the life of the development.
ENGINEERING
External Works
15. Emerald Street must be upgraded for the length of its frontage to the subject site. The
works must be undertaken in accordance with an Operational Works approval and must
include in particular:
a. a full width pathway extending from the property boundary to the kerb and channel
b. works to transition the new full width pathway to match smoothly with the existing
frontages of the adjoining properties. These works will extend beyond the frontage of
the subject site. The transitions must be constructed at grades that are in accordance
with Council’s Planning Scheme Policy 5 – Engineering Design Standards – Roads,
Drainage and Earthworks.
Page 33 of 140
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.