PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 8 MAY 2018
c. A canopy shall be installed over fuel dispensing areas. The canopy shall
overhang by a horizontal distance of at least one-quarter of the roof height out
from the vertical above the boundary of the demarcated fuel dispensing area.
d. A liquid-tight dispenser sump is to be installed under each dispensing unit. It is
to be designed to house all pipework joints and fittings and to collect and
contain any leak.
e. Signage indicating ‘flows to stormwater treatment system’ is to be provided at
all drainage inlets within the fuel dispensing area.
f. The fuel dispensing area is to be graded and drained to an independently
certified stormwater treatment system listed on Council’s Register for Certified
Hydrocarbon Separators. The system shall be installed in accordance with the
approved site-based stormwater quality management plan.
Submit certification
40. Prior to the commencement of the use certification by a suitably qualified person that
the fuel dispensing area has been constructed and installed in accordance with the
above requirements must be submitted to Council.
Uncovered forecourt area
41. Prior to the commencement of the use uncovered forecourt areas must be
constructed and installed in accordance with the following:
a. All ground surfaces of the uncovered forecourt area are to be constructed to
provide a sealed surface, free of gaps or cracks.
b. Signage indicating 'flows to stormwater treatment system' is to be provided at
all drainage inlets in the uncovered forecourt area.
c. The uncovered forecourt area is to be graded and drained to an independently
certified stormwater treatment system listed on Council’s Register for Certified
Hydrocarbon Separators. The system shall be installed in accordance with the
approved site-based stormwater quality management plan.
Submit certification
42. Prior to the commencement of the use certification by a suitably qualified person that
the uncovered forecourt area has been installed and constructed in accordance with
the above requirements must be submitted to Council.
Road tanker delivery stands
43. Prior to the commencement of the use the road tanker delivery stand shall be located
fully within the fuel dispensing area or the road tanker delivery stand located within
the uncovered forecourt area shall be constructed and installed in accordance with
the following:
a. the area shall be large enough so a tanker can fit wholly within the delivery
stand area.
b. the area shall be clearly demarcated.
c. the area shall be drained to a collection sump that normally drains to the
uncovered forecourt area’s stormwater treatment system.
d. a diversion valve shall be installed that diverts drainage to the containment and
treatment system for the fuel dispensing area during filling operations.
Page 10 of 125
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.