                                    Potential Risk                                                        Initial Risk                            Control Measures                                       Revised Risk                              Actions
        Source                             Event                      Risk Evaluation       Likelihood   Consequence     Rating                          Options                            Likelihood   Consequence    Rating        Who                      What
Excavations - Cont.

                                                                                                                                   1. Providing protection around an                                                             1. John    1. Ensure toolbox are carried out and
                          - Workers struck by operating plant                                                                                                                                                                               emphasize protection around
                                                                                                                                   excavation site e.g temp. fencing                                                             Holland
                          - Worker struck by reversing plant                                                                       If Work site conditions  change
                                                                                                                                   2. Providing signs for traffic andand  this
                                                                                                                                                                      pedestrians                                                Group      1.  Monitor work site conditions
                                                                                                                                                                                                                                            excavation
                          - Underground service strike                                                                             Source / Event becomes a concern a Site                                                                  2
                                                                                                                                                                                                                                            2. .Ensure
                                                                                                                                                                                                                                                 Contact  details supplied
                                                                                                                                                                                                                                                        excavation and exclusion
Use of Excavator for                                                                                                               to be made aware of the excavation site
                          - Material falling into excavation          Present
                                                                     Not       at at
                                                                         present  this
                                                                                     this                                          Specific Risk Assessment shall be                                                                        3.
                                                                                                                                                                                                                                            zoneReport  any labelled
                                                                                                                                                                                                                                                  is clearly changes in to
                                                                                                                                                                                                                                                                        the T GS and
excavating and                                                                                Likely
                                                                                              Rare          Major
                                                                                                            Minor         High
                                                                                                                          Low      3. Spotters are to assists operators to                    Likely        Minor       Medium   2. T MD
                          - Damage to machine                             location
                                                                          location                                                 undertaken and if the situation is unable to                                                             conditions   to PC excavation
                                                                                                                                                                                                                                            protection around   or Supervisor
                                                                                                                                                                                                                                                                            is
backfilling                                                                                                                        observe  and warn
                                                                                                                                   be addressed        of any
                                                                                                                                                  Contact      unidentified
                                                                                                                                                            Supervisors   and/or                                                            addressed
                                                                                                                                                                                                                                            4  Report any changes to the Team
                          - Collapse of excavation due to
                                                                                                                                   services
                                                                                                                                   T MD for further actions                                                                      3. T MI    3. Ensure signage is as per T GS and
                                                                                                                                                                                                                                            leader
                          incorrect design / digging
                          - Use of incorrect lifting points                                                                                                                                                                                 emphasize exclusion zone
                                                                                                                                                                                                                                 4. T C     4. To be made aware of the exclusion

                                                                                                                                   1. Excavation zone of influence, protection                                                              1. Ensure toolbox are carried out and
                                                                                                                                                                                                                                 1. John
                                                                                                                                   from public at all times.                                                                                emphasize protection around
                          - Trench/excavation collapse                                                                                                                                                                           Holland
                                                                                                                                   2. All spoils
                                                                                                                                   If Work   site are  to be maintained
                                                                                                                                                   conditions   change and   at this
                                                                                                                                                                                 least 2m                                                   1.  Monitor work site conditions
                                                                                                                                                                                                                                            excavation
                          - Falling/slipping into trenches                                                                                                                                                                       Group
                                                                                                                                   from
                                                                                                                                   Sourceexcavation
                                                                                                                                             / Event becomes a concern a Site                                                               2
                                                                                                                                                                                                                                            2. .Ensure
                                                                                                                                                                                                                                                 Contact  details supplied
                                                                                                                                                                                                                                                        excavation and exclusion
                          - Overturning of truck / machine into
Excavation open in site                                              Not present at this                                           Specific
                                                                                                                                   3.         Risk Assessment
                                                                                                                                      Daily toolbox    regarding theshall  be around
                                                                                                                                                                        risks                                                               3.
                                                                                                                                                                                                                                            zoneReport  any labelled
                                                                                                                                                                                                                                                  is clearly changes in to
                                                                                                                                                                                                                                                                        the T GS and
                          excavation                                       Likely             Rare
                                                                                              Likely       Minor
                                                                                                          Moderate        Low
                                                                                                                          High                                                                Likely        Minor       Medium   2. T MD
area                                                                      location                                                 undertaken and
                                                                                                                                   excavations          if the
                                                                                                                                                   are to   be situation
                                                                                                                                                               addressed  is at
                                                                                                                                                                             unable    to
                                                                                                                                                                                 toolbox                                                    conditions   to PC excavation
                                                                                                                                                                                                                                            protection around   or Supervisor
                                                                                                                                                                                                                                                                            is
                          - Collapse/damage of structures due                                                                      be addressed
                                                                                                                                   before   the startContact
                                                                                                                                                       of shift Supervisors
                                                                                                                                                                every morning   and/or                                                      4  Report any changes to the Team
                                                                                                                                                                                                                                            addressed
                          to undermining                                                                                           T MD   for 6.1
                                                                                                                                               further actions adjacent to                                                       3. T MI    3. Ensure signage is as per T GS and
                                                                                                                                                                                                                                            leader
                                                                                                                                   4. Table        Delineation
                          - Clearance to traffic                                                                                                                                                                                            emphasize exclusion zone
                                                                                                                                   excavations table shall be taken into
                                                                                                                                                                                                                                 4. T C     4. To be made aware of the exclusion
                                                                                                                                   account at all times.

                                                                                                                                                                                                                                 1. John    1. Ensure toolbox are carried out and
                                                                                                                                   1. Excavation checked after heavy rains,                                                      Holland    emphasize protection around
                                                                                                                                   If Work site conditions change and this                                                                  1.  Monitor work site conditions
                                                                                                                                                                                                                                            excavation
                                                                                                                                   severe winds etc.                                                                             Group
                          - Excavations open for long periods                                                                      Source / Event becomes a concern a Site                                                                  2
                                                                                                                                                                                                                                            2. .Ensure
                                                                                                                                                                                                                                                 Contact  details supplied
                                                                                                                                                                                                                                                        excavation and exclusion
                                                                                                                                   2. Implemented warning signage maintained
Maintenance of            - Unapproved amendments to design          Not present at this                                           Specific Risk Assessment shall be                                                                        3.
                                                                                                                                                                                                                                            zoneReport  any labelled
                                                                                                                                                                                                                                                  is clearly changes in to
                                                                                                                                                                                                                                                                        the T GS and
                                                                                              Rare          Minor          Low
                                                                                                                         Extreme   3. Housekeeping                                                                               2. T MD
excavation                - Damage to excavations due to
                                                                           Likely
                                                                          location            Likely        Major                  undertaken   and ifto besituation
                                                                                                                                                       the  maintained,   all to
                                                                                                                                                                     is unable                Likely        Minor        Low                conditions   to PC excavation
                                                                                                                                                                                                                                            protection around   or Supervisor
                                                                                                                                                                                                                                                                            is
                                                                                                                                   rubbish and waste
                                                                                                                                   be addressed         material
                                                                                                                                                  Contact        to be removed
                                                                                                                                                            Supervisors   and/or                                                            4  Report any changes to the Team
                                                                                                                                                                                                                                            addressed
                          incident or adverse weather
                                                                                                                                   daily
                                                                                                                                   T MD for further actions                                                                      3. T MI    3. Ensure signage is as per T GS and
                                                                                                                                                                                                                                            leader
                                                                                                                                                                                                                                            emphasize exclusion zone
                                                                                                                                                                                                                                 4. T C     4. To be made aware of the exclusion

                                    Potential Risk                                                        Initial Risk                            Control Measures                                       Revised Risk                              Actions
        Source                             Event                      Risk Evaluation       Likelihood   Consequence     Rating                          Options                            Likelihood   Consequence    Rating        Who                      What
Truck Mounted Attenuator


                                                                                                                                                                                                                                            A clear distance of at least 40 m must
                          Errant vehicle intrudes into work area                                                                   If Work site conditions change and this                                                                  1.
                                                                                                                                                                                                                                            be Monitor    work
                                                                                                                                                                                                                                                 maintained      site conditions
                                                                                                                                                                                                                                                             in front  of the T MA to
Works on category 3
                          and strikes workers around the                                                                           Source / Event becomes a concern a Site                                                                  2  . Contact
                                                                                                                                                                                                                                            allow  the T MAdetails  supplied
                                                                                                                                                                                                                                                             to safely  roll forward if
Multi Lane roads (80                                                                                                               Include T MA in T GS Design to provide
                          worksite                                    Present
                                                                     Not       at at
                                                                         present  this
                                                                                     this                                          Specific Risk Assessment shall be                                                                        3.  Report without
                                                                                                                                                                                                                                            impacted,    any changes
                                                                                                                                                                                                                                                                  enteringtothe work
km/h or higher) when                                                                          Likely
                                                                                              Rare       Catastrophic
                                                                                                            Minor        Extreme
                                                                                                                           Low     physical protection for road worker (AGT T M              Unlikely    Catastrophic    High    T MD
                                                                          location
                                                                          location                                                 undertaken and if the situation is unable to                                                             conditions
                                                                                                                                                                                                                                            area.         to PC or Supervisor
road closure is not                                                                                                                Part 3 Section Contact
                                                                                                                                   be addressed   5.8.1) Supervisors and/or                                                                 T his
                                                                                                                                                                                                                                            4     40 m any
                                                                                                                                                                                                                                               Report   clearance
                                                                                                                                                                                                                                                             changes is a to
                                                                                                                                                                                                                                                                          safety buffer
                                                                                                                                                                                                                                                                             the Team
                          Potential fatality or serious injury due
practical                                                                                                                          T MD for further actions                                                                                 where road workers are not permitted
                                                                                                                                                                                                                                            leader
                          to high-speed impact
                                                                                                                                                                                                                                            to enter.




                                                                                                                                                                                                                                            A clear distance of at least 40 m must
                          Errant vehicle intrudes into work area                                                                   If Work site conditions change and this                                                                  1.
                                                                                                                                                                                                                                            be Monitor    work
                                                                                                                                                                                                                                                 maintained      site conditions
                                                                                                                                                                                                                                                             in front  of the T MA to
Works on category 2
                          and strikes workers around the                                                                           Source T/ Event
Multi Lane roads (80                                                                                                               Include   MA in Tbecomes
                                                                                                                                                     GS Designa concern  a Site
                                                                                                                                                                to provide                                                                  2  . Contact
                                                                                                                                                                                                                                            allow  the T MAdetails  supplied
                                                                                                                                                                                                                                                             to safely  roll forward if
                          worksite                                    Present
                                                                     Not       at at
                                                                         present  this
                                                                                     this                                          Specific Risk Assessment shall be                                                                        impacted,
                                                                                                                                                                                                                                            3.  Report without    enteringtothe work
                                                                                                                                                                                                                                                         any changes
km/h or higher) when                                                                          Likely
                                                                                              Rare       Catastrophic
                                                                                                            Minor        Extreme
                                                                                                                           Low     physical protection for road worker (AGT T M              Unlikely    Catastrophic    High    T MD
                                                                          location                                                 undertaken and if the situation is unable to                                                             area.
                                                                                                                                                                                                                                            conditions    to PC or Supervisor
road closure is not                                                                                                                Part 3 Section 5.8.1)                                                                                    T his 40 m any
                                                                                                                                                                                                                                                        clearance    is a to
                                                                                                                                                                                                                                                                          safety buffer
                          Potential fatality or serious injury due                                                                 be addressed Contact Supervisors and/or                                                                  4  Report        changes         the Team
practical                                                                                                                          T MD for further actions                                                                                 where road workers are not permitted
                                                                                                                                                                                                                                            leader
                          to high-speed impact
                                                                                                                                                                                                                                            to enter.




                        Errant vehicle intrudes into work area                                                                     Include
                                                                                                                                   If Work T MAconditions
                                                                                                                                           site   as protection    to mitigate
                                                                                                                                                              change   and this                                                             1. Monitor work site conditions
Works on Multi Lane     and strikes workers around the                                                                             high-errant  vehicle  intrusions                                                                         Ensure road network has the capacity
                                                                                                                                   Source / Event   becomes      a concern a Site                                                           2 . Contact details supplied
                                                                                                                                                                                                                                            to accommodate a T MA turning paths,
Multi lane roads 80km/h worksite                                      Present
                                                                     Not       at at
                                                                         present  this
                                                                                     this   Moderate        Major                  Specific Risk Assessment shall be                                                                        3. Report   any changes
                                                                                             Rare           Minor         High
                                                                                                                          Low                                                                Unlikely       Major       Medium   T MD       height  clearance and roadtowidths
and above during night                                                    location                                                 Ensure  attenuator
                                                                                                                                   undertaken           rating
                                                                                                                                                and if the      appropriate
                                                                                                                                                             situation       for to
                                                                                                                                                                       is unable                                                            conditions
                                                                                                                                                                                                                                            suitability to PC or Supervisor
works                   Potential fatality or serious injury due                                                                   speed  and vehicle
                                                                                                                                   be addressed         mix Supervisors and/or
                                                                                                                                                   Contact                                                                                  4 Report any changes to the Team
                        to high-speed impact                                                                                       T MD for further actions                                                                                 leader




Works on Multi Lane
                          Errant vehicle intrudes into work area                                                                   Include
                                                                                                                                   If Work T MAconditions
                                                                                                                                           site   as protection    to mitigate
                                                                                                                                                              change   and this                                                             1. Monitor work site conditions
roads 80km/h and                                                                                                                                                                                                                            Ensure road network has the capacity
                          and strikes workers around the                                                                           high-errant  vehicle
                                                                                                                                   Source / Event        intrusions
                                                                                                                                                    becomes      a concern a Site                                                           2 . Contact details supplied
above where road                                                                                                                                                                                                                            to accommodate a T MA turning paths,
                          worksite                                    Present
                                                                     Not       at at
                                                                         present  this
                                                                                     this   Moderate                               Specific Risk Assessment shall be                                                                        3. Report any changes to
closure or road safety                                                                       Rare           Major
                                                                                                            Minor         High
                                                                                                                          Low                                                                Unlikely       Major       Medium   T MD       height clearance and road widths
                                                                          location
                                                                          location                                                 undertaken
                                                                                                                                   Ensure       and if the
                                                                                                                                           attenuator        situation
                                                                                                                                                        rating         is unable
                                                                                                                                                                appropriate  for to                                                         conditions to PC or Supervisor
barriers are not                                                                                                                                                                                                                            suitability
                          Potential fatality or serious injury due                                                                 be addressed
                                                                                                                                   speed           Contact
                                                                                                                                          and vehicle   mix Supervisors and/or                                                              4 Report any changes to the Team
practicable due to the                                                                                                             T MD for further actions                                                                                 leader
                          to high-speed impact
short duration of works



TGS TITLE:
                               John Holland Group - Lake Macdonald Drive, Lake Macdonald - SA_TT - JHG-25LV-24110095-RA - Page 11                                                                                                    Jay Persich TMD 1578 OPEN
Log in to download the original file

24110095-TGS 25-SA_TT-JHG-Lake Macdonald Dr_Lake Macdonald-R0.pdf · 1.7 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.