PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 21 JULY 2015
Code Discussion
Planning Scheme Section 3.2 & 3.4 of the Policy outlines matters for consideration when
Policy 23 - assessing proposals for towers. The most applicable points associated
Telecommunication with the assessment of this proposal are:
Towers
3.2 a) Loss of vegetation on steep slopes or ridgelines; or
3.2 b) Visual scarring or the degradation of views or vistas from the
major road network; or
3.2 c) Alteration to key landform and landscape characters such that
they become dominated by the facility; or
3.4 d) Be positioned to minimise clutter of multiple facilities.
No removal of vegetation or alteration to the landforms is required for the
110m2 lease area. The tower will not be readily seen from the major road
network and the adjacent existing vegetation assists in screening the
base of the tower. The height of the tower also allows future colocation
opportunities with other telecommunication providers, consistent with the
outcomes of the Policy.
Infrastructure Uses The Code includes requirements around two central themes - Health &
Code Safety and Visual Amenity.
Health & Safety
The Specific Outcomes of the Code require the development to avoid
unacceptable risks to the environment or to personal and public safety.
The applicant has provided a summary of the maximum cumulative
radiofrequency (RF) and electromagnetic energy (EME) levels at ground
level emitted from the proposed tower, assuming full power usage. The
summary indicates the proposed tower will emit a maximum EME level
from the tower, which is 0.071% of the Australian Radiation Protection
and Nuclear Safety Agency’s (ARPANSA) regulated acceptable
maximum radiation public exposure limits.
Taking a precautionary approach to the sensitive issue concerning health
and safety over time, certification is to be provided by the
telecommunications carrier upon request. The certification must
demonstrate annual compliance with the Health & Safety requirements
compared to ARPANSA regulations.
Visual Amenity
The Code seeks for the tower to be below 25m height in the Rural zone.
The proposed tower is 41m high, with the applicant indicating the height
is required to provide appropriate coverage to the surrounding properties.
The tower will be sited amongst mature vegetation, near existing
electricity infrastructure and setback more than 400m from the closest
residential dwelling. As demonstrated by the photomontages of the tower
from Sankeys and Schreibers Roads (See Attachment 2), the proposal
is considered to be reasonably visually integrated with its setting and
existing infrastructure so as not to dominate views from surrounding
areas.
Page 55 of 140
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.