Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

2018-05-08 Planning & Environment Committee Agenda

of 125

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (14.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                       8 MAY 2018


    Submit certification
    44.   Prior to the commencement of the use certification by a suitably qualified person that
          the road tanker delivery stand has been designed, constructed and installed in
          accordance with the above requirements must be submitted to Council.
    Stage 1 vapour recovery
    45.   Prior to the commencement of the use construct and install stage 1 vapour recovery
          for underground systems storing motor spirit/petrol that has:
          a.    vapour return lines that return all vapour displaced from the storage tank to the
                delivery tanker.
          b.    a design that prevents the mixing of product in piping common to more than
                one tank.
          c.    vapour-tight couplings on the vapour line that close automatically when
                disconnected.
          d.    incompatible liquid and vapour couplings.
          e.    a pressure vacuum valve and a 10-millimetre orifice in parallel fitted to the
                storage tank vent pipe, or accepted equivalent.
          f.    the vapour recovery point located within 2 metres of the respective fill point.
    Submit certification
    46.   Prior to the commencement of the use certification by a suitably qualified person that
          stage 1 vapour recovery equipment has been constructed and installed in
          accordance with the above requirements must be submitted to Council.
    Stage 2 vapour recovery systems
    47.   Prior to the commencement of the use Stage 2 vapour recovery (VR2) equipment
          shall be designed and installed in accordance with the following:
          a.    VR2 equipment shall be installed on all dispensers for motor spirit/petrol in
                compliance with NSW DECC Standards and Best Practice Guidelines for
                Vapour Recovery at Petrol Service Stations and the Storage and Dispensing of
                Petroleum Products Planning Scheme Policy (2014).
          b.    VR2 equipment shall be designed and approved by the German TÜV and shall
                incorporate a visual indicator that the vacuum operates when fuel is dispensed.
                The approval must be in accordance with the provisions of Ordinance on the
                Limitation of Hydrocarbon Emission Resulting from the Fuelling of Motor
                Vehicles-21, BImSchV (2002).
          c.    VR2 equipment shall be installed in accordance with the manufacturer’s
                specifications by a duly qualified person.
          d.    VR2 equipment shall be tested to ensure a hydrocarbon capture efficiency must
                not be less than 85% vapour recovery to liquid dispensed by volume as
                measured using a test for active vapour recovery systems in Verein Deutscher
                Ingenieure (VDI) specification 4205. (testing is already required in Certification)
    Submit Certification
    48.   Prior to the commencement of the use VR2 equipment shall be tested by a duly
          qualified person in the manner specified in the NSW DECC Standards and Best
          Practice Guidelines for Vapour Recovery at Petrol Service Stations. A copy of this
          certification shall be provided to Council together with certification demonstrating that
          the system has been installed in accordance with the above.



                                                                                   Page 11 of 125
Log in to download the original file

2018-05-08 Planning & Environment Committee Agenda(PDF, 14MB).pdf · 14.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.