Operational Works Report_RosesRd Access 29 April2025
Callaghan & Toth
Performance Outcomes Acceptable Outcomes RESPONSES - Hydrology
are incorporated into the
development, as detailed in the
document Water Sensitive
Designs small improvements,
new ideas, concepts and sketch
designs for stormwater filtration
systems (Healthy Waterways
Water by Design).
AO11.5
Floodplain management is
designed in accordance with the
Framework for the Integration of
Flood
and Stormwater Management into
Open Space published by Healthy
Waterways Water by Design
(version current at the time of
development application)
PO12 AO12.1 Complies with PO12
Development protects in-stream Where run-off from or within
ecology by maintaining pre- the site passes through or drains The culvert crossing has been
development low flow discharge to natural designed to comply with the
regimes and maintaining fish channels, waterways or wetlands, Accepted Development
passages. development protects in-steam Requirements (ADR) for
ecology by maintaining pre- Waterway barrier Works.
development low flow discharge
regimes in accordance with the
frequent flow management
objectives in PSP6 Engineering
Design Standards - Roads,
drainage and earthworks
AO12.2
Instream structures such as
roads, bridges, culverts, and other
stormwater infrastructure do not
cause barriers to fish passage
and facilitate the movement of
terrestrial and aquatic fauna
along waterway corridors.
AO12.3
Benthic substrate retains a
continuous grade with the
direction of flow consistent with
the natural bed profile.
PO13 AO13.1 Complies with PO13
Development is designed and The location and form of
constructed to maintain surface and stormwater discharge points do The works do not impact ground
ground water balances that sustain not alter the pre-development water balances or existing
the environmental values of water hydrology of receiving surface environmental values on site.
dependent ecosystems, including water or groundwater.
downstream aquatic, There is minor clearing and the
riparian, wetland and terrestrial AO13.2 crossing has been designed to
ecosystems. Developments located on ADR requirements for waterway
groundwater recharge or barrier works.
Operational Works Application – Supporting Information April 2025
36 Roses Road, Federal 16