Original source · versioned page text
2015-07-21 Planning & Organisation Committee Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
Page 96 of 140
improving the water quality in those catchments.
With the solution that development complies with the
Seqwater Development Guidelines: Development
Guidelines for Water Quality Management in Drinking
Water Catchments
Include requirements | Planning Scheme Reference: Part 14 Division 4 — Table 14-19. | No change is proposed to the level of assessment or
that development Specific outcome 25 and associated probable solutions consistent uses within the locality plans (however the
complies with the overlay provisions will make development code
specific outcomes and | Action: Amend the community use code, open space Type 2 — Camp | assessable).
measures contained ground subject to require compliance with the Seqwater Development
in the Seqwater Guidelines or similar assessment requirements. Within the Community Uses Code the new Specific
Development Outcome and associated solutions are added as
Guidelines: The amended scheme provides that open space type 2, where a self- | requested.
Development contained RV ovemight area, is self-assessable in a rural zone (in Part
Guidelines for Water 4 Division 8 Table 4.6,
Quality Management | Part 6 Division 10 Table 6.8, Part 8 Division 9 Table 8.7) and
in Drinking Water consistent development on rural Zoned land within water catchment
Catchments 2012 or areas in Part 6 Division 24 Table 6.20 (O79) (j).
similar development
assessment Within the community uses code, Table 14-19 Open space Type 2 —
requirements Camp ground will be amended to add the following new specific
outcomes and associated solutions for water quality management:
Outcome O26 Camp grounds are tocated, designed and managed in a
manner to have no impact on the quality of drinking water catchments
of Lake Macdonald, Mary River or Cedar Pocket Dar.
Solution S26.1 For self-assessment, campgrounds, including self-
contained RV overnight areas are not located within the water supply
catchment shown on overlay maps OM1.5, OM3.5 or OM5.5.
AND
Solution S26.2 Campsites and associated facilities are at least 400
metres from the upper flood margin of Lake Macdonaid, 100m from the
surveyed bank of a permanent watercourse and 50m from the bank of
an intermittent water course where located in a water supply buffer
area,
Page 96 of 140See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.