INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007
47 Is any of the proposed operational work to allow, under the Water Act 2000, for taking or interfering with subartesian water?

[e] No
( Yes

IPA sunedut? jy

  

  
 

me eytren’ Wed Rove it
nents " appucad & pc

 

2 area, .N

t t > dent fies tak.g of terior eg wit s .nartesin wit, © 27 tSsessabe!
% TO Cod. dow > fut cul-ents

suid uitcsian water.

 

Wid River code
48 ls any of the proposed operational work to allow, under the Water Act 2000, for interfering with overland flow water?
[e] No

[]_ Yes - Answer both (a) and (b) below

IPA. schedute 8, part 1, table 4, terms 3:c}(1} and 3(d)
IP Regulation. schedule 2 table 2, tem 9

IP Regulation. schedule 1 part 3 table 4, item 34
Water Act 2000. section 9668 (w.'d river area)

49 Is the proposed operational work for the following?

e For the construction of a referable dam as defined under the Water Act 2000 [=] No C1 Yes
@ © To increase the storage capacity of a referable dam by more than 10% [] No OO Yes

if yes to either or both - (Complete Part Ks) This application requires assessment by the Department of Natural Resources and Water (NRW).
lf NRW is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.

‘PA schedu'e 8, part 1, table 4 item 4
IP Reguation schedz‘e 2 table 2, item 10

TIDAL WORK; WILD RIVER AREA
4.10 Is any of the proposed operational work tidal work, other than excluded work defined under the IPA?

[2] No

(]_ Yes - Answer (a) and (b) below

IPA, schedule 8, part 1, table 4. item 5

1P Regulation, schedt'e 2 table 2, items 12, 14 and 17

IP Regulation. schedt e 1, part 3, table 4, items 4A and 5

Coastal Protection ana Management Act 1995, sechon 104A (w.'d river area)

COASTAL MANAGEMENT DISTRICT; WILD RIVER AREA

4.11 ls any of the operational work proposed to be carried out within a coastal management district?

@ [=] No

CO) Yes

SPA scnedued part tabie 4 tere &

2P Reay hedule 2 tabey tert *2 ers 14

+ Raguetar schedwe t part 3 tbe 4 dems 4A aos

Coapta: Prutecton and Management Act 1995 Act 1999 section 'O4A ‘wid * ver Ste|r
Wild Rivers Act 2005. section 434

 

WATERWAY BARRIER WORKS; WILD RIVER AREA

412 Is any of the proposed operational work for constructing or raising waterway barrier works under the Fisheries Act 1994?

[2] No
Lj Yes

IPA. screc. @& pat’ table 4 nem 6

rec. e§ prt? tabie 4 item 2
aL é 2, table 2. item 28
pat3 teb'a 4. ter 6
‘6D (wid aver area:
noe ASA

   
 
 
 

Log in to download the original (07_2431 - Operational Works - Landscaping [As Published].pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.