Operational Works Report_RosesRd Access 29 April2025
Callaghan & Toth
Performance Outcomes Acceptable Outcomes RESPONSES - Hydrology
discharge areas are designed and
managed in accordance with a
groundwater recharge and
discharge management plan
prepared by a suitably
experienced and qualified
groundwater hydrologist. The
groundwater recharge or
discharge must demonstrate that
the development does not affect
groundwater balances beyond the
property boundaries.
Editor's Note— PSP6
Engineering Design Standards -
Roads, drainage and earthworks
provides guidance on prepare a
groundwater recharge and
discharge plan.
Operational Works Application – Supporting Information April 2025
36 Roses Road, Federal 17