Original source · versioned page text
07/2431 - Operational Works - Landscaping [As Published]
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007 WILD RIVER AREA - Although legislation provides for assessment of operationa! works for residential, commercial and industrial development for the purposes of the Wild Rivers Act 2005, currently no declarations for any of the wild river areas apply the Wild Rivers code to that type of development. ASSOCIATED WITH RECONFIGURING A LOT; RESIDENTIAL, COMMERCIAL OR INDUSTRIAL DEVELOPMENT IN A WILD RIVER AREA 4.2 ls any of the proposed operational work associated with reconfiguring a lot, if the reconfiguration is also assessable? [e] No L Yes PA schedu'e 8, part 1, table 4 tem 2 P Regulation, senedu'e * part 2 tebe $ ten: tcl Wa Rivers coae Note the code ds trot Curertiy contain ape cable prov siens for residerte “ndusingi co: comm. »c ii duvelopment inside a des'gnated urbar. nfed} VEGETATION CLEARING; KOALA CONSERVATION; WILD RIVER AREA 4.3 Is any of the proposed operational work for the clearing of native vegetation to which the Vegetation Management Act 1999 applies? [2] No Cl) Yes IP& schedule & part t tate 4 bars 1A 1S IP Regulation schedu'e 4 ‘ub'e 2 ten § tvagetaton cleaning, F Reeucahon schedue 2 "26+. tee 34 .koa 2 canservation, :P Regulation schedu'e * pit 3 té Yen vegetator cleat ng wd uver tua) Vegetation Management Act 19% secton 224 (vegetation cleanng.w-a river area) Aid Rivers Act 2005, sections 31F ere 434 ‘TAKING OR INTERFERING WITH WATER; WILD RIVER AREA 44 |s any of the proposed operational work to allow, under the Water Act 2000, for taking or interfering with water from a watercourse, lake or spring (other than under the Water Act 2000, section 20(2), (3) or (5)), or from a dam constructed on a watercourse? [e] No (Yes - This application requires assessment by the Department of Natural Resources and Water (NRW). If NRW is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency IPa, schudute @ part 1, tatie 4 items 3(a) iP Regulate schedule ? table 2 item 8 IP Regulator schedute +. part 3 lable 4 items 3 and 34 “ater Act eSCl section 966A ‘wild nver area} Sala Rivers Bet 2005, section 434 45 ls any of the proposed operational work to allow, under the Water Act 2000, for taking or interfering with artesian water? [e] No (1 Yes - (Complete Part K;) This application requires assessment by the Department of Natural Resources and Water (NRW). If NRW is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. IPA schedie §, part 1. table 4. item 3¢b} iP Rege ation. sched e 2. table 2, tem & 'P Regutation, schedu:e 1 part 3, table 4 tem 3 Wid Rivers cooe ‘Nate the sede does not currently conts * applicet: = prevsiens for taking of rterfenirg with ancsian water} 46 Is any of the proposed operational work to allow, under the Water Act 2000, for taking overland flow water? [e] No [Yes - Answer (a) and (b) below IPs schedule & parti table 4 tem 3icy‘l IP Regulaton scheduis ? tub’s 2 tem 8 IP Regulation schedule 1 part3 tame 4, tem 3 Nate: Act 200C section 966A (w--¢ iver area) ‘Wild Rivers Act 2005, section 434
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (07_2431 - Operational Works - Landscaping [As Published].pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.