PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 21 JULY 2015
c. any necessary relocation or alteration to existing access from Emerald Street to the
adjoining property at 4 Emerald Street must be undertaken. The type and extent of
these works must be in agreement with the adjoining property owner and clearly
shown on plans submitted for operational works
d. any relocation/reinstatement of existing services in the road verge
These works are to be undertaken at no cost to Council.
This condition is imposed pursuant to s665 of the Sustainable Planning Act 2009 being
non-trunk infrastructure.
Site Access and Driveways
16. A sealed access driveway must be provided from Wimmers Lane to all parking and
manoeuvring areas of the development. The works must be undertaken in accordance with
an Operational Works approval and must include in particular extension of the existing
formation to the property boundary to provide a suitable access to the carparking area.
This condition is imposed pursuant to s665 of the Sustainable Planning Act 2009 being
non-trunk infrastructure.
Car Parking
17. A minimum of 23 car parking spaces must be provided and marked on the site and made
available and accessible at all times while the use is open for business. The works must
be undertaken in accordance with an Operational Works approval and must include in
particular:
a. 12 customer parking spaces within the total, which are clearly marked for that
purpose and accessible at all times for visitor use
b. 11 staff parking spaces within the total, which are clearly marked for that purpose
c. 1 disabled parking space within the total
d. crossfalls, dimensions and gradients in accordance with Australian Standard AS2890:
Parking Facilities.
18. All car parking areas and access driveways must be maintained exclusively for vehicle
parking and manoeuvring and kept in a tidy and safe condition at all times.
Bicycle Facilities
19. Six (6) bicycle parking spaces and 3 lockers must be provided for the development.
Stormwater Drainage
20. All stormwater drainage must be collected and discharged so there is no net increase in
stormwater runoff from the site.
21. The site must be provided with a stormwater drainage system connecting to a lawful point
of discharge. The works must be undertaken in accordance with an Operational Works
approval and be generally in accordance with drawing number 1501-02B prepared by
Callaghan and Toth dated March 2015.
Undergrounding of Existing Overhead Powerlines
22. The existing overhead electricity reticulation connection to the site must be removed and
any new connection must be provided underground.
Page 34 of 140
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.