Operational Works Report_RosesRd Access 29 April2025
Callaghan & Toth
Performance outcomes Acceptable outcomes
Surface and ground water hydrology
PO9 AO9.1 Complies with PO9
Development ensures that the Development does not impact on
natural surface water and ground the natural surface water or The proposed works will not affect
water hydrologic regimes of groundwater hydrologic regimes the natural surface water flows and
waterways, wetlands and and this is facilitated by: regimes on site.
hydrologically-sensitive plant
communities are not adversely 1. avoiding or minimising
impacted. channelization, redirection or
interruption of flow;
Editor's Note—Groundwater 2. avoiding groundwater
dependent ecosystems are extraction;
identified on Queensland 3. maintaining groundwater
Government Wetland Info recharge and discharge
mapping. processes;
4. maintaining natural
groundwater fluctuations;
5. avoiding causing ingress of
saline water into freshwater
aquifers of wetlands; and
6. avoiding contaminants
entering groundwater (e.g.
from runoff, effluent disposal).
Operational Works Application – Supporting Information April 2025