Original source · versioned page text
2018-05-08 Planning & Environment Committee Agenda
The original of this document is very large (14.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 8 MAY 2018 RECOMMENDATION That Council note the report by the Development Planner to the Planning & Environment Committee Meeting dated 8 May 2018 regarding Application No. MCU17/0546 for a Development Permit for Material Change of Use - Home Based Business - Type 3 Significant Scale situated at 54 Boronia Rd, Cootharaba and: A. Approve the application in accordance with the following conditions: Approved Plans 1. Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions. Plan No. Plan/Document Name Date D-01 Site Plan, Martoo Consulting 1 November 2017 Nature and Extent of Approved Use 2. The business use must not exceed a floor area of 360m2. In addition to this area, any outdoor parking of trailers must not exceed 2 at any one time. 3. A maximum of 2 deliveries per month is allowed. 4. The approved use must not operate outside the hours of 7.30am- 5.00pm Monday to Friday and 8.00am to 1.00pm on Saturdays. The use must not operate on public holidays. Site Access and Carparking 5. A sealed access driveway must be provided from Boronia Road to all parking and manoeuvring areas of the development. The works must be undertaken in accordance with an Operational Works approval and must include in particular a driveway crossover in accordance with Council’s standard drawing RS-056. 6. A minimum of 6 car parking spaces must be provided on the site and accessible at all times while the use is open for business. The works must be in accordance with an Operational Works approval and include in particular a carparking area constructed with an all-weather surface. 7. The carparking area must be designed and constructed such that all vehicles can enter and exit the site in a forward gear. 8. All car parking areas and access driveways must be maintained: a. to ensure the carparking area is accessible in wet weather b. to ensure that no loose material is carried from the site on vehicles c. exclusively for vehicle parking and manoeuvring and kept in a tidy and safe condition at all times. 9. All fill and associated batters must be contained entirely within the subject site. 10. Timing associated with the site works are as follows: a. the applicant must lodge an Operational Works application within 2 months of the date of this approval. b. works associated with site access and car parking must be completed within 3 months from the date of the Operational Works approval. Page 42 of 125
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.