                                                                                                           Callaghan & Toth
Performance Outcomes                                Acceptable Outcomes                   RESPONSE – SW Drainage
                                                                                          Design
                                                    Engineering Design Standards –
                                                    Roads, Drainage and Earthworks.
PO3                                                 AO3.1                                 Complies with PO3
Stormwater drainage                                 Stormwater drainage infrastructure
infrastructure conveys run-off in a                 meets the desired standards of        The stormwater drainage is
manner that allows roads to                         service for roads functionality set   adequate for an access driveway.
deliver desired standards of                        out in PSP6 Engineering Design
service appropriate to the local                    Standards - Roads, Drainage and
conditions and local stormwater                     Earthworks.
drainage characteristics.
PO4                                                 AO4.1                                Complies with PO4
Stormwater infrastructure is                        The location, design and
compatible with existing                            construction of stormwater drainage The stormwater drainage is
infrastructure, allows for                          structures is in accordance          adequate for an access driveway for
easy access for the ongoing                         with PSP6.                           a rural lot.
maintenance by Council, is cost                     AO4.2
effective across its design life.                   Where infrastructure is located on
                                                    private land an easement is
                                                    dedicated over the infrastructure in
                                                    accordance with PSP6
                                                     AO4.3
                                                    Any alterations or repairs to
                                                    infrastructure as a result of the
                                                    development are made at no cost to
                                                    Council.
                                                    AO4.4
                                                    Development avoids stormwater
                                                    inflow and infiltration to the sewer
                                                    infrastructure network.
                                                    AO4.5
                                                    Stormwater infrastructure is
                                                    designed to minimise maintenance
                                                    costs and the requirement for
                                                    specialized equipment for
                                                    maintenance techniques.
PO5                                AO5.1                                 Complies with PO5
Stormwater drainage                Stormwater drainage infrastructure
infrastructure is aligned to avoid avoids crossing waterways,            The stormwater drainage
crossing waterways, wetlands,      wetlands drainage lines               requirements are to ensure flow
drainage lines and ecological      and ecologically important areas or paths are maintained on site, with
important areas, or where it is    follows the edge of existing          existing flows diverted under the
demonstrated this is unavoidable, disturbed areas.                       driveway via 2 RCP’s and a table
disturbed areas are reinstated     AO5.2                                 drain to direct flows from the
and revegetated upon completion Stormwater drainage infrastructure driveway to stable points to flow to
of works.                          is co-located with other              Skyring Creek.
                                   infrastructure within a combined
                                   utility corridor where appropriate.
                                   AO5.3
                                   Temporary vehicular crossings of
                                   waterways must be designed and
                                   constructed to be consistent with the
                                   current International Erosion Control
                                   Association Best Practice Book
                                   Series.




Operational Works Application – Supporting Information                                                    April 2025
36 Roses Road, Federal                                                                                            14
Log in to download the original file

Operational Works Report_RosesRd Access 29 April2025.pdf · 1.1 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.