Council archive · source document
Decision Notice - DBW23 0044 [As Published] · DBW23/0044
The bond will be refunded less any costs incurred by Council in ensuring compliance with
these conditions or any additional inspections incurred for substandard work or work
undertaken not in accordance with this permit.
14. Bonds must:
a. meet the requirements of council’s relevant Planning Scheme Policy for performance
and uncompleted works;
b. be lodged with Council and accompanied by the Bond Administration Fee/s; and
c. be requested for release by writing to Council, when relevant approval requirements
have been met.
Earthworks
15. All earthworks and associated retaining structures/batters must be contained entirely within
the subject site unless written permission from the respective landowner(s) is provided to
Council. All earthworks must be undertaken in accordance with the provisions of Australian
Standard AS3798: Guidelines on Earthworks for Commercial and Residential Developments.
16. Earthworks carried out on site must not affect the structural integrity of the revetment wall,
existing fences or other structures that border the subject site. Fences that are affected must
be replaced in a timely manner and in consultation and agreement of the owners of the
related properties.
Revetment Wall / Flood Storage
17. All works must be carried out generally in accordance with the approved plans Existing &
Proposed Site Plan (33030-OW1.1) prepared by SCG Consulting dated August 2023.
18. All works for the purpose of increasing available flood storage must be located within the
4.5m setback from the revetment wall.
19. Certification of the completed works within the 4.5m setback from the revetment wall must
be submitted to Council within 3 months of the completion of the works. The certification must
be prepared by a RPEQ (Registered Professional Engineer of Queensland) and state that
the works:
a. have not negatively impacted the stability of the revetment wall or negatively impacted
the associated membrane;
b. have not reduced the available flood storage within the lot from the profile as described
in The Noosa Plan 2020 – Low Density Residential Zone Code; and
c. meet the relevant conditions of this approval.
Landscaping Works
20. A minimum of 20% of the site must be retained as soft landscaping.
21. Where excavations result in a cut face greater than 0.5m, suitable landscaping is to be
installed to soften the visual impacts of the excavations to the Noosa Waters’ Canal for the
full length of the cut face. Landscaping is to be of a suitable species and in accordance with
Noosa Plan 2020 Planning Scheme Policy PSP2 Landscaping.
5. REFERENCE DOCUMENTS
Plan No. Rev. Plan/Document Name Date
33030-OW1.1 - Existing & Proposed Site Plan, prepared by SCG August 2023
Consulting
6. REFERRAL AGENCIES
Not applicable.
Page 4 of 7
Document Set ID: 22652133
Version: 2, Version Date: 07/11/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - DBW23 0044 [As Published].pdfRelated documentApplication case desk ↗
About this file
- File size
- 247 KB (small file)
- File type
No other editions are linked here.