Operational Works Report_RosesRd Access 29 April2025
Callaghan & Toth
Performance outcomes Acceptable Outcomes RESPONSE - Earthworks
Code
during the hours of 7:00am to
6:00pm, Monday to Friday and
7:00am to 3:00pm on Saturday. No
work is undertaken on Sunday or
public holidays.
Vegetative waste AO5.1
Complies with PO5
PO5 Cleared vegetation is transported off-
Vegetation cleared from a site for disposal in an approved
development site is disposed of in green waste disposal facility. There is very limited vegetation
an environmentally responsible AO5.2 clearing required for works.
manner. Cleared vegetation is mulched on- Vegetation to be cleared will be
site and reused for landscaping of mulched and used to stabilised
the finished development. disturbed areas or disposed of
AO5.3 appropriately off-site.
Cleared vegetation is disposed of for
the purpose of firewood.
AO5.4
Disposal of vegetative waste by
burning off is avoided.
Managing contamination risk
Complies with PO6
PO6 AO6.1
Materials used as fill are suitable Fill material is solid clean earth, free
for development and future use of of putrescible or refuse The works will utilise the on-site
the land and filling or excavation material, vegetation, acid sulfate material, and any imported fill will
works do not result in the soils, building or construction be clean from contaminants.
contamination of land. material or other material or
contaminants.
AO6.2
The site is not on the contaminated
land register.
Haulage activity and amenity
Complies with PO7
PO7 No acceptable outcome provided
Haulage of material to and from
a site ensures— The works will only require minor
haulage as the proposed works will
1. minimal disturbance to involve:
neighbouring properties and • Delivery of machinery,
properties along the haulage materials e.g. culverts,
route; and • Concrete trucks for slab
2. Council’s road infrastructure and crossing works, and
including pavements is not • Some fill / gravel.
adversely affected.
Extent of earthworks AO8
Complies with PO8
PO8 All earthworks, including cut and fill
The layout of the development batters, retaining walls and the like
provides adequate, clearly defined are contained within the subject site. The proposed driveway is
and easily accessible— proposed along an existing
informal access track to Lot 2,
1. on-site vehicle parking and which has adequate parking within
manoeuvring areas; and Roses Road road reserve, and
2. loading and manoeuvring manoeuvring areas.
areas for delivery and
service vehicles.
Operational Works Application – Supporting Information April 2025
36 Roses Road, Federal 11