Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

Operational Works Report_RosesRd Access 29 April2025

of 35

Page text shows just the words. Original shows the document exactly as it was published.

                                                                                                                 Callaghan & Toth


Performance outcomes                                 Acceptable outcomes

Surface and ground water hydrology
PO9                                                  AO9.1                                     Complies with PO9
Development ensures that the                         Development does not impact on
natural surface water and ground                     the natural surface water or              The proposed works will not affect
water hydrologic regimes of                          groundwater hydrologic regimes            the natural surface water flows and
waterways, wetlands and                              and this is facilitated by:               regimes on site.
hydrologically-sensitive plant
communities are not adversely                            1. avoiding or minimising
impacted.                                                   channelization, redirection or
                                                            interruption of flow;
Editor's Note—Groundwater                                2. avoiding groundwater
dependent ecosystems are                                    extraction;
identified on Queensland                                 3. maintaining groundwater
Government Wetland Info                                     recharge and discharge
mapping.                                                    processes;
                                                         4. maintaining natural
                                                            groundwater fluctuations;
                                                         5. avoiding causing ingress of
                                                            saline water into freshwater
                                                            aquifers of wetlands; and
                                                         6. avoiding contaminants
                                                            entering groundwater (e.g.
                                                            from runoff, effluent disposal).




Operational Works Application – Supporting Information                                                           April 2025
36 Roses Road, Federal                                                                                                   24
Log in to download the original file

Operational Works Report_RosesRd Access 29 April2025.pdf · 1.1 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.