Appendix C Code Compliance Statements · RAL25/0019

of 17

Text shows just the words. Original shows the document exactly as it was published.

                                                                                             AO7.8
                                                                                                                                                                                            Not Applicable
                                                                                             Where no riparian buffer is nominated through the Biodiversity, Waterways and Wetlands
                                                                                                                                                                                            No waterways or waterbodies are located on site, or within proximity to the proposed
                                                                                             Overlay Map in Schedule 2, a vegetated buffer is provided no less than 10 metres wide,
                                                                                                                                                                                            development area.
                                                                                             measured from the centreline of any stream .
                                                                                             AO7.9                                                                                          Complies with AO7.9
                                                                                             Ecologically important areas are formally protected for the long term through                  A covenant has been established to the east of the site to protect the environmental
                                                                                             environmental covenant or transferal to public ownership or through gazettal of a nature       corridor. The proposed development does not encroach into this covenant and ensures
                                                                                             reserve.                                                                                       that the area remains appropriately separated.

Climate Responsive Design                                                                    AO8.1                                                                                          Not Applicable
PO8                                                                                          The lot design maximises the number of lots where the longest axis of the lot has a            The development does not propose any new lots and existing lots generally remain
The street design and lot orientation facilitates the construction of energy efficient       general east-west orientation.                                                                 consistent in size.
buildings that respond to the local climate conditions by:                                   AO8.2
a)        maximising solar access to the north;                                                                                                                                             Not Applicable
                                                                                             The street pattern maximises the number of streets running in a general north-south
b)        minimising solar access to the west;                                                                                                                                              The development does not propose any new lots or roads.
                                                                                             direction.
c)        proportioning lots and building envelopes to accommodate energy efficient
                                                                                             AO8.3
building orientation;
                                                                                             For development within the Low density residential zone each lot contains a rectangular        Not Applicable
d)        maximising access to any prevailing summer breezes; and
                                                                                             house site area where the long axis faces true north or is no more than 20 degrees off true    The proposed development is not located within the Low Density Residential Zone.
e)        minimising exposure to prevailing winter winds.
                                                                                             north and has minimum dimensions of 10 metres x 15 metres.
Neighbourhood Design
PO9                                                                                                                                                                                         Complies with AO9.1
Development provides for a lot layout, land use and infrastructure configuration that:       AO9.1
                                                                                                                                                                                            The proposed boundary realignment maintains frontage to the street along Hofmann
a)        provides for an efficient land use pattern;                                        Lots are arranged to front streets and public open space.
                                                                                                                                                                                            Drive.
b)        creates compact and walkable neighbourhoods that are well connected to
centres, employment, education facilities, community services, open space and
recreation facilities;
c)        creates useable and interconnected movement and open space networks;
d)        effectively connects and integrates the site with existing or planned
development on adjoining sites;                                                              AO9.2
                                                                                                                                                                                            Complies with AO9.2
e)        provides for moderate and large size developments to have multiple access          Development maximises opportunities for casual surveillance and avoids areas of
                                                                                                                                                                                            The proposed boundary realignment is generally regular in shape and does not promote
points;                                                                                      concealment by ensuring pathways and public open space have defined edges and are
                                                                                                                                                                                            areas of concealment.
f)        promotes a sense of community identity and belonging;                              visually exposed to roadways.
g)        promotes a variety of streetscapes;
h)        provides for a high level of amenity, having regard to potential noise, dust,
odour and lighting nuisance sources;
i)        integrates prominent site features including landmarks, native vegetation and
views into the design;
j)        discourages crime or antisocial behaviour by facilitating casual surveillance of   AO9.3
                                                                                                                                                                                            Not Applicable
streets, paths and public open space;                                                        Neighbourhoods (including roads, pathways and open space) are designed with a high
                                                                                                                                                                                            The development does not propose any new lots or roads.
k)        avoids the sporadic or out-of- sequence creation of lots; and                      degree of legibility with public spaces and corridors easy to find and recognise.
l)        protects and enhances ecologically important areas and provides for the
clustering of lots into cleared areas.
Infrastructure
                                                                                                                                                                                           Complies with PO10
PO10
                                                                                             No acceptable outcome provided                                                                The development relates to a boundary realignment of lots that are supported by existing
Development accommodates and provides for the efficient and timely delivery of
                                                                                                                                                                                           infrastructure networks.
infrastructure appropriate to the site’s setting and intended use.
PO11
Roadway and pathway layout are predominantly rectilinear with a high degree of
                                                                                                                                                                                           Not Applicable
permeability.
                                                                                             No acceptable outcome provided                                                                The development does not propose any new lots, roads or pathways.
Editor’s Note— Further detail on traffic and the road network is addressed in Part 9.4.8
Transport Code
Infrastructure and services
                                                                                                                                                                                           Not Applicable
Traffic
                                                                                             No acceptable outcome provided                                                                The development does not propose any new lots or roads that would impact on the
PO14
                                                                                                                                                                                           acceptable capacity of existing external road networks and their function.

            www.thereforgroup.com.au                                                                                        Code Compliance Statements | 21-0694P/14                                                                                                      13

Used in these records

About this file

File size
270 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Appendix C Code Compliance Statements.pdf · 270 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.