Operational Works Report_RosesRd Access 29 April2025
Callaghan & Toth
Performance Outcomes Acceptable Outcomes RESPONSE – SW Drainage
Design
Engineering Design Standards –
Roads, Drainage and Earthworks.
PO3 AO3.1 Complies with PO3
Stormwater drainage Stormwater drainage infrastructure
infrastructure conveys run-off in a meets the desired standards of The stormwater drainage is
manner that allows roads to service for roads functionality set adequate for an access driveway.
deliver desired standards of out in PSP6 Engineering Design
service appropriate to the local Standards - Roads, Drainage and
conditions and local stormwater Earthworks.
drainage characteristics.
PO4 AO4.1 Complies with PO4
Stormwater infrastructure is The location, design and
compatible with existing construction of stormwater drainage The stormwater drainage is
infrastructure, allows for structures is in accordance adequate for an access driveway for
easy access for the ongoing with PSP6. a rural lot.
maintenance by Council, is cost AO4.2
effective across its design life. Where infrastructure is located on
private land an easement is
dedicated over the infrastructure in
accordance with PSP6
AO4.3
Any alterations or repairs to
infrastructure as a result of the
development are made at no cost to
Council.
AO4.4
Development avoids stormwater
inflow and infiltration to the sewer
infrastructure network.
AO4.5
Stormwater infrastructure is
designed to minimise maintenance
costs and the requirement for
specialized equipment for
maintenance techniques.
PO5 AO5.1 Complies with PO5
Stormwater drainage Stormwater drainage infrastructure
infrastructure is aligned to avoid avoids crossing waterways, The stormwater drainage
crossing waterways, wetlands, wetlands drainage lines requirements are to ensure flow
drainage lines and ecological and ecologically important areas or paths are maintained on site, with
important areas, or where it is follows the edge of existing existing flows diverted under the
demonstrated this is unavoidable, disturbed areas. driveway via 2 RCP’s and a table
disturbed areas are reinstated AO5.2 drain to direct flows from the
and revegetated upon completion Stormwater drainage infrastructure driveway to stable points to flow to
of works. is co-located with other Skyring Creek.
infrastructure within a combined
utility corridor where appropriate.
AO5.3
Temporary vehicular crossings of
waterways must be designed and
constructed to be consistent with the
current International Erosion Control
Association Best Practice Book
Series.
Operational Works Application – Supporting Information April 2025
36 Roses Road, Federal 14
See the original