MCU14/0056 Traffic Addendum Att F - Information response
PEKOL TRAFFIC & TRANSPORT Myall Street / Bruce Highway Ramps Intersection A SIDRA analysis has been undertaken on the existing Myall Street / Bruce Highway Ramps priority intersection. It is noted, however, that this intersection is to be upgraded to a new two lane roundabout as part of Section A of the Bruce Highway Upgrade (Cooroy to Curra). The proposed upgrades will significantly increase capacity at this intersection. Therefore, this analysis on the existing intersection configuration represents a worst case scenario of development impact. The results of the SIDRA analysis of the Myall Street / Bruce Highway Ramps priority intersection are attached in Appendix E, and are summarised in Table 8. The following gap acceptance parameters have been adopted for this intersection: == Ahead and left turn from major road: critical gap — 5 seconds; follow-up headway - 3 seconds == Right hand turn from minor road: critical gap — 6.5 seconds; follow-up headway - 4 seconds Table 8: MYALL STREET / RRUCE HIGHWAY RAMP INTERSECTION OPERATIONS PEAK HOUR & 95% SCENARIO bos QUEUE CRITICAL MOVEMENT Evening Peak 2014 Existing 21% 0.1 Bruce Highway Ramps - Left 2017 Pre Development 22% 0.2 Bruce Highway Ramps - Left 2017 Post Development 25% 0.2 Bruce Highway Ramps - Left 2027 Pre Development 24% 0.2 Bruce Highway Ramps - Left 2026 Post Development 28% 0.2 Bruce Highway Ramps - Left Saturday Peak 2014 Existing 18% 0.1 Bruce Highway Ramps - Left 2017 Pre Development 18% 0.2 Bruce Highway Ramps - Left 2017 Post Development 21% 0.2 Bruce Highway Ramps - Left 2027 Pre Development 20% 0.2 Bruce Highway Ramps - Left 2027 Post Development 23% 0.2 Bruce Highway Ramps - Left Table 8 demonstrates that the Myall Street / Bruce Highway Ramps intersection is expected to experience “excellent” operations during the morning and evening peak periods. The addition of the development related traffic is not expected to significantly affect the critical degree of saturation or queuing. P:\2012-13\13-082 MYALL STREET, COOROY\REPORTS\INFORMATION REQUEST\MYALL STREET COOROY IR RESPONSE.DOCX 12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.