Original source · versioned page text
24110095-TGS 25-SA_TT-JHG-Lake Macdonald Dr_Lake Macdonald-R0
Typical long term
signage setup
NON KERBED ROAD = 1.5m
KERBED / BUILT AREA = 2.2m
r ive
l dD
o na
cd
e Ma
L ak
DR
IV
EN A D
E
R O OR K
W
SA
D
GROUND LEVEL
FE
L Y
R O OR K D
W EA
AD
AH
▼ Joins TTM Page 01▼
Rev Details Date By TGS TITLE:
0 Initial Release 10/07/2026 JP
John Holland Group - Lake Macdonald Drive, Lake Macdonald - SA_TT - JHG-25LV-24110095-TTM Page 02
TGS REQUIREMENTS: WORKS DESCRIPTION: SITE DESCRIPTION: SCALE OF PLAN (1 : 1000)
Signs: 4 VMS Utes: 0 Works Term: Long Traffic Clearance to Worker: N/A Road Category: 1 Direction: SB/NB N
Controllers: 2 TMA: 0 Operation: SA_T T Traffic Clearance to Excavation: N/A Road Type: Two Way Pedestrians: Past
Traffic Lights: 0 Safety Buffer: N/A Lane Width: 3.0m Traffic Clearance to Delineation: N/A Road Authority: NSC Cyclists: Not Affected
TC Utes: 2 Taper Length: N/A Depth of Excavation: N/A Traffic Cone Size: N/A Travel Path: Past Posted Speed: 80 km/h
VALID FOR 12 MONT HS FROM LAST REVISION DAT E Work Zone Speed: Retain Additional: N/A Traffic Cone Spacing @ 40km: N/A Traffic Cone Spacing @ 60km: N/A Traffic Management Designer: Jay Persich TMD 1578 OPEN RPEQ Sign Off: NO
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.