Attachment B -Minor Change approval
Original PDF page 3, section 1. The text section number identifies this passage in the reader.
5. No part of the building extension shall exceed a height of 9m to the peak or ridge of any
pitched roof, and 8m elsewhere above the natural ground level and the finished ground level.
Except for the peak of the approved annexe building which must not exceed a height of
9.05m above the natural ground level and the finished ground level.
6. Any advertising sign or device is to comply with Council's policies on advertising.
7. Security in the form of a cash bond or trading bank guarantee to the sum of $5000 must be
submitted, to secure performance of all conditions of this approval, prior to the issue of a
Development Permit for operational works. The cash bond or trading bank guarantee will
be returned on performance of the conditions of approval less any costs incurred by Council
in respect of enforcing performance of this permit.
8. The requirements of this development approval are to be effected, prior to the use of the
premises. Council reserves the right to call upon the bond or guaranteed sum referred to in
this approval to effect compliance with conditions.
9. The developer must obtain all of the other Development Permits referred to in the Decision
Notice, prior to obtaining a Development Permit for Building Works.
10. The maximum number of people to be accommodated on site is 52, which includes all
teaching, caretaking and other staff.
11. The proposed development shall have all bathroom fittings comply with the AAA Water
Conservation Rating System as defined by the AS/NZS 6400 (Water Efficient Products -
Rating and Labelling 2003) and AS/NZS 3500 (National Plumbing and Drainage Standard
Part 1.2), with toilets to comply with the AAAA Water Conservation Rating System. All tap
ware and shower roses shall not exceed a maximum flow of 9 litres per min.
12. All additional hot water systems shall be either solar systems; electric heat pump systems;
or gas systems (LPG or natural).
13. This Development Permit for a material change of use of premises lapses if:-
13.1. the use or erection of a building or other structure associated with the use, has not
happened by 19 May 2009, unless application is made and approved by Council for an
extension; or
13.2. the use of the premises (extension to educational establishment) pursuant to the
Development Permit ceases.
Land Development
Carparking Off Street
14. The new carparking shall be provided within the site as shown on Dhamma Rasmi – Master
Plan prepared by Bal Salrai LFRAIA Architect and referenced as Number 15 – Staff
Carparking, except as modified herein.
15. A minimum of 25 uncovered carpark spaces shall be provided on site, which shall include
the existing 20 spaces and the proposed new 5 spaces. The proposed new 5 spaces shall
include 1 clearly defined disabled carpark space.
16. The proposed new car parking area outside Reception Office shall be designed to comply
with the provision of AS2890.1-2004 for user class 1 with allowance for vehicles to enter and
leave the site in a forward gear.
17. The proposed new car parking area outside the Reception Office shall be kept, maintained
in a condition fit for use.
18. The new carparking area shall be free draining and the pavement constructed to a gravel
access road standard. Plans and specifications for these works shall be submitted in
conjunction with an application for a Development Permit for Operational Works.
Pathways
19. Deleted.
Page 3 of 7
Document Set ID: 21091411
Version: 5, Version Date: 21/02/2020
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.