Original source · versioned page text
Operational Works Report_RosesRd Access 29 April2025
Callaghan & Toth
Performance outcomes Acceptable outcomes
Rehabilitation of ecologically
important areas
PO10 AO10.1 Complies with PO10
Development provides for ecologically Landscaping and
important areas to be restored and rehabilitation complements and The works will only require
enhanced through: supports ecologically important minimal clearing of native
areas by: vegetation. Some camphor
1. designing landscaped areas to utilising local native species; laurels may also require
complement and enhance 1. utilising suitable plant removal.
existing vegetation and ecological species identified in PSP2
linkages; Landscaping; The disturbed areas will be
2. removing species likely to 2. restoring degraded stabilised with grass, or planted
displace native flora species or ecosystems to achieve a with native species on the creek
degrade fauna habitat; functional ecosystem state banks.
3. replanting and rehabilitating that requires minimal human
degraded habitat; intervention;
4. replacing 3. replicating adjacent remnant
any vegetation removed with habitats of the same type,
suitable local native species; including the
5. providing for fauna habitat; and understorey vegetation;
6. avoiding the planting of pest plant 4. creating or enhancing
species. linkages between existing
habitats;
5. avoiding the use of pest plant
species listed in PSP2 -
Landscaping;
6. planting riparian zones to
filter stormwater run-off,
stabilise soil and provide for
wildlife habitat; and
7. providing ground and
arboreal structures for fauna,
which may include ground
depressions, rocks, hollows,
nesting boxes and in-stream
habitat.
AO10.2
Vegetation cleared is replaced
with:
plantings of equivalent area that
replicate the floristic structure of
the vegetation removed; or
1. where this is not possible due
to the characteristics of
the site and the development,
plantings twice the number of
the removed trees and
plants.
Editor’s Note — Revegetation
and rehabilitation works are to be
carried out in accordance with an
approved Revegetation and
Rehabilitation Management Plan,
as referred to in PSP3 Ecological
assessment guidelines.
Operational Works Application – Supporting Information April 2025
36 Roses Road, Federal 25
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original