Original source · versioned page text
Appendix I - Letter of Support from Enopte Solutions
Enopte Solutions Pty Ltd 2/5 Junction Drive maw ENOPTE Scene ENERGY OPTIMISATION TECHNOLOGIES Ph: 0409478199 Letter of Support for Eco Cottages Social Housing Development Cooroy 10 March 2022 To whom it may concern, This letter is to show support for Eco Cottage’s Social Housing project at Cooroy including implementation of a microgrid to provide net zero energy to the 33 Eco Homes. Enopte has been working with Eco Cottages over the last 5 years including providing a 100kW solar system with battery storage to their facility at Jarrah St. As such Eco Cottages have achieved a net zero energy footprint for their manufacturing plant at Cooroy which includes advanced energy management to optimize the manufacturing process. A copy of the latest energy report is attached for information. Enopte has also developed a Battery Energy Storage System (BESS), currently manufactured at Coolum Beach which is being deployed with Eco Cottages across the country. Some recent installations at Agnes Waters and Pinbarren are shown below. Whilst these systems in most cases are configured as “stand alone” they can be networked into a microgrid, which is the intention for the Cooroy Social Development project.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Appendix I - Letter of Support from Enopte Solutions.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.