6 May 2022
Eco Cottages Pty Ltd
C/- Brennan Planning Pty Ltd
44 Maple Street
Cooroy QLD 4563
Attention: Marcus Brennan
Via email: [email protected]
cc Noosa Shire Council
PO Box 141
Tewantin QLD 4565
Attention: Nadine Gorton
Via Email: [email protected]
Dear Marcus,
Request for Further Information – Development Permit for Material
Change of Use - Relocatable Home Park located at 55 and 70 Carpenters
Road Cooroy, described as Lot 2 on RP200519 and Lot 1 on SP248288
Applicant Ref: N/A
Council Ref: MCU22/0039
Our Ref: HBD 7607722
We refer to your correspondence regarding the above proposal.
The subject site is encumbered by Easement C on RP205029 and Easement
B on RP205029, which contains overhead 11kV powerlines operated by
Energex. This overhead electrical infrastructure is a critical component of
Energex’s distribution network.
The application material submitted proposes to utilise Easement C on
RP205029 (the easement) for an internal road. The plans do not provide an
indication as to how the road considers the power pole (being a physical Enquiries
obstruction). Energex is unsupportive of this outcome, given the potential for Maddison Low
Telephone
changing ground conditions and access and safety issues this creates for 0456 836 609
Energex vehicles, particularly with relation to the power pole. Facsimile
0456 836 609
Energex Limited acting as an assessing authority requires further information Email
to accurately assess the proposal and its potential impacts on the electricity Maddison.Low
infrastructure. In accordance with Part 3 of the Development [email protected]
Rules the following information is requested from the applicant:
Corporate Office
26 Reddacliff Street,
1. Amend the proposal plans to clearly demonstrate the easement free Newstead QLD 4006
from any development, including internal roads, lots, etc. Any roads GPO Box 1461
Brisbane Qld 4001
www.energex.com.au
Energex Limited
ABN 40 078 849 055
Reference: HBD 7607722
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 3 pages
Page 2
2
crossing the easement should be perpendicular to the easement and overhead
powerlines. Development is to ensure compliance with Energex Standard
Guidelines MD-03/12 (attached).
The requested information is to be provided to Energex within three months of the date
of this request. In accordance with section 13.2 of the Development Assessment Rules,
the Applicant’s response should advise Energex they are:
a) Providing all the information requested; or
b) Providing part of the information requested; or
c) Providing none of the information requested.
In accordance with section 14.2 of the Development Assessment Rules, is the Applicant
does not provide a response within three months of the date of this request (or a further
period agreed between the Applicant and Energex), Energex will finalise its assessment
of the development application without the additional information requested.
Should you require any further information on the above matter, please contact Maddison
Low on 0456 836 609.
Yours faithfully,
Maddison Low
Town Planner
Incl. Energex Standard Guidelines MD-03/12
Reference: HBD 7607722
Did you know Energex has a referral website?
https://www.energex.com.au/home/our-services/connections/development-application-referrals
Page 3
Standard Guidelines MD-03/12
When considering Works, either on Energex easements or in the vicinity of Energex
assets, please be aware of the following general conditions:
• Satisfactory clearance from your proposed structure to the existing (and/or future)
electricity wires must be maintained in accordance with the Electrical Safety
Regulations 2013.
• All previous conditions must be adhered to and Energex may, at its discretion,
audit the finished development to check that it conforms to the conditions of the
development.
• Natural ground levels on the easement are not be disturbed without Energex
approval. Detailed civil design drawings showing any proposed cut and fill levels
on the easement and the location of the Energex assets in relation to the
proposed development are to be submitted to and approved by Energex prior to
the commencement of any works on site.
• No civil works are to occur within 5 metres of any part of an Energex Structure (e.g.-
tower base, pole or stay) without Energex approval.
• If the minimum 5m horizontal separation to the Energex structure cannot be
achieved, the Developer must consult Energex with regards to allowable construction
methods. This may include full depth shoring of the excavation sides for a minimum
of 5 metres either side of the structure.
• Any excavations deeper than 5m must have a minimum horizontal separation from
the excavation to any tower, base or pole at least equal to the excavation depth. The
excavation is not to be left open overnight and backfill is to be compacted in 150mm
layers in the immediate vicinity of the structure.
• 10 metres clear access must be provided around all towers and pole structures after
the completion of any works on the easement.
• Final ground levels should slope gently to the edge of the easement, surrounding
area or kerb such that pooling of water on the easement is avoided and conductor
ground clearances are not decreased.
• Stockpiling of spoil on the easement is prohibited.
• Lighting structures are not permitted in the easement without prior written consent of
Energex. Lighting designs for proposed developments (e.g. road, carparks etc) on
the easement are likely to require reduced height structures. Please submit detailed
design to Energex for approval. These drawings must clearly show the following;
• Proposed height of the lighting structures and the ground level at the structure
base,
• Relative (to lighting structures) ground levels at Energex structures (towers, pole
etc) either side of the lighting structures, and
• The location of the Energex structures in relation to the proposed lighting
• Proposed underground services such as stormwater, sewerage, water and the like
are to be kept to the outer edge of the easement. Services crossing the easement
should be as near as practicable to right angles to the overhead conductor direction
and not within 10 metres of any tower, pole or stay. Pipelines and crossings are to
HBD 2479475 279920
Page 4
be clearly marked. Please submit the relevant design drawings to the Energex for
review.
The identification, assessment and mitigation of any possible hazards in the service
due to electromagnetically induced voltages, is the responsibility of the Developer.
• Any cut in the vicinity of a structure or between a structure and the road kerb will
need to be stabilised by a retaining wall. The retaining wall design and location is to
be submitted to Energex for approval.
• Any costs incurred by Energex as a result of the works on the easement are to be
met by the property Developer / owner.
• Access to the easement and access along the easement must be available to
Energex personnel and heavy equipment at all times. Energex will require the
Developer / owner to supply and install gates where fencing prohibits access to and
along the easement area. To enable travel along the easement at anytime the gates
must be series locked with an Energex padlock. Both the padlock and a design
drawing of an acceptable gate will be provided by Energex.
• At all times the following clearance must be maintained from the top of any
machinery moving in the vicinity of energised conductors:
• 132kV and 110kV conductors – 4.5m minimum clearance
• 33kV and 11kV conductors – 3m minimum clearance
• Should it be necessary to transport equipment or extend any equipment, such
that these clearances cannot be confidently maintained, you are required to
contact our office to ascertain whether a Safety Officer is required on–site. All
operators of machinery are to be made aware of the presence of high voltage
conductors.
• No planting is permitted in the Easement without prior approval from Energex. If
planting is proposed, the applicant is required to provide a Detailed Landscape
Plan to Energex for approval which:
o Keeps the planting of trees to the outer most edge of the easement and
not directly under any overhead conductors; and
o Plots the location of the overhead conductors (accounting for a cross-arm
if applicable and plotting the powerline on the outmost edge of each side
of the cross-arm); and
o Uses species included on Energex’s Safetrees list
(https://www.energex.com.au/about-us/our-commitment/to-the-
environment/vegetation/safetree-program); and
o Ensures a horizontal clearance is achieved between the tree and the
outer most conductor equal to the mature height of the tree.
HBD 2479475 279920