Operational Works Report_RosesRd Access 29 April2025
Callaghan & Toth
4.2.3 Water Quality and Drainage Code
The works generally comply with the Water Quality and Drainage code, as detailed below in Tables
7 and 8 below.
Table 7: Response to Table 9.4.8.3 – Stormwater drainage design
Performance Outcomes Acceptable Outcomes RESPONSE – SW Drainage
Design
Stormwater drainage design Complies with PO1
PO1 AO1
The development and its A stormwater management plan is The stormwater drainage design for
stormwater management system prepared consistent with PSP6 the proposed driveway and culvert
is planned and designed having Engineering Design Standards - crossing includes:
regard to: Roads, drainage and earthworks. • Table drains along the
1. the natural features of driveway,
the site; • Stabilised drainage outlet
2. the need to avoid impacts points into Skyring Creek
and potential risks • Two RCP’s under the
to ecologically important driveway to accommodate
areas; overland flow paths
3. the likely effectiveness of
erosion and sediment ESC measures will be implemented
control and stormwater during works as per plans.
drainage measures during Stabilisation on site will occur
rainfall events during and following works with appropriate
post construction; and methods include grass seeding,
4. the need to protect turfing and planting creek banks with
environmental values and native species.
water quality of receiving
waters both during and post
construction.
PO2 AO2.1 Complies to PO2
Stormwater drainage Stormwater drainage planning,
infrastructure is planned, design and construction is in The stormwater drainage is
designed and constructed to: accordance with PSP6 Engineering
designed to accommodate overland
Design Standards - Roads, drainage
1. incorporate allowance for and earthworks and the latest flow on site and to maintain existing
increased flood risk and tidal version of the QUDM. flowpaths and discharges to Skyring
inundation through pipework AO2.2 Creek.
as a result of cilmate change The stormwater drainage system
and sea level rise; connects to a lawful point of
2. ensure the development is discharge in accordance with PSP6
adequately drained; and Engineering Design Standards -
3. ensure stormwater is Roads, drainage and earthworks.
managed and lawfully AO2.3
discharged without altering Stormwater flows discharging from
stormwater drainage the development are demonstrated
characteristics external to to be consistent with pre-
the site. development characteristics.
AO2.4
Development provides for the
management of stormwater to
incorporate appropriate allowance
for climate change impacts
(including rainfall intensity and sea
level rise), in accordance with PSP6
Operational Works Application – Supporting Information April 2025
36 Roses Road, Federal 13