24110095-TGS 25-SA_TT-JHG-Lake Macdonald Dr_Lake Macdonald-R0

of 20

Page text shows just the words. Original shows the document exactly as it was published.

                                      Potential Risk                                                       Initial Risk                           Control Measures                                    Revised Risk                              Actions
         Source                              Event                     Risk Evaluation       Likelihood   Consequence     Rating                        Options                          Likelihood   Consequence    Rating        Who                    What
Temporary Traffic Management Devices

                                                                                                                                                                                                                              1. John    1. Ensure they have ordered enough
Complex traffic
                                                                                                                                                                                                                              Holland    staff to be onsite
arrangements requiring                                                                                                              1. Clearsite
                                                                                                                                    If Work  directions   written
                                                                                                                                                 conditions       on VMS
                                                                                                                                                               change   and boards
                                                                                                                                                                             this                                             Group      1.  Monitor  work to  perform
                                                                                                                                                                                                                                                            site       duties
                                                                                                                                                                                                                                                                 conditions
unusual sign                                                                                                                        with minimal  words                                                                                  2. Ensure T GS is drawn to the current
                                                                                                                                    Source  / Event  becomes a concern a Site                                                            2  . Contact details supplied
                            Road users misunderstand the                                                                                                                                                                                 standards
arrangements,                                                          Present
                                                                      Not       at at
                                                                          present  this
                                                                                      this                                          2. EnsureRisk
                                                                                                                                    Specific   redundant
                                                                                                                                                  Assessment/ conflicting
                                                                                                                                                                  shall besignage                                                        3. Report any changes to
                            intention of traffic control devices                               Likely
                                                                                               Rare          Major
                                                                                                             Minor        Extreme
                                                                                                                            Low                                                           Unlikely       Major       Medium   2. T MD    3. Ensure the site is setup as per T GS
detailed VMS                                                               location
                                                                           location                                                 undertaken
                                                                                                                                    are removedand    if the situation is unable to
                                                                                                                                                  or covered                                                                             conditions to PC or Supervisor
                                                                                                                                                                                                                                         and all conflicting signage is covered
                            causing confusion.                                                                                      be addressed Contact Supervisors and/or                                                              4  Report any changes to the Team
messages                                                                                                                                                                                                                                 4. Monitor road users and report any
                                                                                                                                    T MD for further actions                                                                  3. T MI    leader
or multiple signs for                                                                                                                                                                                                                    concerning findings to T MI
a single hazard
                                                                                                                                                                                                                              4. T C

                                                                                                                                                                                                                              1. John    1. Ensure they have ordered enough
Complex traffic
                                                                                                                                                                                                                              Holland    staff to be onsite to perform duties
arrangements requiring                                                                                                              If Work site conditions change and this                                                              1. Monitor work site conditions
                                                                                                                                                                                                                              Group      2. Ensure T GS is drawn to the current
unusual sign                                                                                                                        1. Clear /directions
                                                                                                                                    Source                written a
                                                                                                                                               Event becomes      onconcern
                                                                                                                                                                      VMS boards
                                                                                                                                                                               a Site                                                    2  . Contact details supplied
                            Insufficient information conveyed to                                                                                                                                                                         standards
arrangements,                                                          Present
                                                                      Not       at at
                                                                          present  this
                                                                                      this                                          with minimal
                                                                                                                                    Specific  Riskwords
                                                                                                                                                   Assessment shall be                                                                   3.  Report the
                                                                                                                                                                                                                                                     anysite
                                                                                                                                                                                                                                                           changes
                            road users of the complex traffic                                  Likely
                                                                                               Rare          Major
                                                                                                             Minor        Extreme
                                                                                                                            Low                                                           Unlikely       Major       Medium   2. T MD    3. Ensure           is setuptoas per T GS
detailed VMS                                                               location                                                 2. Ensure redundant
                                                                                                                                    undertaken    and if the/ situation
                                                                                                                                                              conflicting
                                                                                                                                                                        is signage
                                                                                                                                                                           unable to                                                     conditions   to PCsignage
                                                                                                                                                                                                                                         and all conflicting  or Supervisor
                                                                                                                                                                                                                                                                       is covered
                            arrangements leading to confusion
messages                                                                                                                            are removed orContact
                                                                                                                                    be addressed      covered  Supervisors and/or                                                        4
                                                                                                                                                                                                                                         4. Report
                                                                                                                                                                                                                                             Monitor any
                                                                                                                                                                                                                                                     roadchanges
                                                                                                                                                                                                                                                           users andtoreport
                                                                                                                                                                                                                                                                        the Team
                                                                                                                                                                                                                                                                              any
                                                                                                                                                                                                                              3. T MI
or multiple signs for                                                                                                               T MD for further actions                                                                             leader
                                                                                                                                                                                                                                         concerning findings to T MI
a single hazard
                                                                                                                                                                                                                              4. T C


                                                                                                                                                                                                                              1. John    1. Regular signage checks when T T M
                                                                                                                                                                                                                              Holland    are not onsite
                                                                                                                                    If Work
                                                                                                                                    1.       site frequency
                                                                                                                                       Increase   conditions of
                                                                                                                                                              change  and this
                                                                                                                                                                sign checks                                                   Group      1. Monitor work site conditions
                                                                                                                                                                                                                                         2. Design T GS to suit environmental
Road features makes         Reduced T T M device effectiveness                                                                      Source
                                                                                                                                    2.       / Event tobecomes
                                                                                                                                       Add weights               a concern a Site
                                                                                                                                                        T T M signs                                                                      2 . Contact details supplied
                                                                                                                                                                                                                                         conditions
                                                                       Present
                                                                      Not       at at
                                                                          present  this
                                                                                      this                                          Specific Risk Assessment shall be                                                                    3. Report
it difficult for signs to   creating potential confusion or                                    Likely
                                                                                               Rare          Major
                                                                                                             Minor        Extreme
                                                                                                                            Low     3. Install signs on permanent posts for                Rare          Major        Low     2. T MD    3. Setup asany
                                                                                                                                                                                                                                                      per changes
                                                                                                                                                                                                                                                          T GS and to
                                                                                                                                                                                                                                                                   record
                                                                           location                                                 undertaken and if the situation is unable to                                                         conditions  to PCchecks
                                                                                                                                                                                                                                         periodic signage    or Supervisor
be placed correctly         hazardous situations and conflicts.                                                                     works more than a single shift
                                                                                                                                    be addressed Contact Supervisors and/or                                                              4  Report  any changes   to
                                                                                                                                                                                                                                         4. Monitor signage and reporttheany
                                                                                                                                                                                                                                                                          Team
                                                                                                                                    4. Replace damaged or missing signs                                                       3. T MI
                                                                                                                                    T MD for further actions                                                                             leader
                                                                                                                                                                                                                                         concerning findings to T MI
                                                                                                                                                                                                                              4. T C

                                                                                                                                                                                                                              1. John
                                                                                                                                                                                                                              Holland    1. Provide detailed site description and
                                                                                                                                    1. Site review
                                                                                                                                    If Work         of potential
                                                                                                                                             site conditions       obstacles
                                                                                                                                                                change         for
                                                                                                                                                                         and this                                                        1.
                                                                                                                                                                                                                                         SOW Monitor work site conditions
T T M devices dislodged                                                                                                                                                                                                       Group
                                                                                                                                    implementation
                                                                                                                                    Source / Event of     T T M a concern a Site
                                                                                                                                                       becomes                                                                           2
                                                                                                                                                                                                                                         2. .Ensure
                                                                                                                                                                                                                                              Contact   details
                                                                                                                                                                                                                                                     sign       supplied
                                                                                                                                                                                                                                                          placement   is compliant
or removed due to           Reduced T T M device effectiveness
                                                                       Present
                                                                      Not       at at
                                                                          present  this
                                                                                      this                                          2. Utilized
                                                                                                                                    Specific    tolerance
                                                                                                                                              Risk           for signage
                                                                                                                                                    Assessment             placement
                                                                                                                                                                    shall be                                                             3. Ensure
                                                                                                                                                                                                                                             Report that
                                                                                                                                                                                                                                                     anySigns
                                                                                                                                                                                                                                                           changes   to
                                                                                                                                                                                                                                                                 and Devices  are
wind,                       creating potential confusion or                                    Likely
                                                                                               Rare          Major
                                                                                                             Minor        Extreme
                                                                                                                            Low                                                            Rare          Major        Low     2. T MD
                                                                           location
                                                                           location                                                 undertaken
                                                                                                                                    3. Consider and    if the methods
                                                                                                                                                  alternate    situation of
                                                                                                                                                                         is unable to
                                                                                                                                                                            designing                                                    conditions
                                                                                                                                                                                                                                         installed as to
                                                                                                                                                                                                                                                       perPC
                                                                                                                                                                                                                                                           theor Supervisor
                                                                                                                                                                                                                                                               T GS
passing traffic, theft,     hazardous situations and conflicts.                                                                     be addressed     Contact Supervisors and/or                                                          4. Report
                                                                                                                                                                                                                                         4   Monitor any
                                                                                                                                                                                                                                                     roadchanges
                                                                                                                                                                                                                                                           users andtoreport any
                                                                                                                                                                                                                                                                        the Team
                                                                                                                                    signage   placement
vandalism                                                                                                                           T MD for further actions                                                                  3. T MI    concerning findings to T MI
                                                                                                                                                                                                                                         leader
                                                                                                                                                                                                                              4. T C

                                                                                                                                                                                                                              1. John    1. Plan works in a logical sequential
Road alignment results                                                                                                                                                                                                                   manner
                                                                                                                                    1. Install repeater signage where sight                                                   Holland
in complex                                                                                                                          If Work site  conditions  change and this                                                            2. Ensure
                                                                                                                                                                                                                                         1.  MonitorT GS
                                                                                                                                                                                                                                                      workis site
                                                                                                                                                                                                                                                             designed   with
                                                                                                                                                                                                                                                                  conditions
                                                                                                                                    distances   cannot be maintained                                                          Group
requirements for the                                                                                                                Source                                                                                               wholistic approach
                                                                                                                                                                                                                                                       detailsfor  the entire
                            Reduced visibility for approaching                                                                      2. Clear /vegetation
                                                                                                                                               Event becomes     a concern
                                                                                                                                                          to increase   sight a Site                                                     2  . Contact           supplied
alignment of T T M                                                     Present
                                                                      Not       at at
                                                                          present  this
                                                                                      this                                          Specific   Risk Assessment    shall be                                                               project
                                                                                                                                                                                                                                         3.  Report any changes to
                            traffic - increased risk to road users                             Likely
                                                                                               Rare          Major
                                                                                                             Minor        Extreme
                                                                                                                            Low     distances                                              Rara          Major        Low     2. T MD
devices to ensure their                                                    location                                                 undertaken and if the situation is unable to                                                         3. Setup as to
                                                                                                                                                                                                                                         conditions   perPCT GS
                                                                                                                                                                                                                                                              or and  do regular
                                                                                                                                                                                                                                                                  Supervisor
                            and road workers                                                                                        3. Ensure redundant / conflicting signage                                                            signage
visibility and                                                                                                                      be addressed Contact Supervisors and/or                                                              4  Reportcheck
                                                                                                                                                                                                                                                    any changes to the Team
                                                                                                                                    are removed or covered                                                                    3. T MI    4. Monitor signage and report any
comprehension by the                                                                                                                T MD for further actions                                                                             leader
intended road users                                                                                                                                                                                                                      concerning findings to T MI
                                                                                                                                                                                                                              4. T C

                                      Potential Risk                                                       Initial Risk                           Control Measures                                    Revised Risk                              Actions
         Source                              Event                     Risk Evaluation       Likelihood   Consequence     Rating                        Options                          Likelihood   Consequence    Rating        Who                    What
Excavations

                                                                                                                                    1. All existing utility service drawings                                                             1. Ensure toolbox are carried out and
Planned excavation in                                                                                                                                                                                                         1. John
                                                                                                                                    reviewed for known service details and                                                               emphasize protection around
areas where live            - Risk of explosion due to gas line                                                                                                                                                               Holland
                                                                                                                                    position
                                                                                                                                    If Work site conditions change and this                                                              1.  Monitor work site conditions
                                                                                                                                                                                                                                         excavation
services maybe present      rupture                                                                                                                                                                                           Group
                                                                                                                                    2. Work /Area,
                                                                                                                                    Source     Eventincluding
                                                                                                                                                       becomes    access   routeafor
                                                                                                                                                                    a concern     Site                                                   2
                                                                                                                                                                                                                                         2. .Ensure
                                                                                                                                                                                                                                              Contact  details supplied
                                                                                                                                                                                                                                                     excavation and exclusion
including:                  - Risk of flooding of excavation and
                                                                       Present
                                                                      Not       at at
                                                                          present  this
                                                                                      this                                          plant, to be
                                                                                                                                    Specific  Riskscanned
                                                                                                                                                    Assessmentto locate exact
                                                                                                                                                                     shall be position                                                   3.
                                                                                                                                                                                                                                         zoneReport  any labelled
                                                                                                                                                                                                                                               is clearly changes in to
                                                                                                                                                                                                                                                                     the T GS and
- Electrical                adjacent areas due to water main                                   Likely
                                                                                               Rare        Moderate
                                                                                                            Minor          High
                                                                                                                           Low                                                             Likely        Minor       Medium   2. T MD
                                                                           location
                                                                           location                                                 undertaken
                                                                                                                                    of service byand    if the situation
                                                                                                                                                    competent      personis unable to                                                    conditions   to PC excavation
                                                                                                                                                                                                                                         protection around   or Supervisor
                                                                                                                                                                                                                                                                         is
- Water                     damage                                                                                                  beService
                                                                                                                                        addressed    Contact    Supervisors    and/or                                                    addressed
                                                                                                                                                                                                                                         4  Report any changes to the Team
                                                                                                                                    3.           clearly  marked    on ground,   using
- Sewerage                  - Risk of electrocution or fire due to                                                                  T MD for  further                                                                         3. T MI    3. Ensure signage is as per T GS and
                                                                                                                                    posts,  tags  etc actions                                                                            leader
- Gas                       cable strike                                                                                                                                                                                                 emphasize exclusion zone
                                                                                                                                    4. Plant access route to be indicated
- Telecommunication                                                                                                                                                                                                           4. T C     4. To be made aware of the exclusion


Planned excavation in                                                                                                               1. If Required Vegetation clearing shall be                                               1. John    1. Ensure toolbox are carried out and
                            - Risk of hazardous waste entering                                                                                                                                                                           emphasize protection around
areas where live                                                                                                                    undertaken prior to the commencement of                                                   Holland
                            excavation or water systems due to                                                                      If Work site conditions change and this                                                              1.  Monitor work site conditions
                                                                                                                                                                                                                                         excavation
services maybe present                                                                                                              works                                                                                     Group
                            live sewerage damage                                                                                    Source / Event becomes a concern a Site                                                              2
                                                                                                                                                                                                                                         2. . Ensure
                                                                                                                                                                                                                                              Contactexcavation
                                                                                                                                                                                                                                                        details supplied
                                                                                                                                                                                                                                                                  and exclusion
including:                                                                                                                          2. Distances between signs shall be moved
                            - Risk of damage to low depth             Not present at this                                           Specific Risk Assessment shall be                                                                    3.
                                                                                                                                                                                                                                         zoneReport   any labelled
                                                                                                                                                                                                                                                is clearly changes in to
                                                                                                                                                                                                                                                                      the T GS and
- Electrical                                                                Likely             Rare
                                                                                               Likely       Minor
                                                                                                           Moderate        Low
                                                                                                                           High     within                                                 Likely        Minor        High    2. T MD
                            underground services from heavy                location                                                 undertaken and if the situation is unable to                                                         conditions    to PC excavation
                                                                                                                                                                                                                                         protection around    or Supervisor
                                                                                                                                                                                                                                                                          is
- Water                                                                                                                             tolerances
                                                                                                                                    be addressedwhere  vegetation
                                                                                                                                                   Contact        cannotand/or
                                                                                                                                                            Supervisors  be                                                              4  Report any changes to the Team
                                                                                                                                                                                                                                         addressed
                            vehicles
- Sewerage                                                                                                                          removed
                                                                                                                                    T MD for further actions                                                                  3. T MI    3. Ensure signage is as per T GS and
                                                                                                                                                                                                                                         leader
                            - Risk of vehicles/ Plant entering open
- Gas                                                                                                                               3. Repeater signage shall be installed where                                                         emphasize exclusion zone
                            excavation
- Telecommunication                                                                                                                 vegetation cannot be removed                                                              4. T C     4. To be made aware of the exclusion


TGS TITLE:
                                 John Holland Group - Lake Macdonald Drive, Lake Macdonald - SA_TT - JHG-25LV-24110095-RA - Page 10                                                                                               Jay Persich TMD 1578 OPEN
Log in to download the original file

24110095-TGS 25-SA_TT-JHG-Lake Macdonald Dr_Lake Macdonald-R0.pdf · 1.7 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.