Skip to the record
The gold standard in government transparency.

Original source · versioned page text

07/2431 - Operational Works - Landscaping [As Published]

of 17

Page text read automatically using OCR, there may be inaccuracies

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007
If no, is the proposed operational work listed in Integrated Planning Regulation 1998, schedule 5 and does it exceed

  

the threshold?

[e] No

([]_ Yes - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.
Pkoggator ethade 2 tahe Toad
Phage ator f thee 2 tan- "bee Oe

ACID SULFATE SOILS

4.1.2 |s any of the operational work proposed in a local government area fisted? in State Planning Policy 2/02: Planning and
Managing Development involving Acid Sulfate Soils?

[2] No
[) Yes

Saurukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Bumett, Caboolture, Caims, Calliope, Caloundra, Cardwell, Carpentaria, Cook, Cooloola, Douglas,
Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrook, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mirium Vale, Momington, Noosa, Pine Rivers,
Reddliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday

{P Regulation, scheduie 2, table 3, tem 4
State Planning Poxsy 2/02 Planning and Managing Development involving Acid Sulfate Soils section 36
EASEMENTS AND SUBSTATIONS

r ) 4.1.3 |s any of the proposed operational work for filling or excavation?

[2] No
( Yes

IP Regulation, schedule 2, table 3 stem 10{a}
1 Regulation, schedule 2, table 3, ter 10(b)

4.1.4 ‘s any part of the premises subject to an easement in favour of the holder of Pipeline Licence Number 1 issued under the
Petroleum Act 1923 for the construction or operation of the Moonie to Brisbane strategic pipeline under that Act?

{e] No
CI Yes

IP Regulation schedule 2, tab'e 3 item 17

‘PUBLIC PASSENGER TRANSPORT

44 .5 Is any of the proposed operational work listed in schedule 13C of the Integrated Planning Regulation 1998 and does it exceed the
specified threshold?

[e] No
{[]_ Yes - This application must be referred to QueenslandTransport (QT) as Concurrence Agency.
@ IF Reguiation, scheds e 2, table 3. item 14

RAILWAY SAFETY AND EFFICENCY
4.1.6 Is any of the proposed operational work listed in schedule 13D of the Integrated Planning Regulation 1998 and does it exceed the
specified threshold?

[e] No
(_ Yes - This application must be referred to QueenslandTransport (QT) as Concurrence Agency.
IP Raguiaton. schedule 2, fable 3, tar 15

KOALA CONSERVATION

4.1.7 Is any part of the premises in a koala conservation area or koala sustainability area?
[e] No
([] Yes

PRea ute ssnedute 2 ube Sten 19

Log in to download the original (07_2431 - Operational Works - Landscaping [As Published].pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.