Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

2018-05-08 Planning & Environment Committee Agenda

of 125

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (14.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                     8 MAY 2018


          c.   A canopy shall be installed over fuel dispensing areas. The canopy shall
               overhang by a horizontal distance of at least one-quarter of the roof height out
               from the vertical above the boundary of the demarcated fuel dispensing area.
          d.   A liquid-tight dispenser sump is to be installed under each dispensing unit. It is
               to be designed to house all pipework joints and fittings and to collect and
               contain any leak.
          e.   Signage indicating ‘flows to stormwater treatment system’ is to be provided at
               all drainage inlets within the fuel dispensing area.
          f.   The fuel dispensing area is to be graded and drained to an independently
               certified stormwater treatment system listed on Council’s Register for Certified
               Hydrocarbon Separators. The system shall be installed in accordance with the
               approved site-based stormwater quality management plan.
    Submit certification
    40.   Prior to the commencement of the use certification by a suitably qualified person that
          the fuel dispensing area has been constructed and installed in accordance with the
          above requirements must be submitted to Council.
    Uncovered forecourt area
    41.   Prior to the commencement of the use uncovered forecourt areas must be
          constructed and installed in accordance with the following:
          a.   All ground surfaces of the uncovered forecourt area are to be constructed to
               provide a sealed surface, free of gaps or cracks.
          b.   Signage indicating 'flows to stormwater treatment system' is to be provided at
               all drainage inlets in the uncovered forecourt area.
          c.   The uncovered forecourt area is to be graded and drained to an independently
               certified stormwater treatment system listed on Council’s Register for Certified
               Hydrocarbon Separators. The system shall be installed in accordance with the
               approved site-based stormwater quality management plan.
    Submit certification
    42.   Prior to the commencement of the use certification by a suitably qualified person that
          the uncovered forecourt area has been installed and constructed in accordance with
          the above requirements must be submitted to Council.
    Road tanker delivery stands
    43.   Prior to the commencement of the use the road tanker delivery stand shall be located
          fully within the fuel dispensing area or the road tanker delivery stand located within
          the uncovered forecourt area shall be constructed and installed in accordance with
          the following:
          a.   the area shall be large enough so a tanker can fit wholly within the delivery
               stand area.
          b.   the area shall be clearly demarcated.
          c.   the area shall be drained to a collection sump that normally drains to the
               uncovered forecourt area’s stormwater treatment system.
          d.   a diversion valve shall be installed that diverts drainage to the containment and
               treatment system for the fuel dispensing area during filling operations.




                                                                                Page 10 of 125
Log in to download the original file

2018-05-08 Planning & Environment Committee Agenda(PDF, 14MB).pdf · 14.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.