ORDINARY MEETING MINUTES 17 DECEMBER 2020
Damage to infrastructure
23. Any damage to footpaths, street plantings, natural vegetation/trees kerb and
channel, bridges or roadways must be repaired or reinstated to at least pre-existing
conditions.
Vacant site
24. The site must be left clean and tidy free from debris such as concrete, wire, rubble,
brick/s and the like. If the site remains vacant for more than 30 days the lot/s must
be turfed or landscaped in accordance with Planning Scheme Policy PSP 3 –
Landscaping Plants and Guidelines and to the satisfaction of Council so as to not
cause nuisance to the surrounding area.
25. All waste materials must be removed from site.
Litter, erosion and sediment control
26. Litter, erosion and sediment control measures must be installed and maintained
until soils are stabilised by turf, vegetation or sealed.
Note: it is an offence under the Environmental Protection Act 1994 to deposit or
potentially allow litter, waste, soil, or other contaminants to enter a waterway or
storm water drainage system (e.g. roadside gutter).
Asbestos
27. Removal of building materials containing asbestos must be undertaken by a
licensed asbestos removalist.
28. Asbestos removal work (Section 466) of the Work Health and Safety Regulation
2011 requires a licensed asbestos removalist to give notice to Workplace Health
and Safety Queensland (WHSQ) of licensed asbestos removal work at least five
days before the work commences. Notification must be made using Form 65:
Notification of licensed asbestos removal work, demolition work or emergency
demolition.
29. All building materials containing asbestos products are wrapped and disposed of
in accordance with the Public Health Regulation 2006 and the Environmental
Protection Regulation 2008.
Note: Asbestos is a Regulated Waste. The Department of Environment & Science
licenses businesses that transport asbestos waste, and landfills that accept this
waste.
30. All building materials containing asbestos, including asbestos cement sheeting or
roofing and lagging are removed from the building prior to demolition/relocation.
Plumbing and Drainage
31. It is a requirement of the ‘Standard Plumbing and Drainage Regulation 2019’ that
at demolition of a building, the existing sanitary drain upstream from the connection
point for a service provider’s sewerage system must be sealed water tight. This
work is deemed as notifiable Work and must be carried out by a suitably licenced
plumber who must submit an As Constructed plan and Form 4 (Notifiable Works
Form) to the QBCC (Queensland Building Construction Commission) within 10
days of completing the work.
ENGINEERING
External Works
32. Diamond Street must be upgraded for the length of its frontage to the subject site.
The works must be undertaken in accordance with an Operational Works approval
and must include in particular:
Page 14 of 25
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.